1 |
Choi, W.-J. and Ham, J.-K. (2005), TOC(Theory of Constraints) Synchronous Management, Dongyang Moongo, Seoul, Korea.
|
2 |
Eli, S.-H. and William, H.-D. (2000), Manufacturing at Warp Speed : Optimizing Supply Chain Financial Performance, Saint Lucie Press.
|
3 |
Elyakim Management Systems, (2002), Goldratt Simulator Version 1.0.
|
4 |
Hong, M. S. (2004), A Study on Developing a TOC-based Due Date Promising System, A Master's Thesis, A-Ju University, 5-8.
|
5 |
Kim, S. N. (2004), A Study on Development of CTP reflecting DBR Buffer, A Master's Thesis, A-Ju University, 14-17.
|
6 |
Kuo, T.-C., Chang, S.-H., and Huang, S.-N. (2009), Due Date Performance Improvement Using TOC's Aggregated Time Buffer Method at a Wafer Fabrication Factory, Journal of Expert Systems with Applications, 1783-1792.
|