• 제목/요약/키워드: Test track

Search Result 929, Processing Time 0.048 seconds

Requirements Validation Plan for korean Rubber-Tired AGT System (한국형 고무차륜 경량전철시스템에 대한 요구사항 검증계획)

  • Mok, Jae-Gyun;Lee, An-Ho;Han, Seok-Yun
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.27-31
    • /
    • 2003
  • This study is in a part of requirements validation plan for korean rubber-tired AGT system on test track. The AGT system is consisted subsystems as vehicle, signalling, communication, power distribution and infrastructure for rubber tire running on track. The subsystems will be installed and integrated on test track till next year for test and evaluation. This paper shows overview for test and evaluation in terms of system requirements and its validation classification, test track configuration, measuring system requirements and its configuration. The whole process of system integration and its validation will be controlled by means of KMS including documentation.

  • PDF

A Study on the Evaluation of Track Support Stiffness on the Various Track Type in Urban Transit (도시철도 궤도구조별 궤도지지강성 평가를 위한 실험적 연구)

  • Lee, Dong-Wook;Park, Yong-Gul;Choi, Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.262-270
    • /
    • 2011
  • Track support stiffness which affected track maintenance and riding comfort had a big effect on the track and train. Also, track support stiffness of the track design which was based on theory differs from track support stiffness of the track generated on the field. Track support stiffness was generated by several factors such as dynamic wheel loads, vertical displacement of track, and stress at rail bottom on the field test. With the results of the field test was compared with theoretical value. This paper analyzed that track support stiffness of ballast depended on condition of ballast, and support stiffness of concrete track also depended on the characteristic of track structures such as, normal elastic fastening system, rail floating system and sleeper floating system. However, on the ballast and concrete track, the designed track support stiffness was underestimated less than the measured track support stiffness. When the track condition was estimated on service line, it would not consider the track condition on the field. Therefore, this study proposed the various track type and the range of track support stiffness based on the experimental test.

Evaluation on Structural Stiffness and Grouting Efficiency of Concrete Track using Elastic Wave Tests (탄성파 기법을 이용한 콘크리트궤도의 구조강성 및 충전상태 평가에 관한 연구)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.55-64
    • /
    • 2009
  • Recently, concrete track is replacing ballast track for efficient and economic maintenance of track. It considerably offer less maintenance, a longer service life and reduced life-cycle costs. With the aim of achieving high-quality track construction work, of developing tools for quality assurance in new construction and for later technical inspection of material condition, a quality strategy has to be developed. For these purpose, NDT which is using the seismic wave has carried out in situ studies in the test construction section. The used NDT are SASW test, impact echo test and continuous impact echo test. The test is performed 5,353 times on 49 pre-cast concrete track panels to verify the stiffness structure and grouting efficiency of the track structure. To conclude, because of the non-homogeneous characteristic of concrete material. it is restricted to apply the elastic wave test at some aspect. However it is possible to acquisite a sufficient reliability about structural stiffness and grouting efficiency of concrete track.

A Comparison of Behavior of the Roadbeds of Ballasted & Concrete Track with the Cyclic Loading (자갈궤도와 콘크리트궤도에서의 하중재하에 따른 노반거동 비교)

  • Choi, Chan-Yong;Lee, Sung-Heok;Eum, Ki-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.3
    • /
    • pp.1-8
    • /
    • 2010
  • The track systems installed in Korea railway consist of two types on ballasted track or ballastless track. In this study, it was compared with difference of the behaviors at roadbed with cyclic loading through full scale model test. From the results of model tests, loading distribution ratio of the concrete slab track become more widely distributed than ballasted track, and loading distribution ratio at concrete track was about 30:20:15. The concrete slab track is likely to behavior of the rigid plate, while ballasted track is such as flexible pavement. The vertical stresses of upper roadbed with traffic cyclic loading in concrete track were measured about 30 kPa or less. It was a scene very similar to the results of the field train running test. The vertical stress at concrete track was occurred approximately 4 times smaller than ballasted track. Also, the soil velocities with cyclic loading at the slab track were occurred about 0.3 cm/sec or less, its 8 times smaller than ballasted track.

  • PDF

A Study on the Dynamic Behaviors of Ballast Track using Field Test (현장측정을 통한 자갈도상궤도의 동적 거동 분석)

  • Park Yong-Gul;Choi Jung-Youl
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.401-411
    • /
    • 2006
  • The major objective of this study is to investigate the dynamic behaviors of track due to the deterioration characteristics of ballast for servicing tracks by the field test. The durability of ballast plays an important role in the track behaviour. To estimate the deterioration characteristics of ballast, several tests have been carried out by several scholars. The deterioration characteristics of ballast is one of the most important factor in the dynamic behaviour of track and its life. In this paper abrasion/breakage characteristics of ballast is studied to predict the effect of physical ballast characteristics on ballast track. To reveal deterioration characteristics of ballast, the field test were carried out. The deterioration characteristics, studied in this paper, is applied to the dynamic behaviour of track in various conditions.

A Study on the Dynamic Behaviors of Ballast Track using Field Test (현장측정을 통한 자갈도상 궤도의 동적 거동 분석)

  • Choi, Jung-Youl;Park, Kyun-Seo;Ryu, Joong-Youl;Park, Jeong-Gun;Ryu, Kyoung-Sik;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.494-507
    • /
    • 2006
  • The major objective of this study is to investigate the dynamic behaviors of track due to the deterioration characteristics of ballast for servicing tracks by the field test. The durability of ballast plays an important role in the track behaviour. To estimate the deterioration characteristics of ballast, several tests have been carried out by several scholars. The deterioration characteristics of ballast is one of the most important factor in the dynamic behaviour of track and its life. In this paper abrasion/breakage characteristics of ballast is studied to predict the effect of physical ballast characteristics on ballast track. To reveal deterioration characteristics of ballast, the field test were carried out. The deterioration characteristics, studied in this paper, is applied to the dynamic behaviour of track in various conditions.

  • PDF

Durability Improvement of High Pressure Seal for ISU under the Track Vibration (궤도진동에 대한 ISU 고압 시일 내구성능 개선)

  • Han, In-Sik
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.17 no.2
    • /
    • pp.112-117
    • /
    • 2009
  • The new suspension, called ISU(In-arm suspension system) was developed for Infantry Fighting Vehicle. During vehicle field test, early failure of ISU's sealing system was occurred after driving the paved road. From the failure analysis, ISU's displacement data was obtained. In analysis of PSD data, track induced vibration which has high frequency and small amplitude characteristics, was dominant. Such track vibration would result in early seal failure because of friction increase and lack of lubrication. To simulate track vibration environment in laboratory, seals were tested under the condition of 20Hz, ${\pm}1$, ${\pm}2mm$ amplitude. The same type of seal failure occurred in vehicle test, was reproduced in the lab test under ${\pm}1mm$ amplitude. From the test results, the durability of improved seal was increased by 2.5 times compared with the previous one.

Study on Test methods and Procedures of Hybrid Track Circuit (하이브리드 궤도회로 시험방법 및 절차에 관한 연구)

  • Kwon, Bu-Seok;Jung, Ho-Hung;Lee, Key-Seo;Li, Chang-Long
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.9 no.3
    • /
    • pp.335-342
    • /
    • 2014
  • In this paper We study on test methods and procedures for Hybrid Track Circuit's practicalization. It's possible to apply to HTC's Seoulmetro and high-speed train by proposing test method considering special rail environment and RFID tag and leader, antenna We also present the test methods and procedures for safe and reliable of interface among the Hybrid track circuit devices.

The Behaviour of Track/Railway Bridge according to Pad Stiffness of Fastener System on Concrete Slab Track (콘크리트슬래브궤도 체결장치의 패드강성에 따른 궤도/교량의 거동 분석)

  • Lee, Jun-Ho;Sung, Deok-Yong;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1628-1636
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. But elastic pad becomes superannuated due to repeated train operation. After all, it brings change of pad stiffness and it could directly act on track and bridge as load transmission and impact force. In this study, we carried out laboratory test changing pad stiffness after making a model of 15m bridge and laying concrete slab track. Also, we carried out static and dynamic behaviors test(stress, natural frequency, damping ratio, vibrational acceleration, deflection) of bridge and track and experimentally analyzed them by change of elastic pad stiffness on rail fastener.

  • PDF

Deformation Characteristics of Construction Joint of Paved Track on Earthwork Section using the Accelerated Track Test (궤도가속실험을 통한 포장궤도 토공구간 시공이음매부의 변형특성 연구)

  • Lee, Il-Wha;Jang, Seung-Yup;Kang, Yoon-Suk;Um, Ju-Hwan;Kim, Eun
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.5
    • /
    • pp.521-527
    • /
    • 2010
  • The Paved Track is applied to reduce maintenance cost of conventional line. The Paved Track could be used in all types of lines including earthwork, bridge, tunnel and turnout sections. In case of earthwork section, the construction joint is the most critical factor to track durability. The construction joint does not affect to the track structure directly, but the gap due to discontinuity of slabs may affect to the long-term serviceability. To evaluate this problem, the accelerated track test has been performed on the construction joint and the middle part to of the real scale Paved Track. The purpose of this test is that evaluate the vulnerability of construction joint section comparing the trends of settlement and earth pressure under repeated loads of construction joint with those of the middle slab part.