• Title/Summary/Keyword: Three Machines

Search Result 458, Processing Time 0.031 seconds

A Study on Initial FMS Design Problem considering Machine Selection, Loading and Layout (기계선택, 작업할당, 기계배치를 고려한 FMS의 초기설계에 대한 연구)

  • Ro, In-Kyu;Lee, Bum-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.4
    • /
    • pp.51-63
    • /
    • 1994
  • Many themes have been studied for FMS problems. But most researches have focused on specific themes; Machine selection, Loading, Routing, Machine layout, etc. So many decision makers who want to introduce FMS to his factory, have many problems, because they do not know either what size of FMS should be introduced or what amount of money should be invested. The objective of this research is to help the decision makers who want to introduce FMS. This research consists of three major part, first, Machine selection, second, Loading, and third, Machine Layout. In the first part of the research, machines are selected with minimum cost satisfying the given demand of each part. In the second part, each operations with its required tools are allocated to those machines. In the third part the locations of each selected machines are determined. And dissimilarity coefficients between each pair of machines are calculated as the measure of distance. With above three steps, we have selected machines, allocated operations to those machines, and the layout configuration of those machines. And for each three steps, Mixed Integer Programming models are formulated. In order to solve the large problems and reduce the computer execution time, three heuristic algorithms are developed for the three mixed integer programming models.

  • PDF

Simulation of three-phase symmetrical squirrel cage induction motors with double rotor bars (대칭3상2중롱형유도전동기의 시뮬레이션)

  • 임달호;이은웅;장석명;구태만
    • 전기의세계
    • /
    • v.30 no.6
    • /
    • pp.366-374
    • /
    • 1981
  • In most cases, simulation of induction machines under dynamic conditions have been based on two-phase models using constant circuit parameters. Squirrel cage induction machines with double rotor bars which are made for high starting torgue have lower rotor bars of sufficient depth they cannot be accurately represented by a constant rotor resistance under all operating condition. In this paper, the circuit of three-phase symmetrical induction machines is represented in two-axis model by tensor. A method for simulating three-phase squirrel cage induction machines in a dynamic conditions is presented, and the current distribution in double rotor bars is calculated under dynamic conditions.

  • PDF

A Note on Online Scheduling Problem of Three and Four Machines Under General Eligibility (작업이 일반적인 자격을 갖는 상황에서 3대의 기계와 4대의 기계의 온라인 스케줄링 문제에 대한 소고)

  • Park, Jong-Ho;Chang, Soo-Y.;Lim, Kyung-Kuk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.3
    • /
    • pp.213-217
    • /
    • 2009
  • We consider the online scheduling problems of three and four machines under eligibility constraint. Respectively for the cases of three and four machines, we prove that AW algorithm has competitive ratios of $\frac{5}{2}$ and 3 which are shown to be optimal. Also, we show that the same results hold for the semi-online cases with prior knowledge of the total and the largest processing time.

What do Smart Home Appliance Users Expect from Smart Washing Machines? -A Qualitative Exploration of Predictive Expectations for Smart Washing Machines- (스마트 가전 사용자는 스마트 세탁기에 무엇을 기대하는가? -스마트 세탁기에 대한 예측적 기대 탐색을 위한 질적 연구-)

  • Heekang Moon;Sunwoo Kim
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.47 no.1
    • /
    • pp.85-109
    • /
    • 2023
  • Laundry has traditionally been regarded as one of the most demanding household chores, but the introduction of smart washing machines is changing this perception. Although smart washing machines have been on the market for several years and consumers' perceptions of washing machines have changed, little is known about consumers' perceptions of smart washing machines. The purpose of this study is to determine what users expect from smart washing machines. We conducted two focus group interviews with sixteen participants who had used smart home appliances to acquire qualitative data. Stimuli created by the interviewees were applied in the focus group interviews to collect more insightful data. We analyzed the data using the three-step method and QSR NVivo. Analysis revealed ten categories of predictive expectations, including seven utilitarian attributes (i.e., smart functionality, smart user interface, reliability, controllability, interactivity, functional value, and economic value) and three hedonic attributes (i.e., fashionable value, psychological value, and social value). The results of this study have implications for the development of smart washing machines that would satisfy consumers by taking user expectations into account.

A Post-processing Method for 3 Rotary Type 5-axis Machines using Geometric Method (기하학적인 방법을 이용한 3 Rotary 형식 5축 가공기의 후처리 방법)

  • Yun, Jae-Deuk;Jung, Yoong-Ho;Park, Do-Hyun
    • Korean Journal of Computational Design and Engineering
    • /
    • v.14 no.5
    • /
    • pp.291-296
    • /
    • 2009
  • This paper presents a post-processing algorithm for 5-axis machines with three rotary axes (3R-2L type). 5-axis machining needs the postprocessor for converting cutter location (CL) data to machine control (NC) data. The existing methods for post-processing use inverse kinematics equations from for-ward kinematics. However in case of 5-axis machines with three rotary axes, the inverse kinematics equations are not induced directly since the forward kinematics equations are non-linear. In order to get the joint values from the forward kinematics equations, previous algorithms use numerical method for the post-processing, which needs searching algorithms with computation time and may result in fail. This paper proposes a geometric method for the post-processing of 3 rotary type 5-axis machines. Our algorithm has three advantages: first, it does not need establishing forward kinematics equations. Second, it is reliable method that eliminates any numerical methods for the inverse kinematics, resulting in the exact solution. Finally, the proposed algorithm can also be applied to 2R-3L type of 5-axis machines.

A Study on the Improvement of Printability for The Offset Printing Press in Korea (한국(韓國) 오프셋인쇄(印刷)의 인쇄적성(印刷適性) 향상(向上)에 관(關)한 연구(硏究))

  • Lee, Man-Gyo
    • Proceedings of the Korea Technical Association of the Pulp and Paper Industry Conference
    • /
    • 2006.04a
    • /
    • pp.132-145
    • /
    • 2006
  • In order to improve the printability for offset print in Korea, the experimental printing was performed with commercial press. The clue of this study is that the printing condition of the imported machines are not set properly for the Korean printing materials. Although almost all of the printing machines are imported, printing materials have to be supplied in Korea. So we need to study on the printability between Korean materials and imported machines. In spite of difficulties in experiments with commercial press, three newsprint machines and three commercial printing presses were used for this study over 5 years. As the results, the optimum range and printability coefficients were obtained.

  • PDF

Parallel Machines Scheduling with Rate-Modifying Activities to Minimize Makespan (Rate-Modifying 활동이 있는 병렬기계의 Makespan 최소화를 위한 일정 계획)

  • Cho, Hang-Min;Yim, Seung-Bin;Jeong, In-Jae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.2
    • /
    • pp.44-50
    • /
    • 2007
  • This paper deals with the problem of scheduling jobs and rate-modifying activities on parallel machines. A rate-modifying activity is an activity that changes the production rate of equipment such as maintenance and readjustment. If a job is scheduled after the rate-modifying activity, then the processing time varies depending on the modifying rate of the activity. In this study, we extend the single machine problem to parallel machines problem and propose algorithms is to schedule the rate-modifying activities and jobs to minimize the makespan on parallel machines which is NP-hard. We propose a branch and bound algorithm with three lower bounds to solve medium size problems optimally. Also we develop three heuristics, Modified Longest Processing Time, Modified MULTIFIT and Modified COMBINE algorithms to solve large size problems. The test results show that branch and bound algorithm finds the optimal solution in a reasonable time for medium size problems (up to 15 jobs and 5 machines). For large size problem, Modified COMBINE and Modified MULTIFIT algorithms outperform Modified LPT algorithm in terms of solution quality.

Fast Component Placement with Optimized Long-Stroke Passive Gravity Compensation Integrated in a Cylindrical/Tubular PM Actuator

  • Paulides, J.J.H.;Encica, L.;Meessen, K.J.;Lomonova, E.A.
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.3
    • /
    • pp.275-282
    • /
    • 2013
  • Applications such as vibration isolation, gravity compensation, pick-and-place machines, etc., would benefit from (long-stroke) cylindrical/tubular permanent magnet (PM) actuators with integrated passive gravity compensation to minimize the power consumption. As an example, in component placing (pick-and-place) machines on printed circuit boards, passive devices allow the powerless counteraction of translator including nozzles or tooling bits. In these applications, an increasing demand is arising for high-speed actuation with high precision and bandwidth capability mainly due to the placement head being at the foundation of the motion chain, hence, a large mass of this device will result in high force/power requirements for the driving mechanism (i.e. an H-bridge with three linear permanent magnet motors placed in an H-configuration). This paper investigates a tubular actuator topology combined with passive gravity compensation. These two functionalities are separately introduced, where the combination is verified using comprehensive three dimensional (3D) finite element analyses.

A Study on Environmental Vibration generated from Machines (주요 기계류에서 발생되는 환경진동에 관한 연구)

  • 박준철;유승도;김정대;황경철;최준규
    • Journal of Environmental Health Sciences
    • /
    • v.28 no.2
    • /
    • pp.1-9
    • /
    • 2002
  • This study was performed to investigate vibration generated from machines that were used at factories and construction works. Vibrations were measured at three points in a straight line based on distance from the vibration sources, and analyzed to assess the vibration bevels. The average vibration level of factory machines was 65.4dBV at 2m, and that of construction machines was 74.0dBV at 5m. Vibration attenuations was 4.0~8.2dBV by double distance. All such data were applied to gain coefficients of attenuation equations for predicting vibration level by distance from the vibration sources. Data recorded on tapes were analyzed to understand the characteristics of frequency because these characteristics are important factors to design a Plan for installing the vibration-Proof devices. Finally, considering results from these analysis, assessment, and prediction, the methods for reducing vibration generated from machines were discussed.

A Load Balancing Problem among Operators in a Nonidentical Parallel Machine Shop Considering Operator Sharing (작업자 공유가 가능한 이기종 병렬기계 작업장에서 작업자 부하균형 문제)

  • 문덕희;김대경
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.51
    • /
    • pp.41-52
    • /
    • 1999
  • In this paper, a load balancing problem among operators is considered, when one or more machines can be assigned to an operator. The machines are grouped into two types and there are more than one machines in each group. The type of machine in which a job can be processed, is determined. However, an operator can handle both types of machine. The elementary operations of a job are classified into three classes : machine-controlled elements, operator-controlled elements and machine/operator- controlled elements. The objective is to balance the workloads among operators under the constraints of available machine-time and operator-time. A heuristic solution procedure is suggested for allocating jobs to machines and allocating machines to operators. The performance of the algorithm is evaluated with various data set.

  • PDF