• Title/Summary/Keyword: Total Project Cost Management System

Search Result 82, Processing Time 0.025 seconds

A Study on the Development of Decision Support Program for the Survey of Land Supply and Demand (토지 공급 및 수요조사를 위한 의사결정지원 프로그램 구축 연구)

  • Lee, Sanghun;Kim, Misuk;Lee, Yunsang
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.14 no.2
    • /
    • pp.79-90
    • /
    • 2018
  • This study aims to provide the system to help decision making by finding key indicators used in land supply and demand surveys, and by developing storage priority areas and projects. As problems arose such as the rising cost of public projects or disruptions to business progress due to the rapid rise in land prices and the cost of compensation for public projects in the past, a new land policy was adopted and the land reserve system was established in 2009. At that time, The bank's goal was to conserve 2 trillion won of land per year, but the result was sluggish as it accumulated a total of 1.6 trillion won from 2009 to 2015. The reason for this sluggish result is that the type and quantity of indicators are still extensive and the survey of land supply and demand has a problem of poor utilization. In order to make up for the sluggishness, we made key indicators used in land supply and demand surveys using the question investigation, and analyzed the priority of the project areas. This study provide the system to help decision making by finding key indicators used in land supply and demand surveys, and the priorities of project areas.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

A Building Scheme on LAMIS for ROK Army (한국군 종합군수지원 관리정보체계 (LAMIS) 구축방안)

  • Hong Jang-Ui;Yun Hyeon-Cheol;Byeon Jae-Jeong
    • Journal of the military operations research society of Korea
    • /
    • v.18 no.2
    • /
    • pp.1-22
    • /
    • 1992
  • Computer-aided logistics support system is recognized an essential system to reduce supply and maintenance cost, and to improve readiness of weapon system or operationable composite machines. According to these trends, this paper focuses on the design scheme and the computerization strategy of information management system for Integrated Logistics Support (ILS) work. Suggested system. LAMIS(Logistics support Analysis Management Information System) is a total system that composed of Logistics Support Analysis Management information system (LSAM), Configuration Management Information System (CMIS), Maintenance Management Information System (MMIS), Project Management System (PMS) and Information Retrival System(IRS) etc. Also, LAMIS is a computerized tool that improves current supply and maintenance support program, that attempts to reliable requirment analysis of logistics support elements, and that supports to use the existing technical specification of similar one when weapon system acquisition project is started newly. When LAMIS implication is completed, it can be applied to logistics support of defense or commercial site. Straightway, LAMIS will be enhanced with computer - aided design system, engineering drawing system, interactive electronic technical manual system, electronic data interchange system, and three dimensional simulation system to weapon system configuration. When that is done, LAMIS is CALS system.

  • PDF

A Verification of the Project Manager-Oriented Model for Apartment Construction in the Public Sector (공공 아파트건설의 PMr형 사업관리모델에 대한 실증적 사레검증)

  • Sohn Jeong-Rak;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.191-202
    • /
    • 2004
  • In this study, the project manager-oriented organization model has been verified by analysing it with forming a clear definition of detailed unitary duty entity to develop current non-efficient CM system constituted by functional organization with the decentralized responsibility and apply the model As a result from verification that the model provides valid solutions by comparing it with the existing, the model is better than the existing in cost savings, target profit sales rate, total rate of new on sales. Moreover, various activities in cost savings and cases where improvement is feasible are executed. However, the model caused some problems in organizational operation, project management and in division of duties so this study proposed improving management method

Exploration of Life-cycle Management for Government R&D Program: the Case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 전주기 관리방안 탐색: 연구개발 부문 예비타당성조사 제도를 중심으로)

  • Ahn, Sang-Jin;Park, Eun-Ji;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.1
    • /
    • pp.124-145
    • /
    • 2014
  • Market failure occurs when Pareto efficiency is not achieved through market mechanism. In order to solve this problem, government intervene market; paying great attention to the optimum state of resource allocation. However, as the size of government investment in R&D goes up, many professionals emphasize the importance in efficient management system. This work is the result of exploratory study to look into life-cycle management of governmental R&D program. Literature reviews and empirical research on governmental R&D programs elicit improvements for effective life-cycle management of governmental R&D program as follows: consistent discrimination between capital expenditure and recurring expenditure, dual management system by spending properties, implementing total cost management system in capital expenditure, and discrimination between preliminary feasibility study with confirming total program cost in recurring expenditure.

A Basic Study for Improving of Labor Cost Survey in the Construction Market (시중노임단가 조사방법의 개선을 위한 기초연구)

  • Lee, Ju-Hyun;Beak, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.228-229
    • /
    • 2019
  • This study performs analyzing a status of labor cost policy of public construction project and labor management information system in Korea for improving of labor cost survey in the construction market. The outcome of this study will be helpful to build a labor cost information system included the information of man-hour, regular pay and benefit, total wage. And if these result is integrated with the information of worker's career, qualification, skill level, it is confidently expected that the survey of labor cost is reliable.

  • PDF

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF