• Title/Summary/Keyword: Time and Capacity Constraints

Search Result 129, Processing Time 0.026 seconds

Development of Fuzzy Network Performance Manager for Token Bus Factory Automation Networks (퍼지기법을 이용한 공장자동화용 토큰버스 네트워크의 성능관리)

  • 이상오
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.04b
    • /
    • pp.471-476
    • /
    • 1995
  • This paper focues on development and implementation of a perfomance management algorithm for IEEE802.4 token bus networks to serve large-scale integrated manufacturing systems. Such factory automation networks have to satisfy delay constraints imposed on time-critical messages while maintaining as much network capacity as possible for non-time-critical messages. This paper presents the structure of a network performance manager that possesses the knowledge about perfomance management in a set of fuzzy rules and deriving its action through fuzzy inference mechanism. The efficacy of the performance management has been demonstrated by a series of simulation experiments.

  • PDF

Optimal Capacity Determination of BESS for Customer using Investment Cost and Electric Cost (투자비용과 전기요금을 반영한 수용가 BESS의 최적용량 산정)

  • Park, Jin-Kyung;Baek, Young-Sik;Jeong, Ki-Seok;Park, Ji-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.208-213
    • /
    • 2015
  • This study presents the estimation method for the optimal capacity of BESS(Battery Energy Storage System) in order to reduce the electric charges of common consumer. The daily optimal charge and discharge plan of BESS which satisfies the given constraints is established using linear programming through the change of rated output/rated capacity of the time that shows the electric charges in the highest reduced rate has been selected. There will be a problem to compare only reduced rate because the bigger the rated capacity, the more reduced rate is increased. Therefore, rated output/rated capacity of the time when the reduced amount of electric charges for a year is higher than the investment cost of BESS was selected.

A Study on Optimization of Lane-Use and Traffic Signal Timing at a Signalized Intersection (신호교차로의 차로 배정과 신호시간 최적화 모형에 관한 연구)

  • Kim, Ju Hyun;Shin, Eon Kyo
    • International Journal of Highway Engineering
    • /
    • v.17 no.5
    • /
    • pp.93-103
    • /
    • 2015
  • PURPOSES : The purpose of this study is to present a linear programing optimization model for the design of lane-based lane-uses and signal timings for an isolated intersection. METHODS: For the optimization model, a set of constraints for lane-uses and signal settings are identified to ensure feasibility and safety of traffic flow. Three types of objective functions are introduced for optimizing lane-uses and signal operation, including 1) flow ratio minimization of a dual-ring signal control system, 2) cycle length minimization, and 3) capacity maximization. RESULTS : The three types of model were evaluated in terms of minimizing delay time. From the experimental results, the flow ratio minimization model proved to be more effective in reducing delay time than cycle length minimization and capacity maximization models and provided reasonable cycle lengths located between those of other two models. CONCLUSIONS : It was concluded that the flow ratio minimization objective function is the proper one to implement for lane-uses and signal settings optimization to reduce delay time for signalized intersections.

A Study on the Simulation about Operation Availability under Maintenance Capacity and Repair Part Constraints (정비능력, 예비품 수량 제약조건 하에서의 운용가용도 시뮬레이션 연구)

  • Park, Se-Hoon;Moon, Seong-Am;Lee, Jung-Hwan
    • Korean System Dynamics Review
    • /
    • v.11 no.2
    • /
    • pp.119-138
    • /
    • 2010
  • This study introduces the system dynamics model that simulate total operational availability when 10 equipments made of 3 major components are serviced under the constrains of the maintenance capacity level and the number of spare parts. This simulation is designed on the base of reliability engineering concept so failures of components happens with the rule of engineering factors like the mean time between failure(MTBF) of component and the next failure time of one component is effected by the conditions of other components. We analysed availability of 10 equipments under 121 constrains and executed multiple regression analysis with the simulation result. The analysis provide the managerial insight in the service fields with operation many equipments.

  • PDF

Fuzzy Network Performance Manager for Token Bus Networks by timer & Queue Capacity Adjustment (큐용량과 시간 할당에 의한 토큰버스 네트워크의 퍼지 성능관리기)

  • Lee, Sang-Ho;Yoon, Jung-A;Lee, Seok
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1994.10a
    • /
    • pp.664-669
    • /
    • 1994
  • This paper focuses on development and implementation of a performance management algorithm for IEEE802.4 token bus networks to serve large-scale integrated manufacturing systems. Such factory automation networks have to satisgy delay constraints imposed on time-critical messages while maintaining as much network capacity as possible for non-time-critical messages. This paper presents a network perfomance manager that adjusts queue apacity as well as timers by using a set of fuzzy rules and fuzzy inference mechanism. The efficacy of the performance management has been demonstrated by a series of simulation experiments.

  • PDF

A Study on Simplified-DBR Scheduling in Job Shop Environment with Due Dates (납기를 갖는 Job Shop 생산시스템에 대한 Simplified-DBR Scheduling 적용방안에 관한 연구)

  • Han, Won-Kyu;Park, Chang-Kwon
    • IE interfaces
    • /
    • v.25 no.1
    • /
    • pp.106-113
    • /
    • 2012
  • There are few factors like a due date observance of the customer's order, reducing the manufacturing lead time, and minimizing the inventory investment to successfully run the manufacturing system. It is difficult for corporation and a person concerned to be offered indicators to achieve few factors mentioned above from complex manufacturing systems having much fluctuations. Simplified-DBR based on TOC(Theory of Constraints) is a management paradigm which can offer indicators to effectively face with fluctuating market's needs when market's demand is smaller than a capacity of manufacturing system. This paper is offering a core indicator and management model which is needed to successfully run the manufacturing system for corporation and a person concerned who have short experience and knowledge and newly construct Sinplified-DBR manufacturing system. Thus, this paper provides a systemic guidance in the offered model through the simulation.

A Batch Sizing Model at a Bottleneck Machine in Production Systems (생산라인의 병목공정에서 배치크기 결정 모형)

  • Koo, Pyung-Hoi;Koh, Shie-Gheun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.2
    • /
    • pp.246-253
    • /
    • 2007
  • All of the machines in a production line can be classified into bottleneck and non-bottleneck machines. A bottleneck is a resource whose capacity limits the throughput of the whole production facility. This paper addresses a batch sizing problem at the bottleneck machine. Traditionally, most batch sizing decisions have been made based on the EOQ (economic order quantity) model where setup and inventory costs are considered while throughput rate is assumed to be given. However, since batch size affects the capacity of the bottleneck machine, the throughput rate may not be constant. As the batch size increases, the frequency of the setup decreases. The saved setup time can be transferred to processing time, which results in higher throughput. But, the larger batch size may also result in longer lead time and larger WIP inventory level. This paper presents an alternative method to determine batch size at the bottleneck machine in a manufacturing line. A linear search algorithm is introduced to find optimal throughput rate and batch size at the same time. Numerical examples are provided to see how the proposed method works and to investigate the effects of some parameters.

Optimal size of the constraint buffer in TOC (제약자원 버퍼의 최적 크기 결정)

  • Go Si Geun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.476-480
    • /
    • 2002
  • The theory of constraints (TOC) has become a valuable system in modern operations management. Using the ideas and methods of the TOC, companies can achieve a large reduction of work-in-process and finished-goods inventories, significant improvement in scheduling performance, and substantial earnings increase. The purpose of this paper is to calculate the optimal size of the time buffer which is used to accommodate disruptions in production processes and provide maximum productivity of capacity constrained resources. After the problem formulation in terms of single server queueing model, we observed the system behavior by sensitivity analyses.

  • PDF

A Study on the Models for Production Planning of Multiproduct (복합제품의 생산계획을 위한 모형수립에 관한 고찰)

  • 전만술
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.8
    • /
    • pp.49-53
    • /
    • 1983
  • The purpose of this study is to consider models for the production planning of multiproduct. Because these multiproducts use common facilities, labor, and materials, they are able to be considered jointly instead of planned independently. Initially linear programming models will be considered, followed by some examples of modeling and analysis when the cost structure is nonlinear. Basic model components are the following ; (1) inventory balance equations for each product to link successive time periods, and (2) capacity constraints for each period to represent resource limitations.

  • PDF

A Model for Optimizing Configurations of the Elevator Systems (엘리베이터 시스템 설치 사양의 최적화를 위한 모델)

  • Lee Yeong-Hae;Lee Jae-Bong
    • Journal of the military operations research society of Korea
    • /
    • v.15 no.1
    • /
    • pp.95-111
    • /
    • 1989
  • A mixted integer non-linear programming model which has the object function as minimizing building costs, and constraints with the functions for carrying capacity and service level of queueing time is developed. By using the proposed model, the most adequate on a building and the most economical elevator's specifications could be determined by sequential search method like complex method.

  • PDF