Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization  

Hosny, Ossama A. (Construction & Arch. Engineering Department, The American University in Cairo)
Elbarkouky, Mohamed M.G. (Construction & Arch. Engineering Department, The American University in Cairo)
Elhakeem, Ahmed (Civil Engineering Department, Helwan University)
Publication Information
Journal of Construction Engineering and Project Management / v.5, no.1, 2015 , pp. 11-19 More about this Journal
Abstract
This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.
Keywords
Claims; Artificial Neural Networks; GA Optimization; Awareness;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Z. Ren, C. J. Anumba, O. O. Ugwa, Construction claims management: Towards an agent based approach, Engineering Construction and Architectural Management, 8, pp.185-19, 2001.
2 A. Elhakeem, T. Hegazy. Improving deterioration modeling using optimized transition probability matrices for markov chains. Proceedings of the 84th Transportation Research Board Annual Meeting, TRB, Washington, D.C., USA, 2005.
3 A. H. Boussabaine, The use of artificial neural networks in construction management: A review." Construction Management and Economics. 14, pp.427-436, 1996.   DOI   ScienceOn
4 B. Bramble, M. Callahan, Construction Delay Claims, Aspen Publishers, USA, 2010.
5 B. Shapiro, Construction Claims and Contracting Strategies, Shapiro Hankinson & Knutson and Revay & Associates Joint Seminar, Vancouver, 2004.
6 C. Sun, J. Xu, Estimation of time for Wenchuan earthquake reconstruction in China, Journal of Construction Engineering and Management, 137, pp.179-187, 2011.   DOI   ScienceOn
7 D. Arditi, O. Tokdemir, Comparison of case-based reasoning and artificial neural networks. Journal of Computating in Civil Engineering. 13, pp.162-169, 1999.   DOI
8 D. K. H. Chua, D. Z. Li, W. T. Chan, Case-based reasoning approach in bid decision making, Journal of Construction Engineering and Management, 127, pp.35-45, 2001.   DOI   ScienceOn
9 D. K. H. Chua, Y. C. Kog, P. K. Loh, E. J. Jaselskis, Model for construction budget performance-Neural network approach, Journal of Construction Engineering and Management, 123, pp.214-222, 1997.   DOI   ScienceOn
10 E. Fisk, Construction Project Administration, 8th Edition, Prentice Hall, 2005.
11 J. E. Diekmann, M. Girard, Are contract disputes predictable? Journal of Construction Engineering and Management, 121, pp.355-363, 1995.   DOI   ScienceOn
12 J. L. Kolodner, An introduction to case-based reasoning, Artificial Intelligence Review, 6, pp.3-34, 1992.   DOI
13 J.E. Diekmann, T.A Kruppenbacher, Claims analysis and computer reasoning, Journal of Construction Engineering and Management, 110, pp.391-408, 1984.   DOI   ScienceOn
14 J.H. Moore, L.R. Weatherford, Decision Modeling with Microsoft Excel, 6th Edition, Prentice Hall, New Jersey, 2001.
15 K. D. Ashley, E. L. Rissland, A case-based approach to modeling legal expertise. IEEE Expert, 3, pp.70-77, 1988.   DOI   ScienceOn
16 K. D. Ashley, Modeling legal argument: Reasoning with cases and hypotheticals. MIT Press, Cambridge, Mass, 1990.
17 M. Attalla, T. Hegazy, Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression, Journal of Construction Engineering and Management. 129, pp.405-411, 2003.   DOI   ScienceOn
18 K. Mohamed, S. Khoury, S. Hafez, Contractor's decision for bid profit reduction within opportunistic bidding behavior of claims recovery, International Journal of Project Management, 29, pp.93-107, 2011.   DOI   ScienceOn
19 K. W. Chau, Application of a PSO-based neural network in analysis of outcomes of construction claims, Automation in Construction, 16 (5), pp.642-646, 2007.   DOI   ScienceOn
20 M. Allen, T. Bench-Capon, G. Staniford, A multi agent legal argument generator, Proc., 11th International Workshop on Database and Expert Systems Application, IEEE Computer Society, Washington, D.C. pp.1074-1084, 2000.
21 M. Caudill, C. Butler, Naturally Intelligent Systems. MIT Press, Cambridge, Mass, 1990.
22 M. Kim, K. Adams, An expert system for construction contract claims." Construction Management and Economics, 7, pp.249-262, 1989.   DOI   ScienceOn
23 M. W. Emsley, D. J. Lowe, A. R. Duff, A. Harding, A. Hickson, Data modeling and the application of a neural network approach to the prediction of total construction costs, Construction Management and Economics, 20, pp.465-473, 2002.   DOI   ScienceOn
24 M.M.G. Elbarkouky, A.R. Fayek, A fuzzy preference relations consensus approach to reduce conflicts on shared responsibilities in the owner managing contractor delivery system, Journal of Construction Engineering and Management. 137, pp.609-618, 2011.   DOI   ScienceOn
25 O. Hosny, An artificial neural network approach for predicting the effect of claims on project time and cost, Engineering Research Journal, Helwan University. 106, pp.87-106, 2006.
26 P. Levin, Construction Contracts Claims, Changes, And Dispute Resolution, 2nd edition, ASCE Press, Reston, Va, 1998.
27 O. Hosny, C. Benjamin, Y. Omurtag, An Al-based decision support system for planning housing construction projects, Journal of Engineering Technology, Engineering Technology Division of the ASEE, 11, pp.12-23, 1994.
28 O. Hosny, A. Elhakeem, A. El-Zafarany, A lifecycle energy and cost approach for optimum solar-screen design, Proceedings, CSCE Annual Conference, Third International/9th Construction Specialty Conference, Ottawa, ON, pp.176-200, 2011.
29 O. Moselhi, T. Hegazy, P. Fazio, Neural networks as tools in construction, Journal of Construction Engineering and Management, 117, pp.606-625, 1991.   DOI
30 R. Taormina, K. Chau and R. Sethi, Artificial Neural Network simulation of hourly groundwater levels in a coastal aquifer system of the Venice lagoon", Engineering Applications of Artificial Intelligence, 25(8), pp.1670-1676, 2012.   DOI   ScienceOn
31 T. Gaber, L. Rabelo, O. Hosny, An integrated artificial neural networks model for industrial projects risk assessment, Engineering Management Conference, IEEE International, 206-210, 1992.
32 T. Hegazy, A. Ayed, A neural network model for parametric cost estimation of highway projects, Journal of Construction Engineering and Management, 24, pp.179-187, 1998.
33 T. M. S. Elhag, Y. M. Wang, Risk assessment for bridge maintenance projects: Neural networks versus regression techniques, Journal of Computing in Civil Engineering, 21, pp.402-409, 2007.   DOI   ScienceOn
34 T. P. Williams, Predicting changes in construction cost indexes using neural networks, Journal of Construction Engineering and Management, 120, pp.306-320, 1994.   DOI   ScienceOn