1 |
O.S. Kweon, J.Y. Choi, M.S. Kang, H.U. Lee, Y.g. Park (2007) An Estimate of Ballast Track Condition on Dynamic Behavior of Railway Bridge, Journal of the Korean Society for Railway, 2007 Autumn Conference of Korean Society for railway, pp. 476-489.
|
2 |
S.H. Na, S.B. Suh, K.J. Son, J.H. Kim (2007) Experimental study on the variation of track stiffness between earthwork and bridge, Journal of the Korean Society for Railway, 2007 Autumn Conference of Korean Society for railway, pp. 281- 288.
|
3 |
KS. Lee, J.N. Cheon, S.C. Kim, S.S. Kweon (2007) Rail pressure on the changing point of track modulus, Journal of the Korean Society for Railway, 2007 Autumn Conference of Korean Society for railway, pp. 228-233.
|
4 |
J.Y. Choi, K.D. Kang, Y.G. Park (2006) Evaluation of Track Impact Factor on Ballast Track in Subway using field Test, Journal of the Korean Society for Railway, 9(6), pp. 784-791.
|
5 |
S.J. Lee, J.T. Oh, O.J. Park (2003) Parametric study about Measuring Train Loads
|
6 |
Sato, New railway Track engineering Mechanics.
|
7 |
RTRI (1997) Design Standard and manual for Railway Structure, Track Structure (Ballasted Track), Japan
|
8 |
Graduate School of Railway (2009) A Study on the Maintenance and Estimate of Fatigue Life for Used Rail, Seoul Metro.
|
9 |
Track Design Technical Report (2006) Structural Technical Report(Track division), Seoul city Metro Line 9.
|
10 |
Track Design Technical Report (2005) Structural Technical Report(Track division), Shinbundang Line.
|
11 |
Arnold D. Kerr (2003) Fundamental of Track Dynamics.
|