• Title/Summary/Keyword: Test Site

Search Result 3,367, Processing Time 0.03 seconds

Test Process Site Construction of X-Forms Base UI Software (X-Forms 기반 UI 소프트웨어의 테스트 프로세스 사이트 구축)

  • Lee, Seung-Hyuk;Han, Jung-Soo
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.591-594
    • /
    • 2007
  • We construct the test process site about X-Internet and X-Forms base software. This software is developed with X-Forms base web UI tool. Basically, this software is operated on the Client. Even in operating process, this kind of software could be updated because of user's request, improvement in efficiency, reformation and addition in functions and so on. In order to test a updated software, V-Model will be extended and transformed test process will be proposed. This proposed test process is starting with test plan which defines test object and activities for attainment of process's goal. The following steps are recognizing testcase and data, analysis and design for constructing process environment, setting forth testcase in detail, realization of test methodology, and the arrangement of results. This paper will be helpful to build more efficient process site by managing and recording the test process.

  • PDF

Borehole Heater Test at KAERI Underground Research Tunnel (지하처분연구시설(KURT)에서의 시추공 히터 시험)

  • Kwon, S.;Lee, C.;Yoon, C.H.;Jeon, S.W.;Cho, W.J.
    • Tunnel and Underground Space
    • /
    • v.21 no.3
    • /
    • pp.225-234
    • /
    • 2011
  • In this study, an in situ heater test for investigating the thermo-mechanical behavior related to heat flow was carried out. It was the first in situ heater test in Korea. For the test, an adequate design of heater, observation sensors, and data logging system was developed and installed with a consideration of the site condition and the test purposes. It was possible to observe that steep joints are overwhelmingly developed in the test area from a joint survey. The major rock and rock mass properties at the test site could be determined from the thermal and mechanical laboratory tests using the rock cores from the site. From the measured rock temperature distribution, it was possible to observe the influence of the rock joints and the heat flow through tunnel wall. When the heater temperature was maintained as $90^{\circ}C$, the rock temperature at 0.3 m from the heater hole was increased up to $40^{\circ}C$.

A Case Study on the Effect of Soil Improvement on Anchor Bond Zone (지반개량에 의한 Anchor 정착부 개선효과 사례연구)

  • Kim, Tae-Seob;Song, Sang-Ho;Cho, Kyu-Wan;Lee, Jae-Dong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1008-1013
    • /
    • 2006
  • Ground anchor method is widely used in the large scale deep excavation of urban area to support a retained wall. Excavation using the ground anchor as a supporting system near a building have many difficulties due to the limitation of construction space. This method can not be applied to the site with the insufficient space from the retained wall to the boundary line. In this case, soil improvement at the anchor bond zone can be used to secure the frictional resistance of ground anchor within the boundary. Through this method, the bond length of anchor can be shortened considerably. This paper deals with the case study on the ground excavation adjacent to a building. The object field is Yongsan Park Tower Construction Site. In this site, the enlarged anchor with soil improvement was applied to solve the problem due to the limitation of construction space. According to the results of field test and monitoring, the anchor with soil improvement is very effective to secure the frictional resistance at the anchor bond zone.

  • PDF

Analysis of Wind Resource on Maldo Island of Kokunsangun-do, Saemangeum (새만금 고군산군도 말도 유역에 대한 바람에너지 분석)

  • Kang, Sangkyun;You, Sungho;Lee, Jang-ho;Pak, Sungsine;Kim, Hyeong-Joo
    • Journal of Wind Energy
    • /
    • v.9 no.4
    • /
    • pp.65-71
    • /
    • 2018
  • To establish an offshore wind turbine test site, a wind resource assessment of the candidate site is required as a preliminary procedure. The wind resource assessment must be performed with at least one year of wind data. If the assessment is performed with short-term wind data, the results cannot validate the wind conditions of the candidate site. This study performs wind resource assessment of Kokunsangun-do to investigate the wind conditions of the candidate site. The wind data is measured by the Automatic Weather System (AWS) of the Korea Meteorological Administration, located at Maldo. The data is for five years, measured from 2013 to 2017. Measured wind data is statistically processed with a 10-minute average scheme to find out the dominant wind direction and wind power density, with yearly wind speed distribution (Weibull-based). This study contributes to build a database of wind energy resources around Maldo. Also, the results of this study could be used for the establishment of an offshore wind turbine test site.

Site Mitigation Plan for Noise Sources from Construction Sites by Developing Movable Noise Barriers (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.25 no.1
    • /
    • pp.58-64
    • /
    • 2015
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is that the almost noise from construction site is high level and some kinds of noise levels are over 100 dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans were developed to reduce different types of construction noises such as breaker work, gang form and asphalt saw. They were applied in site and evaluated noise reduction performance. The test result of site insertion loss was between 4~8 dB depends on the equipment and type of work.

Site Calibration for the Wind Turbine Performance Evaluation

  • Nam, Yoon-Su;Yoo, Neung-Soo;Lee, Jung-Wan
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.12
    • /
    • pp.2250-2257
    • /
    • 2004
  • The accurate wind speed information at the hub height of a wind turbine is very essential to the exact estimation of the wind turbine power performance testing. Several methods on the site calibration, which is a technique to estimate the wind speed at the wind turbine's hub height based on the measured wind data using a reference meteorological mast, are introduced. A site calibration result and the wind resource assessment for the TaeKwanRyung test site are presented using three-month wind data from a reference meteorological mast and the other mast temporarily installed at the site of wind turbine. Besides, an analysis on the uncertainty allocation for the wind speed correction using site calibration is performed.

Determination of Shear Strength Modification Factors in Drilled Shaft (현장타설말뚝의 전단강도 조정계수 결정법)

  • Kim, Myung-Hak;Michael W. O'Neill
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.193-200
    • /
    • 1999
  • An experimental study is described in which a 305-mm-diameter instrumented drilled shaft was installed in a moderately expansive clay soil during the dry season and monitored over a period of about 18 months. The purpose of the study was In investigate the effects of seasonal moisture changes in the soil on the shear stresses imposed on the sides of the drilled shaft and movements of the shaft head. The soil in the vicinity of the test shaft was instrumented to measure suction and ground surface movement and the relation between suction, total stress and shear strength of the soil at the test site was determined through laboratory triaxial compression testing. Daily rainfall and temperatures were also monitored at the test site, the National Geotechnical Experimentation Site at the University of Houston, where control on surface grading and vegetation existed. Over the course of the study induced unit side shear values of up to 54 kPa were measured in the test shaft. A simple computational model was developed that related observed suction changes to unit side shear induced by the expansion of the soil through the use of the laboratory suction-total stress-shear strength relation.

  • PDF

Appropriate Input Earthquake Motion for the Verification of Seismic Response Analysis by Geotechnical Dynamic Centrifuge Test (동적원심모형 시험을 이용한 부지응답해석 검증시 입력 지진의 결정)

  • Lee, Jin-Sun
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.17 no.5
    • /
    • pp.209-217
    • /
    • 2013
  • In order to verify the reliability of numerical site response analysis program, both soil free-field and base rock input motions should be provided. Beside the field earthquake motion records, the most effective testing method for obtaining the above motions is the dynamic geotechnical centrifuge test. However, need is to verify if the motion recorded at the base of the soil model container in the centrifuge facility is the true base rock input motion or not. In this paper, the appropriate input motion measurement method for the verification of seismic response analysis is examined by dynamic geotechnical centrifuge test and using three-dimensional finite difference analysis results. From the results, it appears that the ESB (equivalent shear beam) model container distorts downward the propagating wave with larger magnitude of centrifugal acceleration and base rock input motion. Thus, the distortion makes the measurement of the base rock outcrop motion difficult which is essential for extracting the base rock incident motion. However, the base rock outcrop motion generated by using deconvolution method is free from the distortion effect of centrifugal acceleration.

Novel approach to predicting the release probability when applying the MARSSIM statistical test to a survey unit with a specific residual radioactivity distribution based on Monte Carlo simulation

  • Chun, Ga Hyun;Cheong, Jae Hak
    • Nuclear Engineering and Technology
    • /
    • v.54 no.5
    • /
    • pp.1606-1615
    • /
    • 2022
  • For investigating whether the MARSSIM nonparametric test has sufficient statistical power when a site has a specific contamination distribution before conducting a final status survey (FSS), a novel approach was proposed to predict the release probability of the site. Five distributions were assumed: lognormal distribution, normal distribution, maximum extreme value distribution, minimum extreme value distribution, and uniform distribution. Hypothetical radioactivity populations were generated for each distribution, and Sign tests were performed to predict the release probabilities after extracting samples using Monte Carlo simulations. The designed Type I error (0.01, 0.05, and 0.1) was always satisfied for all distributions, while the designed Type II error (0.01, 0.05, and 0.1) was not always met for the uniform, maximum extreme value, and lognormal distributions. Through detailed analyses for lognormal and normal distributions which are often found for contaminants in actual environmental or soil samples, it was found that a greater statistical power was obtained from survey units with normal distribution than with lognormal distribution. This study is expected to contribute to achieving the designed decision error when the contamination distribution of a survey unit is identified, by predicting whether the survey unit passes the statistical test before undertaking the FSS according to MARSSIM.

A Study on Site Application Techniques for Insulation Reliability of Rotating Machine (고압회전기 절연열화진단의 현장적용기술연구)

  • Kim, K.Y.;Jo, K.H.;Kim, T.S.;Han, S.O.;Lee, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 1991.07a
    • /
    • pp.286-291
    • /
    • 1991
  • Most of the failures of rotating machine are stator coil insulation failures. The insulation diagnostic testing for high voltage motors and generators are only megger test and P. I Test which is applied DC voltage until now. But it was impossible to judge insulation deterioration status of high voltage rotating machinery by above testing. In other words, even though the megger measurement values are fairly high, they used to be failed from time to time. Therefore in order to excute reliable and detailed diagnosis of insulation deterioration for rotating machinery, the tangent delta test, the alternating current test and the partial discharge test shall be applied to the insulation diagnostic testing on site.

  • PDF