Hussain, SM Abdul Mannan;Sekhar, Dr.T.Seshadri;Fatima, Asra
Journal of Construction Engineering and Project Management
/
제5권2호
/
pp.11-15
/
2015
The Last PlannerSystem (LPS) has been implemented on construction projects to increase work flow reliability, a precondition for project performance againstproductivity and progress targets. The LPS encompasses four tiers of planning processes:master scheduling, phase scheduling, lookahead planning, and commitment / weeklywork planning. This research highlights deficiencies in the current implementation of LPS including poor lookahead planning which results in poor linkage between weeklywork plans and the master schedule. This poor linkage undetermines the ability of theweekly work planning process to select for execution tasks that are critical to projectsuccess. As a result, percent plan complete (PPC) becomes a weak indicator of project progress. The purpose of this research is to improve lookahead planning (the bridgebetween weekly work planning and master scheduling), improve PPC, and improve theselection of tasks that are critical to project success by increasing the link betweenShould, Can, Will, and Did (components of the LPS), thereby rendering PPC a betterindicator of project progress. The research employs the case study research method to describe deficiencies inthe current implementation of the LPS and suggest guidelines for a better application ofLPS in general and lookahead planning in particular. It then introduces an analyticalsimulation model to analyze the lookahead planning process. This is done by examining the impact on PPC of increasing two lookahead planning performance metrics: tasksanticipated (TA) and tasks made ready (TMR). Finally, the research investigates theimportance of the lookahead planning functions: identification and removal ofconstraints, task breakdown, and operations design.The research findings confirm the positive impact of improving lookaheadplanning (i.e., TA and TMR) on PPC. It also recognizes the need to perform lookaheadplanning differently for three types of work involving different levels of uncertainty:stable work, medium uncertainty work, and highly emergent work.The research confirms the LPS rules for practice and specifically the need to planin greater detail as time gets closer to performing the work. It highlights the role of LPSas a production system that incorporates deliberate planning (predetermined andoptimized) and situated planning (flexible and adaptive). Finally, the research presents recommendations for production planningimprovements in three areas: process related, (suggesting guidelines for practice),technical, (highlighting issues with current software programs and advocating theinclusion of collaborative planning capability), and organizational improvements(suggesting transitional steps when applying the LPS).
린 건설이 건설업에서 생산성 향상을 위한 새로운 관리 방식으로 소개되어진 이후 많은 연구들이 린 건설의 성공적 실행을 위해 진행되어져 왔다. 현재 미국 내 건설회사들은 린 건설학회(LCI)에서 개발한 라스트플래너(LPS) 시스템을 현장에 적용해 보고 있으며 몇몇 현장은 성공적인 공사결과를 얻어내고 있어서 향후 린 건설의 도입 가능성을 보다 높이고 있다. 또한 그 결과로 많은 회사들이 다른 회사들이 어떻게 린 건설을 수행하고 있으며, 린 건설의 장단점은 무엇인지, 그리고 자신들의 회사에 적용 가능한 것이 무엇이 있는지에 대한 정보교환에 대한 관심이 높아지고 있다. 본 연구는 사례연구를 통해 린 건설이 얼마나 효과적이며 어느 정도까지 건설현장에 도입되어져 가고 있는지 알아보고자 함에 있었다. 하지만 이 논문에서는 4단계의 LPDS를 간략히 소개하고, 또 사례현장의 개별면담과 설문조사를 통해 얻은 결과를 비교 분석하여 소개하고자 한다. 마지막으로, 린 건설의 국내현장 도입을 위한 몇가지 제안을 .제시하고자 한다. 린 건설은 아직까지 기존의 관리체계의 틀에서 완전히 벗어나지 못하고 있으나 꾸준한 연구와 사례연구를 통해 언젠가는 새로운 공사관리 혁신의 주도 시스템으로 자리 잡을 수 있을 것이라 확신한다.
Journal of the Korean Data and Information Science Society
/
제24권6호
/
pp.1369-1384
/
2013
본 연구의 목적은 국내보험 유통시장의 주된 관심사로 대두되고 있는 보험설계사의 이직과 관련하여 이직 후의 실제 만족도를 전반적, 조직 내 인간관계, 영업환경 지원, 경제적, 설계사 관리제도 등 5개 영역으로 나누어 이들에 미치는 영향요인을 분석하는 데 있다. 이를 위해 국내 생명보험 설계사들 중 이직경험이 있는 416명을 대상으로 설문조사를 실시하였는데, 그 결과는 다음과 같다. 첫째, 보험설계사의 이직 후 전반적 만족도에 영향을 미치는 요인으로는 소속회사, 보험사의 판매능력 인정도, 보험판매직에 대한 만족도, 금융 및 보험관련 수상경험, 최종 학력, 대리점 (지점)의 규모, 주위 보험판매직 인정도 순으로 나타났다. 둘째, 보험설계사의 이직 후 조직 내 인간관계 만족도에 영향을 미치는 요인으로는 대리점 (지점)의 규모, 주위 보험판매직에 대한 인정도, 소속회사 순으로 나타났다. 셋째, 보험설계사의 이직 후 영업환경 지원 만족도에 영향을 미치는 요인은 주위의 보험판매직에 대한 인정도, 소속회사, 금융 및 보험관련 자격증 수, 대리점 (지점)의 규모, 노후생활 준비도 순이었다. 넷째, 경제적 만족도의 경우 최종 학력, 결혼여부, 보험판매직에 대한 만족도, 연령순으로 나타났으며, 주로 인구통계학적 요인이 영향을 주는 것으로 나타났다. 다섯째, 보험설계사의 이직 후 설계사 관리제도 만족도에 영향을 미치는 요인으로는 경험한 이직의 유형만이 선택되었다.
건설공사 관리의 목표는 계획된 품질을 적정 비용과 공기로 완성하기 위한 것이며, 이러한 건설공사의 목표를 실현하기 위해서는 효과적인 공정관리가 필요하다. 그러나 현재의 공정관리 방식은 마일스톤에 의한 결과위주의 관리방식으로 작업간의 상호연관성과 변이발생을 충분히 고려하지 못하는 등 여러 한계점이 있다. 이와 같은 공정관리 방식의 한계점을 극복하기 위해 재고 최소화, 낭비 최소화, 관리 능률 향상, 변이 관리 능력 향상 등의 효과를 나타낼 수 있는 린 건설 도입을 제안하고 있다. 따라서 본 연구에서는 린 건설 관리 기법 중 하나인 라스트 플래너 시스템에 관한 연구를 진행하였으며, 특히 라스트 플래너 시스템에서 핵심 단계인 주단위 예상작업계획에서 이루어지는 작업제반요건 분석에 관한 연구를 진행하였다. 그 결과 공정 계획 수립 시 사전에 건설공사의 저해요소를 제어하여 작업의 신뢰도 향상 및 작업계획 달성률을 높일 수 있는 작업제반요건을 식별 및 분류하여 중요도 분석을 실시하였다.
건설산업은 불확실성이 높은 산업으로 이에 따른 비용효용성 향상 및 경쟁력 강화를 위한 연구가 다각적으로 진행되어 왔다. 린 건설의 대표적인 요소기술인 라스트플래너 시스템은 기존의 상의하달식 의사결정체계를 개선한 하의상달식 접근방식으로서, 모든 참여주체가 함께 중 단기 공정계획을 검토 시행하는 체계이다. 이와 같은 린 건설은 최근 들어 건설프로젝트에서 주도적인 역할을 하고 있는 발주자의 적극적인 참여와 전체 생애주기를 총괄할 수 있는 리더역량을 요구하는 방향으로 논의가 전개되고 있다. 그러나 발주자가 참여하는 린 건설이 성공하기 위해서는 건설주체 상호간에 요구하는 니즈(needs)수준과 이를 개선하기 위한 전략들이 우선적으로 고려되어야 한다. 본 연구에서는 건설 시공과정에서의 참여주체 니즈 요소를 규명 분석하고, 중점관리항목과 이들 항목들의 개선가능성을 도출하는 방법, 그리고 이를 기반으로 한 발주자 참여형 린 건설 협업 모델을 제시하였다.
Maintenance scheduling plays an important role in evaluating the supply reliability of power systems. Since generating units must be maintained and inspected, the generation planner must schedule planned outages during the year. Several factors entering into this scheduling analysis include: seasonal load-demand profile, amount of maintenance to bo done on all generating units, size of the units, elapsed time from last maintenance, and availability of maintenance crews. This paper proposes a new algorithm to decide the multi-year maintenance scheduling with considering the total cost. We adjust the maintenance scheduling to levelize the reliability over all period. The proposed algorithm is applied to a real size power system and the developed reliability results are obtained.
During last ten years, logistics network management has become one of the most important sources of competitive advantage regarding logistics cost and customer service in numerous business segments. The key to success in this dynamic and severe business environment is the ability to design and plan the logistics network optimally in an integrated way. Network design and planning involves many issues relating to strategic, tactical, and operational decisions. To assist a logistics designer or planner, many computer-based decision support systems (DSS) have been developed. In this paper, the issues related to design, development, and implementation of the DSS for logistics network design and planning are discussed, and an ideal framework of the DSS is proposed with some ideas on the future development. Finally, DLNET, the DSS developed by author, is briefly introduced.
Preconstruction process in a lean project delivery system was studied in one large healthcare project working for a general contractor. Researchers joined a new lean delivery project for approximately six weeks and participated in preconstruction process including design coordination, management coordination, and target costing while concurrently interviewing other project participants and employees, recording activity in meetings, and otherwise observing the process. The preconstruction process in lean project delivery system, called integrated project design, showed many benefits such as brining expertise of downstream players (i.e., mechanical and electrical contractors) into the design phase. However, lack of leadership and lack of design-integrator blocked the successful application of a new concept of design process.
Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1479-1484
/
2009
It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.
The 9th International Conference on Construction Engineering and Project Management
/
pp.686-693
/
2022
Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.