• Title/Summary/Keyword: Time Delays

Search Result 887, Processing Time 0.031 seconds

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

Design and Implementation of Response type of Flickering Green Signal System using Beacon Message (비콘메세지를 이용한 반응형 녹색점멸 신호시스템 설계 및 구현)

  • An, Hyo-In;Mun, Hyung-Jin;Kim, Chang-Geun
    • Journal of Digital Convergence
    • /
    • v.14 no.11
    • /
    • pp.241-247
    • /
    • 2016
  • As a domestic traffic control signal system, either the system with which a traffic signal turns into green at regular intervals or the system with which an amber or a red signal flickers on local roads without heavy traffic at midnight has been utilized. However, when the former system is used for roads with light traffic at midnight, delays and congestion can be incurred. Besides, in case of the latter signal system, the risk of vehicle crash is high. This study proposes a response type of flickering green signal system that rearranges signal system after analyzing beacon messages including sensor data. The proposed system, on a trunk road or a branch road at midnight, makes the signal keep flickering in green; When a vehicle enters the range of RSE, the transfer coverage, it transmits beacon messages regularly and Agent System analyzes the messages and alters the signal. It is a system by which vehicles move following the altered signal system, which will not only ensure smooth flow but also prevent vehicles from crashing on a road with light traffic. As a result of a simulation, traffic throughput and the average waiting time displayed 10 to 30 percent better improvement than existing signal systems, in terms of performance.

The Development of Noise Management Model using Active Noise Control Technique on Construction Site (능동소음제어를 이용한 건설현장의 소음관리모델 개발 - 도심지 공사현장을 중심으로 -)

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Ahn, Joseph;Kim, Sunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Recently, many people have been damaged seriously by construction noise. Accordingly, there have been increased the complaints and disputes. These complaints should be controlled strictly. Otherwise there could be delays or stops of project and losses of time and money. For this reasons, the Korean government is trying to convert from depending on the soundproof wall to noise control system focusing on noise sources. However, it is difficult to control the noise which is generated from construction site because construction equipment has very high noise level and construction noise generates temporarily and irregularly. Also, people do not know how much low frequency affect human body adversely because they cannot perceive low frequency noise easily. Hence, recently developed countries have conducted the research on the low frequency noise which damages on human physically and mentally. However, passive noise control is insufficient to reduce the low frequency noise, but only efficient to lower the high frequency noise. Thus, an approach which can complement limitations of passive noise control is needed. Therefore, the purpose of this research is to suggest the noise management model using active noise control on construction site. Also, ANC simulation has been conducted to examine its applicability on construction equipment. As a result, it is expected that there will be a reduction of construction noise and demages, as well as both mental and physical damages.

The Analysis of Waste Factors for Business Phases on Customized Apartment Project (맞춤형 공동주택 프로젝트의 업무단계별 낭비요인 분석)

  • Choi, Jung-Im;Lee, Ki-Suk;Jung, Sung-Ho;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.146-156
    • /
    • 2013
  • Recently, to reflect the various needs of customers in the apartment field, the customized apartment has emerged. From the point of the customer, customized apartments have the definite advantage of being able to guarantee more customer options. On the other hand, from the point of the project manager, there are significant risk factors, with increase of management factors, construction delays, etc. The reasons for this are, to date, the insufficient systematic analysis of the project, and the lack of experience of similar projects. This study provides the waste factors of each phase in a customized apartment project. A survey and interview are conducted to achieve the waste factors using MUDA methodology; a process of the project was analyzed; and a factor of each process was identified. Also, AHP(Analytic Hierarchy Process) are used, to evaluate the waste factors in project stages. The AHP results show that "Design change" and "Inappropriate intervention in construction process" ranked highly in the waste factors. The results of our research will provide a countermeasure that addresses waste factors in similar projects, and contributes to reducing the extra cost and time in new projects.

Development of an Underwater Rope-cutter Device and Controller for Removal of Propeller and Shaft Foreign Material for Small Vessel (소형선박용 프로펠러 및 샤프트 이물질 제거를 위한 수중절단기 기구 설계 및 제어기 개발)

  • Lee, Hunseok;Oh, Jin-Seok;Choi, Sun-Hong
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.7
    • /
    • pp.927-935
    • /
    • 2019
  • Screw-failure accidents in small ships frequently occur in coastal waters. In particular, vessels' propulsion systems are frequently coiled due to objects such as fish-nets and ropes that float on the sea. The failure of the ship's propulsion system can cause primary accidents such as ship operation delays and drifting due to loss of power; furthermore, the possibility of secondary accidents such as those involving operators in the underwater removal of rope stuck in a propeller. Ships that do not have the proper tools to solve these problems must be either lifted onto land to be repaired or divers must dive directly under the ship to solve the problem. Accordingly, some small vessels have been equipped with rope-cutter devices on the propeller shaft to prevent ship propeller system accidents in recent years; however, they are not being applied efficiently due to the cost and time of installation. To solve these problems, this study develops an underwater rope-cutter device and controller for the removal of propeller and shaft foreign material in small vessels. This device has simple structures that use the principle of a saw. Meteor gears and crank pins were used for the straight-line rotation of saw blades of the underwater rope-cutters to allow for long strokes. Furthermore, the underwater rope-cutting machines can be operated by being connected to the ship battery. The user, a non-professional, can ensure convenience and stability by applying reverse current prevention and a speed control circuit so that it can be used more conveniently and safely.

An Authentication and Handoff Mechanism using AAA and HMIPv6 on NEMO Environment (이동 네트워크(NEMO)에서 HMIPv6를 적용한 AAA 인증 방안 연구)

  • Choi, Kyung;Kim, Mi-Hui;Chae, Ki-Joon
    • The KIPS Transactions:PartC
    • /
    • v.16C no.2
    • /
    • pp.165-182
    • /
    • 2009
  • Mobile IPv6 spends considerable bandwidth considering that its signal volume is proportional to the mobile and also it should be strengthened to support the binding signal volume, the traffic, and effective mobility. So, the study in NEMO(Network Mobility), an extended version of Mobile IPv6, has been conducted. NEMO provides its mobility by putting several mobiles and more than one portable router into one unit called as mobile network. Because nodes access Internet via the portable router at this time, it receives transparency without any additional work and that much reduces binding signal while solving binding storm. By supporting mobility, NEMO is able to have various mobile structures which realize several networks hierarchically and it is necessary to improve its safety and security by authenticating among the upper networks or the lower ones while moving. Also, it is extremely required to begin a study in the device to improve efficiency accompanied with mobility, which is executed by the fast hand-off as well as the safe authentication. For those reasons, this paper not only classifies various NEMO mobile scenarios into 7 ways, but also provides AAA authentication of each scenario, the authentication through the safety authentication and fast handoff authentication using F+HMIPv6 and the way to reduce both signaling volume and packet delays efficiently during the handoff.

The Seamless Handoff Algorithm based on Multicast Group Mechanism among RNs in a PDSN Area (PDSN 영역내의 여러 RN간 멀티캐스트 그룹 메커니즘 기반의 Seamless 핸드오프 알고리즘)

  • Shin, Dong-Jin;Kim, Su-Chang;Lim, Sun-Bae;Oh, Jae-Chun;Song, Byeong-Kwon;Jeong, Tae-Eui
    • The KIPS Transactions:PartC
    • /
    • v.9C no.1
    • /
    • pp.97-106
    • /
    • 2002
  • In 3GPP2 standard, MIP is used and a PDSN performs the function of FA to support macro mobility. When a MS is roaming from a PDSN area to another, the mobility supported is called macro mobility, while it is called micro mobility when a MS is roaming from a RN area to another in a PDSN area. Since a PDSN performs the function of FA in 3GPP2 standard, it is possible to support mobility but its mechanism is actually for supporting macro mobility, not for micro mobility, thus it is weak in processing fast and seamless handoff to support micro mobility. In this paper, we suggest the seamless handoff algorithm barred on multicast group mechanism to support micro mobility. Depending on the moving direction and velocity of a MS, the suggested algorithm constructs a multicast group of RNs on the forecasted MS's moving path, and maximally delays RNs'joining to a multicast group to increase the network efficiency. Moreover, to resolve the buffer overhead problem of the existent multicast scheme, the algorithm suggests that each RN buffers data only after the forecasted handoff time. To prove deadlock freeness and liveness of the algorithm. we use state transition diagrams, a Petri-net modeling and its reachability tree. Then, we evaluate the performance by simulation.

Model-Based Approach to Flight Test System Development to Cope with Demand for Simultaneous Guided Missile Flight Tests (동시다발적인 유도무기 비행시험 수요에 대응하기 위한 모델기반 비행시험 시스템 개발)

  • Park, Woong;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.268-277
    • /
    • 2019
  • Flight test systems should monitor various conditions in real time during flight tests and take safety measures in an emergency. The importance of ensuring test safety increases in more complicated and wider test environments. Also, due to the transition of wartime operational authority, many guided missile systems must be developed simultaneously. Early deployment and budget reduction by shortening the development and T&E periods are also necessary. Consequently, the risk of flight tests under the circumstance of inefficient test resources is increasing. To address this deficiency, a flight test system model using SysML was proposed in this study. The method of designing and verifying the test system is based on the agile shift left testing methodology of advanced T&E labs and utilizing a system reference model in the aerospace field. Through modeling and simulation analysis, early identification and correction of faults resulting from inconsistent test requirements can mitigate the risk of delays during the T&E phase of flight tests. Also, because the flight test system model was constructed using SysML, it can be applied to test various guided missile systems.

Development of V2I2V Communication-based Collision Prevention Support Service Using Artificial Neural Network (인공신경망을 활용한 V2I2V 통신 기반 차량 추돌방지 지원 서비스 개발)

  • Tak, Sehyun;Kang, Kyeongpyo;Lee, Donghoun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.18 no.5
    • /
    • pp.126-141
    • /
    • 2019
  • One of the Cooperative Intelligent Transportation System(C-ITS) priority services is collision prevention support service. Several studies have considered V2I2V communication-based collision prevention support services using Artificial Neural Networks(ANN). However, such services still show some issues due to a low penetration of C-ITS devices and large delay, particularly when loading massive traffic data into the server in the C-ITS center. This study proposes the Artificial Neural Network-based Collision Warning Service(ACWS), which allows upstream vehicle to update pre-determined weights involved in the ANN by using real-time sectional traffic information. This research evaluates the proposed service with respect to various penetration rates and delays. The evaluation result shows the performance of the ACWS increases as the penetration rate of the C-ITS devices in the vehicles increases or the delay decreases. Furthermore, it reveals a better performance is observed in more advanced ANN model-based ACWS for any given set of conditions.