• Title/Summary/Keyword: Test construction

Search Result 7,741, Processing Time 0.039 seconds

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

A Study on the Actual Condition of Scaffolding Construction in Accordance with the Revision of Safety Standards (비계공사 안전기준 개정에 따른 현장적용 실태에 관한 연구)

  • Kim, Ja Yeon;Cho, Youn Hee
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.15-22
    • /
    • 2020
  • Scaffolding works are demolished after this structure is completed, and safety accidents often occur because they are installed differently from legal standards or frequently change during work. Therefore, in order to strengthen the safety of scaffolding, the Ministry of Land, Infrastructure and Transport required a need for design standards for temporary facilities that can systematically prevent and solve large-scale safety accidents that are repeatedly increasing during temporary construction. It has been enacted, and some contents have been revised for the past three years. However, construction site personnel do not know or know the revised matters, but often install scaffolding by the installer's experience rather than complying with relevant laws and regulations. It is the situation that the ground strength test of the foundation ground for the load applied to the floor of the column is omitted in most sites. Therefore, this study grasped the actual situation on the degree of recognition of the revised laws and regulations of the construction site and the foundation-based treatment of the floor working load of the scaffolding column, and derived problems. In addition, we intend to provide reference materials for the endurance test according to the ground conditions to small-scale small sites where it is difficult to conduct the test by carrying out the endurance test of the scaffolding ground according to the revised standards.

The Loading Mock-up test for Construction Management of Cable net Facade (케이블넷 파사드의 시공관리를 위한 하중재하 Mock-up실험)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.28-29
    • /
    • 2014
  • Cable net system openness and flexibility is good high and the large deflection caused no damage to the structure itself. However, cable installation, install complex systems and technologies are needed. In this study, for the basic materials of cable net construction management, cable net expert's advice and mock-up test results are summarized.

  • PDF

Comparative study of the carbon emissions in the construction phase for different building usages: a case study of apartments and schools (시공단계 탄소배출량의 건축물 용도별 차이 검정: 아파트와 학교를 중심으로)

  • Kang, Seo-Kyoung;Kang, Goune;Yoo, Wi Sung;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.221-222
    • /
    • 2015
  • Since the input data such as types and quantities of materials cannot be acquired during the planning and designing phases, it is difficult to estimate the carbon emissions from the construction phase. As the materials are closely related to the building usages, an approximate estimation by the usages can be suggested. However, before confirming the estimation, the difference test among the carbon emissions of the building usages should be implemented. This study executed t-test or Mann-Whitney test between apartments and schools. The result of the study statistically verified the significant difference between the carbon emissions of apartments and schools.

  • PDF

Evaluation of Fire Performance for High Strength Concrete Mock-up Column with Fiber by Unloaded Fire Test (비재하 내화시험에 의한 섬유혼입 고강도 콘크리트 Mock-up 기둥의 내화성능 평가)

  • Song, Young-Chan;Kim, Yong-Ro;Kim, Ook-Jong;Lee, Do-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.97-100
    • /
    • 2009
  • Fire resistance properties and mechanical properties of high strength concrete mock-up column using organic fiber by KS F 2257 Methods of fire resistance test for elements of building construction and compression test was investigated for application of precast concrete column method of high rise building in this study. As a test result, it was appeared that ECC permanent form is available as fire resistance method of high strength concrete and new precast concrete construction method for facilitating construction of high rise building.

  • PDF

Service Life Assessment of Construction Sealants with Accelerated Degradation Test (가속열화시험에 의한 건축용 실란트의 사용수명 평가)

  • Kwon, Young-Il;Kim, Seung-Jin;Lee, Hyoung-Wook
    • Journal of Applied Reliability
    • /
    • v.7 no.4
    • /
    • pp.149-162
    • /
    • 2007
  • Field and accelerated tests are performed to assess the service life of construction sealants. Mathematical degradation models for tensile strength and elongation, that are the two major performance characteristics of sealants, are derived from the test results. Accelerated degradation test methods for assessing service life of construction sealants are developed based on the degrading performance and a numerical example is provided.

  • PDF

Pattern Design and Structural Test for the Involute Construction (인볼루트 구조물의 적층패턴설계 및 구조시험)

  • 이형식;원용구;이승구;주창환
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 1999.11a
    • /
    • pp.57-62
    • /
    • 1999
  • In order to fabricate a involute construction structure, the pattern design for prepreg stacking was developed. For obtaining the demanded strength in the circumferencial and axial direction of the involute construction and tile proper processablity of prepreg stacking, the shaped pattern method was established which has a calculated length suitable for stacking. We can obtain the involute construction with clean interface between laminated plies and suitable dimension by using pattern design method developed in this study. Test specimens with varied arc angle were designed to test the structural properties of involute construction. Tensile and compressive strength decreased with the increase of arc angle. Tensile modulus and compressive failure strain were calculated under the conditon of transformation of material properties successfully.

  • PDF

A Test Compacted Construction for Subgrade in the 3rd Runway of the 2th Incheon International Airport Construction Area using Crushed Stone (인천국제공항2단계 제3활주로 부지에서 파쇄암을 이용한 노상 시험다짐 시공)

  • Kim, Jong-Kuk;Son, Hyung-Ho;Kim, Young-Ung;Kim, Yong-Cheol;Kim, Dong-Chul;Kim, Yeon-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.507-514
    • /
    • 2005
  • In this construction case study, Crushed stone under 100mm diameter was carried out a test compacted construction for subgrade in the 3rd. runway of the 2th Incheon International Airport Construction area. Conforming to specification needs a minimum rolling compacted number 10 for upper subgrade 100% compaction degree indicated in Federal Aviation Administration and $K_{30}{\geq}20kgf/cm^3$ in plate bearing test. $K_{30}$ to be acquired 100% compaction degree of upper subgrade is confirmed to about $31kgf/cm^3$ from correlation $K_{30}$ vs relative compaction degree.

  • PDF

Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method (탑다운 기초 현장타설말뚝의 지지력 평가)

  • Cho, Chun-Whan;Kim, Hong-Mook;Kim, Woong-Kyu;Kwon, Se-Oh;Sung, Byung-Wan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF