Stress Analysis Acting on Electric Pole using Strain Gauge from Full Scale Pull-Out Test (실물인장실험시 변형률계를 이용한 전주에 작용하는 응력분석)

  • Ahn, Tae-Bong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.9
    • /
    • pp.49-55
    • /
    • 2010
  • Many electric poles in the softground have been collapsed due to external load. In this study, 10 types of tests were performed with variation of location, numbers and depths of anchor blocks as well as depth of poles to find stresses acting on concrete electric poles. The stresses of concrete poles are relaxed at 600~700[kg] of tensile load, and stresses are concentrated at top of pole, and spread to lower part of pole. In the concrete pole collapse test, tensile load at failure was approximately 1,400[kg], which is twice of design load. As passive zone in the soil increases, the stresses acting on concrete pole are concentrated at lower part of pole based on moment arm earth pressure distribution.

The transient grounding impedance measurment of large grid grounding electrodes (대규모 그리드 접지전극의 과도접지임피던스의 측정)

  • Jeon, Byung-Wook;Lee, Su-Bong;Li, Feng;Lee, Seung-Ju;Jung, Dong-Cheol;Lee, Bok-Hee
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.69-72
    • /
    • 2008
  • This paper presents the transient and conventional grounding impedance behaviors of large grid grounding system associated with the injection point of impulse current The measurement methods consider two possible errors in the grounding-system impedances: (1) ground mutual resistance due to current flow through ground from the ground electrode to be measured to the current auxiliary, (2) ac mutual coupling between the current test lead and the potential test lead The test circuit was set to reduce the error factors. The transient grounding impedance depends on the rise time and injection point of impulse current It is effective that grounding conductor is connected to the center of the large grid grounding system.

  • PDF

The Development and Experimental Evaluation of 100kVA Unified Power Quality Conditioner interconnected to the Li-Battery System (리튬 배터리를 연계한 100kVA UPQC 개발 및 성능시험)

  • Lee, Hak-Ju;Chae, Woo-Kyu;Park, Jung-Sung;Sohn, Jin-Man;Choi, Eun-Sik
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.102-110
    • /
    • 2012
  • This paper propose the advanced topology of UPQC, its DC link is connected with Lithium battery, to compensate the momentary interruptions. The proposed system can be operated as UPS mode using the parallel inverter, which control the charge or discharge of battery, in case of the interruption. We dvelop 100kVA UPQC using the proposed topology to rise the power quality and the reliability of Microgrid. We verify its usefulness through voltage compensation test, UPS operation test and etc. using Microgrid test facility.

A Study on the Economic Analysis of LED Lightings in All-Electric Houses Using California Standard Practice Test (캘리포니아 테스트를 이용한 전기에너지주택 LED조명의 경제성 분석에 관한 연구)

  • Hwang, Sung-Wook;Lee, Hyun-Ju;Nah, Hwan-Seon;Kim, Jung-Hoon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.8
    • /
    • pp.1-7
    • /
    • 2011
  • Recently, all-electric house technology became one of the green growth technologies and is integrated with various areas such as electricity, machinery, architecture, material, and etc. Fossil fuel energy is used for heating and hot water supply in the conventional houses but electricity is adopted in the new conceptual houses to maximize advantages of electricity such as amenity, safety, cleanness, and so on. In this paper, an economic analysis is carried out when LED lightings are adopted using the California Standard Practice Test which has been used to estimate the effects of existing DSM (Demand Side Management) programs. The results are able to contribute to the diffusion of all-electric houses and the establishment of basic data and planning for DSM policies.

Construction of the infrastructure for evaluating characteristic against contamination for power installation (전력기기 내오손특성 평가기반 구축)

  • Lee, J.G.;Kim, M.K.;Moon, I.W.;Jeong, J.Y.;Kim, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1513-1514
    • /
    • 2006
  • In this paper, there have been brief review about the important consideration in laboratory planning and construction of the artificial pollution testing facilities including 300 kV, 1800 kVA AC test system, which enable to lest and evaluate the UHV dielectric performance of power insulators up to transmission class. Also it is described simply about its trial running of the whole test system. To evaluate the performance characteristics against contamination for various power installation, especially for the insulators and kinds of bushings, brief investigation and an analysis of test objects and related international codes and standards have been conducted.

  • PDF

Evaluation of Insulation Performance for Stator Winding of the Inverter Driven Induction Motor According to Impregnation Methods (함침기법에 따른 인버터 구동 유도전동기 고정자 권선의 절연성능 평가)

  • Hwang, Don-Ha;Kang, Dong-Sik;Lee, In-Woo;Kim, Dong-Hee;Lee, Kwang-Sik
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.487-492
    • /
    • 2006
  • Inverter driven induction motors with high speed switching and advanced PWM techniques are widely used for variable speed applications. Recently, the insulation failures of stator winding have attracted much concern due to high dv/dt of IGBT PWM inverter output. In this paper, the detailed insulation test results of 26 low-voltage induction motors are presented. Six different types of insulation techniques are applied to 26 motors. The insulation characteristics are analyzed with partial discharge, inception voltage, AC current, and dissipation factor tests. Also, breakdown tests by high voltage pulses are performed. From the above test data the effects due to different wires and insulation techniques on the insulation characteristics of low-voltage induction motors are compared and analyzed. The insulation technique to enhance the insulation strength is suggested from the test results.

  • PDF

the GOOSE Communication Test of IEC 61850 based IED (IEC 61850기반 IED GOOSE 통신시험)

  • Lee, N.H.;Lee, M.S.;Jang, B.T.;Han, J.Y.;Song, I.J.;An, Y.H.
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.263-266
    • /
    • 2009
  • IEC 61850 based substation automation system is operating with Generic Object Oriented Substation Event message when an IED need to send an important signal to other IEDs or receive the signals from another IED such as trip and interlock. So interoperability of substation automation system may be assured throughout the verification of IED GOOSE. This paper shows a testing contents for GOOSE subscription and publish of IEC 61850 based IED and describes how to analysis the result of GOOSE testing. Now domestic IED completed by GOOSE test of this study are working in KEPCO test field.

  • PDF

A Study of Contact Resistance Test Considered with Measurement Uncertainty for Electric Bus Couplers with Battery-Swapping System (측정불확도를 고려한 배터리 교환형 전기버스용 접속기 접촉저항 평가에 관한 연구)

  • Kim, Kwang-Min;Lee, Ju
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.60-64
    • /
    • 2015
  • Many people think that Electric Vehicles(EVs) is the best method to resolve the problems of running out of fossil fuels. But EVs take long time for charging. So, EVs with battery swapping systems(EVBS) are developed to resolve this problem. Nonetheless, EVBS is not spreaded widely because the method of durability test in couplers is not defined. In this study, the evaluation method of durability test in couplers is defined by some standards and the measurement uncertainty is used to increase the reliability of EV couplers.

The Intrinsic Safety Evaluation of Solar Photovoltaic Cell (태양전지셀의 본질안전 방폭성능 평가)

  • Lee, Chun-Ha;Jee, Seung-Wook;Kim, Si-Kuk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.7
    • /
    • pp.49-54
    • /
    • 2011
  • Now the world will regulate the CO2 emission due to environmental issues. For an alternative plan photovoltaic system is watched. So, photovoltaic system is trend of big city and it is mandatory for renovation of construction. Oil & gas filling station existed in city is suitable to found the photovoltaic system. But the general photovoltaic system in oil & gas filling station is difficult to found because it is classified into hazardous area. This paper evaluates intrinsic safety evaluation of solar cell for making basic data to found for the photovoltaic system on hazardous area. The intrinsic safety characteristic is evaluated by short-circuit ignition test using IEC type spark ignition test apparatus and temperature rising test. The result of short-circuit ignition test, propane-air mixture gas is exploded on condition that 4 solar cells(9[V], 90[mA]) are connected serially under insolation 800[W/$m^2$]. So, if a larger solar module will be used at oil & gas filling station than we were tested, it needs explosion proof. As the result of rising temperature test, the temperature rising due to short circuit is not so much, but when the temperature rises due to radiant heat, it demands careful consideration for environmental influence.

Examinations on the Reasonable Measuring Methods of the Soil Resistivity for Design of Grounding System (접지시스템의 설계를 위한 대지저항률의 합리적인 측정방법 고찰)

  • Lee, Bok-Hee;Kim, Ki-Bok;Lee, Seung-Hoon;Choi, Jong-Hyuk
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.6
    • /
    • pp.35-41
    • /
    • 2011
  • In order to design effectively the grounding system, it is very important to determine the optimum soil resistivity at the desired location of the connection to earth. This paper deals with the reasonable methods of measuring the soil resistivity where grounding electrodes are buried. The soil resistivity at three test sites with different resistivity of soil were measured as functions of the spacing between the test probes in the Wenner's four-point method and the length of test ground rod in the three-point method. In the case of the three-point method, the length of test ground rod of 2-10[m] in length was appropriate in two-layered soil structure. In the length range of 2-10[m], the results measured by the three-point method using the test ground rod with the length corresponding to the spacing between the test probes of the Wenner's four-point method are in good agreement with the data obtained from the Wenner's four-point method.