1 |
Nguyen, H. M., Mai, L. T., & Huynh, T. L. (2019). The role of transformational leadership toward work performance through intrinsic motivation: A study in the pharmaceutical field in vietnam. Journal of Asian Finance, Economics and Business, 6(4), 201-212. https://doi.org/10.13106/jafeb.2019.vol6.no4.201
DOI
|
2 |
Nguyen, H. M., & Ngoc, B. H. (2020). Energy consumption - economic growth nexus in vietnam: An ardl approach with a structural break. Journal of Asian Finance, Economics and Business, 7(1), 101-110. https://doi.org/10.13106/jafeb.2020.vol7.no1.101
DOI
|
3 |
Nguyen, H. M., Nguyen, C., Ngo, T. T., & Nguyen, L. V. (2019). The effects of job crafting on work engagement and work performance: A study of vietnamese commercial banks. Journal of Asian Finance, Economics and Business, 6(2), 189-201. https://doi.org/10.13106/jafeb.2019.vol6.no2.189
DOI
|
4 |
Nguyen, K. Q. (2008). Impacts of a rise in electricity tariff on prices of other products in vietnam. Energy Policy, 36(8), 3145-3149. https://doi.org/10.1016/j.enpol.2008.04.013
DOI
|
5 |
Nguyen, M. H., Tran, B. T., & Huynh, L. T. (2019). Relation between employees and customers affects to the positive word of mouth through customer satisfaction. Journal of Distribution Science, 17(6), 65-75. https://doi.org/10.15722/JDS.17.6.201906.65
DOI
|
6 |
Nguyen, P., & Nguyen, P. (2020). Risk management in engineering and construction: A case study in design-build projects in vietnam. Engineering, Technology & Applied Science Research, 10(1), 5237-5241.
DOI
|
7 |
Nguyen, P. T., & Likhitruangsilp, V. (2017). Identification risk factors affecting concession period length for public-private partnership infrastructure projects. International Journal of Civil Engineering and Technology, 8(6), 342-348.
|
8 |
Nguyen, P. V., Nguyen, P. T., Nguyen, Q. L. H. T. T., & Huynh, V. D. B. (2019). Extended fuzzy analytical hierarchy process approach in determinants of employees' competencies in the fourth industrial revolution. International Journal of Advanced Computer Science and Applications, 10(4), 150-154. https://doi.org/10.14569/IJACSA.2019.0100417
|
9 |
Pham, H. C., Dao, N. N., Cho, S., Nguyen, P. T., & Pham-Hang, A. T. (2019). Construction hazard investigation leveraging object anatomization on an augmented photoreality platform. Applied Sciences (Switzerland), 9(21). https://doi.org/10.3390/app9214477
|
10 |
Qamruzzaman, M., Karim, S., & Wei, J. (2019). Does asymmetric relation exist between exchange rate and foreign direct investment in bangladesh? Evidence from nonlinear ardl analysis. Journal of Asian Finance, Economics and Business, 6(4), 115-128. https://doi.org/10.13106/jafeb.2019.vol6.no4.115
DOI
|
11 |
Rafiei, M. H., & Adeli, H. (2018). Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12), 04018106. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001570
|
12 |
Saar, C. C., Chuing, L. S., Yusof, A. M., Zakaria, R., & Chuan, T. M. (2019). Construction cost index: A case study in malaysia. Paper presented at the IOP Conference Series: Materials Science and Engineering.
|
13 |
Shahandashti, S., & Ashuri, B. (2013). Forecasting engineering news-record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), 1237-1243. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000689
DOI
|
14 |
To, A. H., Ha, D. T. T., Nguyen, H. M., & Vo, D. H. (2019). The impact of foreign direct investment on environment degradation: Evidence from emerging markets in asia. International Journal of Environmental Research and Public Health, 16(9). https://doi.org/10.3390/ijerph16091636
|
15 |
Akintoye, A., Bowen, P., & Hardcastle, C. (1998). Macro-economic leading indicators of construction contract prices. Construction Management & Economics, 16(2), 159-175. https://doi.org/10.1080/014461998372466
DOI
|
16 |
Boskin, M. J., Dulberger, E. L., Gordon, R. J., Griliches, Z., & Jorgenson, D. W. (1998). Consumer prices, the consumer price index, and the cost of living. Journal of Economic Perspectives, 12(1), 3-26. https://doi.org/10.1257/jep.12.1.3
DOI
|
17 |
Sy, D. T., Likhitruangsilp, V., Onishi, M., & Nguyen, P. T. (2017). Different perceptions of concern factors for strategic investment of the private sector in public-private partnership transportation projects. ASEAN Engineering Journal, 7(2), 66-86.
DOI
|
18 |
Cao, Y., & Ashuri, B. (2020). Predicting the volatility of highway construction cost index using long short-term memory. Journal of Management in Engineering, 36(4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000784
|
19 |
da Silva, G. J. C., & Pirtouscheg, L. A. S. (2015). Basic interest rate, bank competition and bank spread in personal credit operations in brazil: A theoretical and empirical analysis. EconomiA, 16(1), 32-45. https://doi.org/10.1016/j.econ.2014.12.001
DOI
|
20 |
Devaraj, S., Patel, P. C., & Hicks, M. J. (2020). Must access laws for opioid prescription and county gross domestic product: Evidence from the us. Applied Economics Letters. https://doi.org/10.1080/13504851.2020.1740155
|
21 |
Tu, M. T. C., & Giang, H. T. T. (2018). Estimating the impact of trade cost on export: A case study vietnam. Journal of Asian Finance, Economics and Business, 5(3), 43-50. https://doi.org/10.13106/jafeb.2018.vol5.no3.43
DOI
|
22 |
Vo, K. D., Nguyen, P. T., & Le-Hoai, L. (2019). The difference in personality traits of construction engineers in vietnam using the kts instrument. Suranaree Journal of Science and Technology, 26(2), 232-239.
|
23 |
Wang, J., & Ashuri, B. (2017). Predicting enr construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), 47-63. https://doi.org/10.1080/15578771.2016.1235063
DOI
|
24 |
Wrana, J., & Nguyen, T. X. T. (2019). 'Strategic coupling' and regional development in a transition economy: What can we learn from vietnam? Area Development and Policy, 4(4), 455-466. https://doi.org/10.1080/23792949.2019.1608838
|
25 |
Zhang, R., Xing, J., Ye, K., Lu, W., & Shan, Y. (2019). Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), 367-385. https://doi.org/10.1108/ECAM-02-2018-0045
DOI
|
26 |
Ha, N. M., Le, N. D., & Trung-Kien, P. (2019). The impact of urbanization on income inequality: A study in vietnam. Journal of Risk and Financial Management, 12(3), 14. https://doi.org/10.3390/jrfm12030146
DOI
|
27 |
El-Adaway, I. H., Ali, G. G., Abotaleb, I. S., & Barber, H. M. (2020). Studying the relationship between stock prices of publicly traded us construction companies and gross domestic product: Preliminary step toward construction-economy nexus. Journal of Construction Engineering and Management, 146(1). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001742
|
28 |
Elfahham, Y. (2019). Estimation and prediction of construction cost index using neural networks, time series, and regression. Alexandria Engineering Journal. doi:https://doi.org/10.1016/j.aej.2019.05.002
|
29 |
Gouvea, R. R., & Schettini, B. P. (2015). Empirical estimates for the brazilian total imports equation using quarterly national accounts data (1996-2010). EconomiA, 16(2), 250-271. https://doi.org/10.1016/j.econ.2015.06.001
DOI
|
30 |
Konny, C. (2020). Modernizing data collection for the consumer price index. Business Economics, 55(1), 45-52. https://doi.org/10.1057/s11369-019-00146-3
DOI
|
31 |
Mohamed Mustafa, A. M. (2019). Contribution of tourism and foreign direct investment to gross domestic product: Econometric analysis in the case of sri lanka. Journal of Asian Finance, Economics and Business, 6(4), 109-114. https://doi.org/10.13106/jafeb.2019.vol6.no4.109
DOI
|
32 |
Lalwani, V., & Chakraborty, M. (2020). Aggregate earnings and gross domestic product: International evidence. Applied Economics, 52(1), 68-84. https://doi.org/10.1080/00036846.2019.1640859
DOI
|
33 |
Lee, J. W., & Xuan, Y. (2019). Effects of technology and innovation management and total factor productivity on the economic growth of china. Journal of Asian Finance, Economics and Business, 6(2), 63-73. https://doi.org/10.13106/jafeb.2019.vol6.no2.63
DOI
|
34 |
Ling, F. Y. Y., & Hoang, V. T. P. (2010). Political, economic, and legal risks faced in international projects: Case study of vietnam. Journal of Professional Issues in Engineering Education and Practice, 136(3), 156-164. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000015
DOI
|
35 |
Long, L. D., Tran, D. H., & Nguyen, P. T. (2019). Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem. International Journal of Computer Applications in Technology, 60(3), 203-214. https://doi.org/10.1504/IJCAT.2019.100299
DOI
|
36 |
Luong, D. L., Tran, D. H., & Nguyen, P. T. (2018). Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 01-13. https://doi.org/10.1080/15623599.2018.1526630
|
37 |
Moon, S., Chi, S., & Kim, D. Y. (2018). Predicting construction cost index using the autoregressive fractionally integrated moving average model. Journal of Management in Engineering, 34(2), 04017063. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000571
DOI
|