• Title/Summary/Keyword: Temporary Work

Search Result 297, Processing Time 0.032 seconds

Study under productivity measurement and verification of the underground temporary material installation work by simulation technique (시뮬레이션을 활용한 지하가설물 설치작업의 생산성 측정 및 검증에 관한 연구)

  • Bae Yeon-Jin;Park Sang-Hyuk;Han Seung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.427-432
    • /
    • 2004
  • As it is keen competition of a construction market and the recognition that increases construction productivity for maintaining competitiveness, it is increased importance of an interest about productivity and efficiency in the construction industry. This study measures productivity through the instance of investigation that the existing productivity measurement method was utilized and presented a work improvement matter based on the measured contents. The proposed improvement matter is verified through a simulation technique. The purpose of this paper is for a field supervisor to have presented the way that a selection does the most suitable work method to be suitable for a situation, and can forecast production, though a simulation technique is not the most alternative that considered field condition in analyzing productivity measurement.

  • PDF

Safety Management Information System in Construction Work - Focus on Apartment Work - (건설공사의 안전관리정보시스템 개발 - 아파트공사 중심으로 -)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.124-131
    • /
    • 2009
  • In any form of construction work, it is essential that accidents be prevented at every stage, from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instructions for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we present a model that assesses risk quantitatively by analyzing the risk factors involved in each stage of construction, such as foundation work, temporary work, structural work, equipment work, and finishing work. The model performs assessment based on examples of accidents and by investigating actual conditions during construction. In addition, we present in this paper a safety management system developed to assess risk during construction and to effectively train laborers.

Survey on Work Platform on Double Scaffold by Safety Standards (쌍줄비계 작업발판 안전기준에 따른 사용 실태조사)

  • Choi, Don-Hoeng;Choi, Jin-Woo;Go, Seong-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.3
    • /
    • pp.47-51
    • /
    • 2011
  • Work platform is temporary material that many workers use in construction field, but many workers construct and use the work platform without considering safety standards, workers who have not the knowledge of safety standards construct the work platform in weakness and use the work platform in unstable, According to the statistics in 2009, 1230 people were injured at the work platform. Among them, victims by falling account for about 77% and mostly lead to fatal injuries. we have studied and survey about the safety or danger of the work platform(set limits to duble scaffold) in construction field and about how many workers observe safety standards of the work platform. According to the result of this survey, 24%~100%(average : 68%) of the work platform in survey is not observe the safety standards.

What is the Origin of Inequalities in Work and Health? (노동과 건강 불평등, 그 근원은 어디인가?)

  • Son, Mi-A
    • Journal of Preventive Medicine and Public Health
    • /
    • v.38 no.3
    • /
    • pp.241-251
    • /
    • 2005
  • There has been an enormous increasing trend of widening gap of social inequalities since economic crisis at the end of 1997 in Korea. Since then, Korean society has deteriorated in economic and social conditions; the unemployment rate, temporary or casual workers and absolute poverty have increased. This paper presents the origin of inequalities in work and health in Korea. The origin of inequalities in work begins with the relationship between the capitalist and labourers in the capitalist mode of production. The conception and execution are dissolved in the work process in the capitalist mode of production. Thus, captitalists become control over ther labour process from workers. An alienation of the work process from the workers. The distribution of work is the majour source if inequalities in many countries as well as Korea. This paper presents the increasing tendency of unhealthy states such as mortality, early death, morbidity, physical work load, workplace injury amongst the under-privileged: ordinary workers, unemployed people, casual workers and socially deprived people in Korea.

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Integration of Temporary Fences for Demolition and Construction (해체${\cdot}$신축용 가설울타리의 통합방안)

  • Sin Dong-Sung;Jeon Jae-Man;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.258-261
    • /
    • 2003
  • Demolition is mort dangerous than construction and causes a lot of harmful environmental factors. But temporary fences used on demolition sites cannot play out their roles of blocking harmful environmental factors or securing stability and work space. They only block the view from the outside. This study begins with the possibility that the temporary fence can be installed prior to demolition. As a preceding step. we performed research on the actual conditions of using it. We then realized that it can be installed according to our research plan. First, we focused on actualizing the integration of temporary fences for demolition and construction. Here are the results of this study. First, we need to grasp the limiting factors of integration. Second, we ought to revise the Korean Architecture Standard Specification. Third, we should prepare against damage and transformation of fences. Finally, we can expect to reduce harmful environmental factors, cut down expenses, improve the working environment and raise the image of demolition by the integration of these fences.

  • PDF

The Architectural Languages of Ricardo Legorreta in the Gallery of Casa del Agua as Dwelling of Water (물의 주거로서 더 갤러리 카사 델 아구아에 구현된 리카르도 레고레타의 건축언어)

  • Kim, Hyoung-Jun
    • Journal of the Korean housing association
    • /
    • v.25 no.2
    • /
    • pp.37-44
    • /
    • 2014
  • The Gallery of Casa del Agua in Jeju Island was demolished by Jeju local government on March 6 in the last year. In the meanwhile, a lot of people including the architectural field had denied the demolition. Regardless of sustained efforts in order that the building could be preserved as a work, Jeju government ended up with demolishing the gallery. The Gallery of Casa del Agua was a temporary building constructed as a model house of Casa del Agua. As the remaining period of the temporary building had passed, it was on the verge of demolition by Jeju government. Casa del Agua is 'dwelling of water' in Korean, and the building was the last posthumous work of Mexican architect Ricardo Legorreta. Knowing from the expression of 'dwelling of water', this house is a dwelling work of him. Through this work, his architecture languages that he had pursued contained in dwelling could be looked into. This study examined the background and course of demolition of the Gallery of Casa del Agua, 'dwelling of water' and arranged problems in the course of demolition. Then, the fact that the Gallery of Casa del Agua as an architecture work of Ricardo Legorreta included his architecture languageswas analyzed. For this, his universalarchitecture languages were examined and how the architecture languages were applied to the Gallery of Casa del Agua was analyzed. As a result, it could be known that languages of composition and languages of emotion consistently shown in his works were represented in the Gallery of Casa del Agua.

An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park (울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석)

  • 성백진;이재근;최종희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.6
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

A Case study on a flood disaster restoration work (수해복구 현장 시공사례(영동선 분천${\~}$승부간 각금천 제1, 2교량))

  • Shin Hyeon-Kon;Kim Ji-Hoon;Bae Jun-Hyun;Lee Ju-Hyuk
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.159-164
    • /
    • 2004
  • Recently the unexpected damage is broken out by the unusal change of weather. Misfortune on top of misfortune the typhoon did great damage again before finishing the repair work. And then we should study about the repair work of fast and safety as well as the construction of safety. The paper suggests the case study of a fast disaster restoration work. To minimise the term of repair work which selects Fast Track Method. This work is processed as follows. Temporary resortation is progressed at the same time as the main resortation. And In this paper, technique to evaluate the capacity of bridge is tried to develop by means of FEM analysis.

  • PDF