• Title/Summary/Keyword: Test Installation

Search Result 1,493, Processing Time 0.029 seconds

Study on Visual Recognition Enhancement of Yellow Carpet Placed at Near Pedestrian Crossing Areas : Visual Attention Software Implementation (횡단보도 옐로카펫 설치에 따른 시인성 증진효과 연구 : Visual Attention Software 분석 중심으로)

  • Ahn, Hyo-Sub;Kim, Jin-Tae
    • Journal of Information Technology Services
    • /
    • v.15 no.4
    • /
    • pp.73-83
    • /
    • 2016
  • Pedestrian safety was recently highlighted with a yellow carpet, a yellow-colored pavement material prepared for children waiting for signals for pedestrian crossing, without validation of its efficiency in practice. It was a promising device likely to assist highway safety by stimulating pedestrian to step on the yellow-colored area; it was generally called nudge effects. This paper delivers a study conducted to check the effectiveness of yellow carpet in three different aspects in vehicle driver's perspective by applying the newly introduced information technology (IT) service: Visual Attention Software (VAS). It was assumed that VAS developed by 3M in the United States should be able explain the Korean drivers' visual reaction behaviors since technology embedded in VAS was developed based on and proved by other various international countries and continents in the world. A set of pictures was taken at thirteen different field sites in seven school zone areas in the Seoul metropolitan area before and after the installation of a yellow carpet, respectively. Sets of those pictures were analyzed with VAS, and the results were compared based on the selective safety measures: the likely focusing on standing pedestrians (waiting for a pedestrian's green signal time) affected by its background (yellow-colored pavement) contrasting him or her. The test results from a set of before-and-after comparison analyses showed that the placement of yellow carpet would (1) increase 71% of driver's visual attention on pedestrian crossing areas and (2) change the sequential order of visual attention on that area 2.4 steps ahead. The findings would enhance deployment of such promising efficiency and thus increase children safety in pedestrian crossing. The result was promising to highlight the way to support the changes in conservative traffic safety engineering field by applying the advanced IT services, while much robust research was recommended to overcome the limitation of simplification of this study.

An Accurate Moving Distance Measurement Using the Rear-View Images in Parking Assistant Systems (후방영상 기반 주차 보조 시스템에서 정밀 이동거리 추출 기법)

  • Kim, Ho-Young;Lee, Seong-Won
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37C no.12
    • /
    • pp.1271-1280
    • /
    • 2012
  • In the recent parking assistant systems, finding out the distance to the object behind a car is often performed by the range sensors such as ultrasonic sensors, radars. However, the installation of additional sensors on the used vehicle could be difficult and require extra cost. On the other hand, the motion stereo technique that extracts distance information using only an image sensor was also proposed. However, In the stereo rectification step, the motion stereo requires good features and exacts matching result. In this paper, we propose a fast algorithm that extracts the accurate distance information for the parallel parking situation using the consecutive images that is acquired by a rear-view camera. The proposed algorithm uses the quadrangle transform of the image, the horizontal line integral projection, and the blocking-based correlation measurement. In the experiment with the magna parallel test sequence, the result shows that the line-accurate distance measurement with the image sequence from the rear-view camera is possible.

Optimal Remediation of TCE-contaminated Groundwater using Direct Current and Fe$^0$ (직류전원과 0가 철을 이용한 지하수내 TCE정화효율의 최적화 연구)

  • Moon, Ji-Won;Moon, Hi-Soo;Roh, Yul;Kim, Heon-Ki;Song, Yun-Goo
    • Economic and Environmental Geology
    • /
    • v.35 no.3
    • /
    • pp.229-239
    • /
    • 2002
  • The objective of this study was to design an optimal electro-remediation system for TCE contaminated water using zero talent iron (ZVI) and direct current (DC). A series of column experiments were conducted to evaluate the effects of electrode arrangement and the location of permeable iron barrier in the column on the TCE removal efficiency and iron corrosion process. In twelve different combinations of ZVI and/or DC application in the test columns, the rate of reductive degradation of TCE was improved with simultaneous application of both ZVI and DC compared to that used ZVI only. The moot effective arrangement of electrode and ZVI for TCE removal from water was a column set with ZVI and cathode installed at the down gradient, respectively.

Development of a Cutting Support Cleaning System considering the Dross Adhesion Characteristics (드로스 부착 특성을 고려한 절단 정반 크리닝 시스템 개발)

  • Kim, Ho-Kyeong;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.10
    • /
    • pp.5919-5924
    • /
    • 2014
  • Accumulated dross adhered to the cutting support degrades the cutting accuracy and aggravates the working environment by reducing the efficiency of the dust collector. Furthermore, the cutting machine and product can be damaged by the scattering of molten metal. In this study, an attempt was made to increase the productivity of steel cutting process and improve the working environment by dross control. The dross adhesion characteristics were invested by a cutting experiment and the design concept for a dross removal machine was devised. Finally, a cutting support cleaning system and its operating algorithm were developed. The applicability of the developed system was examined and verified by a long-term field test after installation of the plasma arc cutting system of a shipyard.

Moment Resisting Behaviors of Railway Electric Pole Foundation According to Form Work Methods (거푸집 설치 방법에 따른 철도 전철주기초의 모멘트 저항 거동)

  • Lee, Su-Hyung;Lee, Seung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.411-417
    • /
    • 2013
  • The moment responses of electric pole foundations for a railroad were investigated using real-scale load tests. Large overturning moments were applied to two square rigid piles with a 1.1 m width and a 2.2 m embedded depth. Two different installation methods-with and without a form-were applied to evaluate the influence of the form work on the moment capacities of the foundations. The reduction of ground strength caused by the excavation without a form is more pronounce than the decrease of frictional strength due to the smooth concrete surface with a form. From the test results, it is found that the current design method which applies a proportional coefficient to consider the effect of a form work is not appropriate. When the normal and frictional stressed is considered separately, the effect of a form work can be estimated reasonably by reducing the friction angle between soil and foundation by 20%.

Performance Evaluation of VPN Protocols Using Various Traffic (다양한 트래픽을 이용한 VPN 프로토콜 성능 평가)

  • O, Seung-Hui;Chae, Gi-Jun;Nam, Taek-Yong;Son, Seung-Won
    • The KIPS Transactions:PartC
    • /
    • v.8C no.6
    • /
    • pp.721-730
    • /
    • 2001
  • Nowadays corporation networks are growing rapidly and they are needed to communicate with branch offices. Therefore, a VPN (Virtual Private Network) appears to reduce the cost of access and facilitate to manage and operate the enterprise network. Along with this trend, many studies have been done on VPN. It is important that the performance issues should be considered when VPN protocols are applied. However, most of them are limited on the tunneling methods and implementation of VPN and a few studies are performed on how installation of VPN affects the network. Therefore, in this paper, a testbed is constructed and VPN protocols are installed on it. Real traffic is generated and transmitted on the testbed to test how installing a VPN affects the network. As a result, layer 3 VPN protocol shows lower network performance than layer 2 VPN protocols. And we realize that the combination of L2TP and IPSec is the better method to install VPN than using IPSec only in the aspects of performance and security.

  • PDF

Earthquake Response Control of a Building with a Tuned Liquid Damper Using Hybrid Experiment Method (하이브리드 실험법을 이용한 TLD가 설치된 건물의 지진응답 제어)

  • Lee, Sung-Kyung;Lee, Sang-Hyun;Min, Kyung-Won;Park, Eun-Churn;Woo, Sung-Sik;Chung, Lan;Youn, Kyung-Jo
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2006.03a
    • /
    • pp.527-534
    • /
    • 2006
  • A real-time hybrid method, in which the experimental implementation and the numerical computation of a structure are simultaneously carried out in real-time and combined on-line, has been used as a dynamic testing technique of structure to investigate its dynamic behaviors. In this paper, an experimental hybrid method, which implements the earthquake response control of a building structure with a TLD by using only a TLD as an experimental part, is proposed and is experimentally verified through a shaking table test. In the proposed methodology, the whole building structure with a TLD is divided into the upper TLD and the lower structural parts as experimental and numerical substructures, respectively. At the moment, the control force acting between their interface is measured from the experimental TLD with shear-type load-cell which is mounted on shaking table. Shaking table vibrates the upper experimental TLD with the response calculated from the numerical substructure, which is subjected to the excitations of the measured interface control force at its top story and an earthquake input at its base. The experimental results show that the conventional method, in which both a TLD and a building model are physically manufactured and are tested, can be replaced by the proposed methodology with a simple experimental installation and a good accuracy for evaluating the control performance of a TLD.

  • PDF

An analysis of the deformation of PV module under different mechanical loads (기계 하중에 따른 PV모듈 변형 분석)

  • Choi, Ju-Ho;Jung, Tea-Hee;Song, Hee-Eun;Kim, Il-Soo;Chang, Hyo-Sik;Kang, Gi-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.3
    • /
    • pp.58-66
    • /
    • 2013
  • Recently, PV module that the most important part of the photovoltaic system is more widened to lower manufacturing costs for module. However, the broad PV module results to the serious mechanical damage corning from installation circumstances such as snow, wind etc of snow and finally lead to the dramatic degradation of the electrical behavior of PV module. In this paper, 3 kinds of PV modules that consist of the different thickness and area of front glass and the diverse cross sectional structures of the frame are prepared for this experiment. The drooped length and electrical outputs of the PV modules are measured by means of applying 600Pa mechanical load to the PV modules from 1200Pa to 5400Pa base on the mechanical load test procedure of K SC IEG 61215 standard. The simulation data are obtained by the simulation tool as ANSYS and those are validate by comparing with the those experimental results figure out relations between the deformation and the constituent part of PV module.

Settlement of Embankment and Foundation for Concrete Track of Gyungbu High Speed Railroad (II) (경부고속철도 콘크리트궤도 토공 및 원지반 침하 (II))

  • Kim, Dae-Sang;Park, Seong-Yong;Shin, Min-Ho;Lee, Hyeon-Jung;Kim, Hyun-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.457-462
    • /
    • 2007
  • An application of concrete track is being activity processed for the construction of Korean railroad. The concrete track has an advantage to decrease the maintenance fee, but is very difficult to control the settlement of ground and embankment consisting of substructure of concrete track below the allowable settlement level. This is the reason why the measurement and evaluation of both ground and embankment settlement before the installation of the concrete track is very important. One ground, a lower subgrade, and five surface settlements are measured to understand the settlement behavior of ground and embankment settlement. The period to measure settlements was more than 1 year after the completion of embankment. In this test site, ground settlement was over during the construction of embankment, but the embankment settlement are being continuously proceeded after the completion of embankment. The settlement velocity gradually is slowing down as time goes by. This paper also analysed the reasons of abrupt settlement increase and concluded that the rainfall was one of the important reason to increase settlement rate.

A Study on Seismic Retrofit Design of the Stabilized Piles by 1g Shaking Table Tests and Pseudo-static Analysis (1g 진동대 실험 및 등가정적해석을 이용한 억지말뚝의 사면안정 내진보강 효과 연구)

  • Han, Jin-Tae;Cho, Jong-Suck;Yoo, Min-Taek;Lee, Seung-Hyun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.2
    • /
    • pp.93-101
    • /
    • 2011
  • Korea has about 70% of its land classified as the mountain area, which has led to cut-slope being the result of substantial road and railway construction. However, there is currently a lack of research about the seismic retrofit design of a slope, even though many earthquakes have recently occurred at home and abroad. In this study, in order to investigate the stabilizing effect of piles against sliding during an earthquake, a series of 1 g shaking table tests and pseudo-static analyses were carried out. As a result, the stabilizing effect of piles against sliding during an earthquake was verified by the 1 g shaking table tests and the most effective result from the pseudo-static analyses was that the installation of the piles on the central part of the slope, where the failure surface included piles unlike the lower part and upper part of the slope. Furthermore, when the pile was installed on the central part of the slope, the change of the safety factor depending on the distance between the center of two piles was evaluated.