A Methodology of the Static Analysis for Scaffolding Structure

가설공사 비계의 정적구조 해석에 관한 연구

  • 손기상 (한국산업안전공단교육원)
  • Published : 1993.06.01

Abstract

Accidents, especially fatal accidents in construction work are being not reduced, but increased, despite of more concerns of related authority and companies themselves. It is investigated that major reasons of which these accident increase are caused to set up wrong temporary structures : scaffolding with insufficient components or safety guards. Approximately 50% of falling accident, one of three major accidents; falling collapsing of structures or soil, accidents from heavy equipments, are due to defects of temporary structures. Therefore, technical standards for these temporary structures made by the ministry of labour in 1984, should be promptly revised because of its insufficient considerations for structural concepts. A method to effectively ensure the construction safety are shown through an experimental method, mathematical analysis structural planning against overturning and collapsing of scaffold-ing components, consideration of safety factor in loading, formulations of safety structure against falling or dropping from schaffolding.

Keywords