CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim (Department of Civil & Environmental System Engineering, Sungkyunkwan University) ;
  • Chang-Hee Lee (Department of Civil & Environmental System Engineering, Sungkyunkwan University) ;
  • Sangyoon Chin (Department of Architectural Engineering, Sungkyunkwan University) ;
  • Cheolho Choi (Doalltech)
  • Published : 2011.02.16

Abstract

Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

Keywords

Acknowledgement

This research was supported by the Korean Institute of Construction & Transportation Technology Evaluation and Planning (KICTEP) with the program number of '06-Advanced Converging Technology- E01'. This work was also partly supported by Brain Korea 21(D184) at Sungkyunkwan University.