Optimal Capacity Determination of BESS for Customer using Investment Cost and Electric Cost |
Park, Jin-Kyung
(Dept. of Electrical Engineering, Kyungpook National University)
Baek, Young-Sik (Dept. of Electrical Engineering, Kyungpook National University) Jeong, Ki-Seok (Metropolitan Transit System Research Division, Korea Railroad Research Institute) Park, Ji-Ho (Dept. of Electrical Engineering, Koje College) |
1 | Seung-hwan Oh, Chul-Yong Lee, “Economic Evaluation for Renewable Energy R&D in South Korea”, Korea Energy Economics Institute. vol. 13, No. 2, pp.171-197, September, 2014. |
2 | Korea Smart Grid Association, "Smart Grid ESS (Energy Storage System) Technology Trend Report", September, 2012. |
3 | Kyeong-Hee Cho, Seul-Ki Kim and Eung-Sang Kim, Optimal Capacity Determination Method of Battery Energy Storage System for Demand Management od Electricity Customer", vol. 62, No. 1, pp.21-28, January, 2013. |
4 | Chin H. Lo, Max D. Anderson, “Economic Dispatch and Optimal Sizing of Battery Energy Storage system in Utility Load-Leveling Operation,” IEEE Trans. on Energy Conversion, vol. 14, No. 3, pp.824-829, September 1999. DOI ScienceOn |
5 | Susan Schoenung, "Energy Storage System Cost Update", Sandia National Laboratories, April 2011 |
6 | http://cyber.kepco.co.kr |