International conference on construction engineering and project management
/
2007.03a
/
pp.311-317
/
2007
"Environmentally Sound and Sustainable Development (ESSD)" is a key word in recent years. The construction industry, have put a great influence on ergonomic and sustainable environment. Recently, "green building certifications", such as Indoor Air Quality (IAQ) and eco-friendly material regulation have been established. With this regard, new construction and aged-housing remodeling projects are required to meet these certification criteria. Multi-housing residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Aged-housing remodeling project is very unique in that building residents are selected prior to design phase. Therefore, the analysis of resident's need for building materials in aged-housing remodeling is relatively easy compared to new building construction. As such, it is very important to analyze their preferences for eco-friendly materials prior to project execution. The purpose of this study is to find the needs of residents and priority of their needs. Based on their needs and priority, this paper provides a new strategy in using environment-friendly materials and maximizing their satisfaction level when aged housing remodeling is constructed. In addition, this paper provide new criteria in selecting new developed environmental materials in remodeling projects for the purpose of improving the safety and health level in construction industry.
International conference on construction engineering and project management
/
2013.01a
/
pp.36-41
/
2013
With the increased interest in green buildings, the building industry has been experiencing a fast-growing demand for LEED (Leadership in Energy and Environmental Design) certification for the last decade. Still, it is not unusual to see various barriers and issues during its implementation, and experience tells that they can result in harming the overall project performance with reworks, lower productivity, schedule delays, and cost overruns. In order to better understand the industry's observation on issues and their consequences during LEED implementation, we distributed an online survey, and a total of 53 responses were received. The survey results indicate that (1) both designers and non-designers (e.g., contractors) select 'added costs to design and construction' as the biggest barrier; (2) both designers and non-designers select 'decision made too late in the design process' as the most frequently observed issue; and (3) non-designers indicate higher perceived severity in every consequence criteria than designers. The statistical analyses reveal that cost overruns are the most severe impact observed and have a statistically significant relationship with responses in regard to the barrier to LEED implementation.
In the case of public buildings, fast communication and transparency in the administration and the public, as well as ensuring visibility and lighting performance using a glass curtain wall is symbolically expressed through the transparent glass skin. This study is a simulation in order to derive the basic data for the establishment of the improvement of the heating and cooling load analysis according to the window area ratio changes with respect to the high effectiveness of the government's large public building energy consumption analysis and green building certification system of guidelines was analyzed by a change in the energy load. Glass curtain wall is light and visibility, the symbolic meaning of communication, etc., but is widely used in a variety of characteristics, in terms of energy consumption being disadvantaged sheath plan should have been. Design, including the Atrium, is much less energy than energy consumption by the window area ratio. Thus, while compliance with design guide lines, the atrium and I like the burden of a large space ratio and energy load consists of only glass suggest that require more research on that given in the guidelines.
Son, Kiyoung;Kim, Gwang-Hee;Park, Young Jun;Kim, Sun-Kuk
Journal of the Korea Institute of Building Construction
/
v.12
no.6
/
pp.596-606
/
2012
In recent years, LEED-NC (Leadership in Energy and Environmental Design for New Construction) has become one of the most widely adopted environmental certification systems in the United States. However, according to some researchers, the adoption of the LEED-NC is perceived to add to construction cost and duration compared to conventional building standards. Therefore, it is necessary to examine the economic benefits of LEED-NC to consider how it can be applied worldwide. This study focuses on the impact of LEED-NC on the appraised unit value of parcels in San Francisco County based on the number of LEED-NC Public Transportation Access (PTA) qualified buses, light rail and commuter rail stops, distance to the closest bus, light rail and commuter rail stops, zoning class and parcel size. As a population of interest, San Francisco County was chosen since it is known as a region with well-organized transportation systems including bus, light rail and commuter rail systems. According to the correlation results, this study shows that the appraised land value is significantly affected by LEED-NC PTA, and is correlated to a higher appraised unit value of land parcels.
Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.44-45
/
2014
Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.
The Journal of Sustainable Design and Educational Environment Research
/
v.21
no.2
/
pp.25-35
/
2022
With the enactment of the "Framework Act on Carbon Neutrality and Green Growth to Cope with Climate Crisis," various sector-specific plans are being implemented to achieve carbon neutrality. School facilities are mandatory buildings for the "Zero Energy Building Certification" and are the buildings that account for the highest proportion among public institution buildings. Therefore, they play a major role in achieving carbon neutrality in the construction sector. This study analyzed the recent energy use trends and zero energy levels in varied ways to promote the spread of building energy management systems and to provide basic data for efficient operation management and investigated the effectiveness and user opinions of the Building Energy Management System (BEMS) applied to school facilities.
The purpose of this research is to evaluate an accurate biotope area ratio model with efficiency and convenience of database management through promoting sustainable development to provide people amenities in a new town. In particular, the biotope area ratio is used not only in the environment impact assessment but Green building certification criteria. But now there is no any index map of biotope. So it is very hard to implement with data for supplement results. In this research, we suggest the model of integrated attributable information. The evaluation of biotope area ratio is to include a basic land use planning map and a building coverage area which is a wall of greening surface and roof. In case of non building coverage area, the evaluation of biotope area ratio is to include water space, artificial ground, natural ground and pervious gap-pave. A weighted value on the spatial information is combined into the information. And then the merged one is given a land use planning information in a block. In the weighted value on the space type information, it is possible to in its circumstances. Therefore, it can be substituted a correspondence of numerical change for various values elastically in this model.
Han, Hee Su;Kim, Boo-Young;Park, Young Jun;Son, Kiyoung
Journal of the Korea Institute of Building Construction
/
v.14
no.3
/
pp.266-272
/
2014
The Leadership in Energy and Environmental Design (LEED) Green Building Rating System provides third-party verification for environmentally sustainable construction. But while LEED-certified buildings provide healthier work and living environments, Previous studies have shown that LEED certification does not provide any direct economic incentives to owners and developers. To address this issue, this study aims to investigate the economic benefits of LEED criteria. The objective of this study is to examine whether or not there is a significant correlation between median household income and the number of bus stops and light rail stations for a given parcel that meet LEED sustainable site criteria for public transportation access. The findings showed that the number of bus stops had a positive correlation with median household income, which means that more bus stops a given parcel had that met LEED criteria, the greater the median household income of a block group where the given parcel was located would be, though this positive correlation was very weak.
The Journal of Sustainable Design and Educational Environment Research
/
v.14
no.3
/
pp.9-17
/
2015
In this paper, there are several analysis on G-SEED, Building Energy Efficiency Rating System, Energy Performance Index, Energy Saving Plan about how they are applied by classification and planning standard. The analysis result found out that G-SEED has low select percentage by having difficulties to managing and additional cost when the each class is selected. And also, Building Energy Efficiency Rating System in school is planed in comparably simple design and similar size and also mostly uses high efficient machines, which was in high lever comparing to the system in facilities in other uses. In the case of EPI, there are differences on acquiring grades by each region. Especially, Gyung-gi region has a low grade on architecture part comparing to other parts, which seems to acquire more grades by strengthen insulation performance. By the result from the three standards, many facilities has only formal plan to pass the required standard without considering specialities of each buildings, which has a tendency to have a pattern to have a minimum criteria. However, School has a symbolic building which has a obligation to be the base of the aim for growing green energy buildings and green education for students. Therefore, planning with understanding of specialities of the facility, having various and rational evaluation standards from the planning of the building is necessary.
According to Tokyo protocol which suggests the prevention of global environmental pollution, Korean government establishes the standard of architectural materials emission consistency with best effort to decrease the environmental pollution. But many current architectural materials which are used for constructing and remodeling buildings are composed of a variety of chemicals. These include stimuli bad for the residents' health and safety and harmful discharged air polluting substances such as volatile organic compounds(TVOCs) and formaldehyde(HCHO) that in tern include a variety of carcinogen substances. These discharged substances are also researched into inducing 'sick building syndrome' which induces headache, dizziness, vomiting and concentration failure among residents. But the standard of architectural materials according to the Korean apartment provision is limited to emission factors: HCHO and TVOCs. So the aim of this study is to present a standard of functional material's emission consistency about TVOCs including glues and paints, and a certification grade for green building by instituting a materials standard for green building which has consideration for the residents' safety.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.