A Study on the Buckling Characteristics of Steel Pipe Scaffold (강관비계의 좌굴특성에 관한 연구)

  • Paik, Shin-Won;Song, In-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.57-61
    • /
    • 2010
  • Formwork is a temporary structure that supports its weight and that of fresh concrete as well as construction live loads. Scaffoling is a temporary frame used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes, although it can be made out of other materials. Bamboo is still used in some Asian countries like China. The purpose of a working scaffold is to provide a safe place of work with safe access suitable for the work being done. In construction site, steel pipes are usually used as scaffolds. In this study, scaffolding systems which is changed according to sleeper and joist space were measured by buckling test. Buckling load of respective scaffolding system was analyzed by structural analysis program(MIDAS). Buckling load of scaffold with/without wall connection and footboard was got by test and structural analysis. According to these results,we know that scaffolding system of case 3 is suitable. Buckling load of scaffold with wall connection is higher than without wall connection. So wall connection is important in scaffoling systems. Footboard in the scaffolding systems is not effective against promotion of buckling load. Finally, the present study results will be used to design scaffolding systems safely in the construction sites.

The Planning of Temporary Housing for Post Application of Mega Sports Facilities - Focused on the 2018 Winter Olympics - (메가스포츠시설의 사후 활용을 위한 임시주거 계획 - 2018평창동계올림픽을 중심으로 -)

  • Lee, Jong-Chan;Kang, Youn-Do;Kim, Byung-Sean
    • KIEAE Journal
    • /
    • v.16 no.4
    • /
    • pp.41-46
    • /
    • 2016
  • Purpose: This is a study on the planning of temporary housing for post application of Mega Sports facilities. The subject of the study is 2018 Pyeongchang Winter Olympics, which is to suggest building an alternative temporary housing using shipping containers(high cube), which solve the lack of accommodations and recycle temporary housing after Olympics, save money and be eco-friendly in Olympics. Method: This study includes this ; research on the a fact-finding survey about Mega sports facilities post application and demand survey on 2018 Pyeongchang Winter Olympics accomodations and an analysis about temporary housing plan. Furthermore we decided temporary housing building plan by analyzing residents' needs and traits of the housing etc. Through this, we made a schematic design for household units. Result: As a result, this study is a plan of making space, forms, and structure. The planned size is $38.4m^2$(L:12m, W:3.2m) except balcony, and indoor height is 2.5m. The space consists of entrance, bathroom, bedroom and living room with folding furniture system. Also there's a detailed floor plan of the ceiling, wall, and floor we drew up. The ceiling and wall consist of dampproof film, noncombustible board, fire proof urethane form, and color-designed sheet. The floor is composed of floor tile, cement mortar, light concrete(with heat coil), insulation, and dampproof film. Additionally, this study is a plan of interior dry wall with detail using modular construction method for work efficiency and quality improvement.

Steel Plate Girder Railway Bridge Ballast System using Rail Transfer Method(III) (선로이송 가설공법을 적용한 철도판형교 유도상화(III))

  • Min, Ji-Hong;Jang, Jun-Hyun;Kim, Jin-Yong;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1569-1576
    • /
    • 2011
  • To install heavy structures in the railway bridges, crane methods or launching methods using temporary structure have been applied. These methods are uneconomical because working yard is required, temporary cut of rail system, etc. In this study, various construction methods has been developed which are suitable to the filed conditions. In the case of simple span structure like plate girder bridges, the girder is loaded to troy system at the working yard and then transferred to the working place. To lift and lower the girder system, a new transfer system was developed. Different methods each for simple span bridge girder and long span girder were developed and detailed work procedures were proposed. Using these methods, the heavy structures can be installed with simple and safe work procedures and the construction cost and duration can be reduced.

  • PDF

Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction (건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안)

  • Kim, Tae-Hoon;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

Application of Ubiquitous Sensor Network at Construction Sites (건설 시공현장에서의 USN 활용)

  • Moon, Sung-Woo;Choi, Byoung-Young;Ji, Young-Eun;Seo, Ki-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.905-908
    • /
    • 2007
  • Concrete placement work is executed using temporary structures such as formwork, support, etc. The temporary structures could collapse when they are not properly supported, and need to be monitored for structural safety. This paper introduces a USN (Ubiquitous Sensor Network)-based monitoring system that are being tested at the Pusan National University for increasing structural safety. The system takes advantage of ubiquitous technologies together with a variety of sensors, which allows for wireless transmission of construction monitoring data. The temporary structures are constantly monitored to find out whether the structures are being supported in a stable condition. A field test is being conducted to acquire data, and use them for evaluating the safety condition of the construction operation.

  • PDF

A Methodology of the Static Analysis for Scaffolding Structure (가설공사 비계의 정적구조 해석에 관한 연구)

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.8 no.2
    • /
    • pp.16-22
    • /
    • 1993
  • Accidents, especially fatal accidents in construction work are being not reduced, but increased, despite of more concerns of related authority and companies themselves. It is investigated that major reasons of which these accident increase are caused to set up wrong temporary structures : scaffolding with insufficient components or safety guards. Approximately 50% of falling accident, one of three major accidents; falling collapsing of structures or soil, accidents from heavy equipments, are due to defects of temporary structures. Therefore, technical standards for these temporary structures made by the ministry of labour in 1984, should be promptly revised because of its insufficient considerations for structural concepts. A method to effectively ensure the construction safety are shown through an experimental method, mathematical analysis structural planning against overturning and collapsing of scaffold-ing components, consideration of safety factor in loading, formulations of safety structure against falling or dropping from schaffolding.

  • PDF

Accident Prevention and System Improvement Strategies for small and medium-sized construction sites (중소규모 건설현장 재해원인 분석 및 제도적 개선방안)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.59-64
    • /
    • 2009
  • This study is to analyse the causes of accident in small and medium-sized construction sites and to provide prevention strategies and system improvement guidance. Although occupational safety and health act regulates the standards and installations of temporary structures, about an half of construction accidents were caused by poor temporary structures such as guardrails, scaffolds, work platforms, etc. It investigated 51 construction sites which is located in metropolitan area by asking a series of questions including their knowledge about regulations and opinions about prevention strategies. The result shows that many of the respondents do not have sufficient understandings about the regulations, and it implies that education and training must be reinforced in order to enhance the safety-awareness and to develop the comprehension of regulations.

A Study on the Improvement of Temporary Ventilation of long tunnel Using the Field Measurement data (현장 실측을 통한 장대터널 공사중 환기 문제점 연구)

  • Hong, Chang-Soo;Hwang, Dae-Jin;Kang, Hyun-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1350-1357
    • /
    • 2010
  • In tunnelling, temporary ventilation is very important factor in the safety of worker and the work efficiency which is affected by visibility. There are a lot of problems in the recent tunnel construction, because the longer the tunnel, the more the present design doesn't satisfy the allowable standard about dust and air pollution. Especially, In case the length of tunnel is more than 1,000m, the ventilation efficiency tends to decrease. In this study, the field measurement of the degree of contamination was performed near the face of tunnel. Based on the results obtained, the main factors of problem in temporary ventilation are the difference of temperature between outside and inside, the rate of leakage of ventilation duct and the dust and so on. It maybe helpful to the solution of problems, and also the accurate ventilation estimate.

  • PDF

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.