• Title/Summary/Keyword: Telemetry Ground System

Search Result 72, Processing Time 0.02 seconds

Study of the Telemetry Ground Station for FA-50 Flight Test Instrumentation System (신규 형상에 따른 FA-50 지상계측 방안 연구)

  • Lee, Ju-Ha;Kim, Bo-Sung;Yoo, Byeong-Seon
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.16 no.4
    • /
    • pp.20-25
    • /
    • 2008
  • The purpose of this study is leading to reduce the setup time and cost of the ground telemetry system for FA-50 program. And using the accumulated experience during T-50 and TA-50 development period, remove the risk of development and construct the optimal ground telemetry system for FA-50. For this study, collect the ground telemetry data of the T-50/TA-50, analyze the data and problems and then suggest the optimal telemetry ground system for FA-50.

  • PDF

The Data Processing System Development of Telemetry Ground System for Korean Space Launch Vehicle-1 (KSLV-1의 신호 수신.처리를 위한 원격측정 지상국시스템의 자료처리시스템 개발)

  • Ma, Jin-A;Kwon, Soon-Ho;Oh, Chang-Yul;Lee, Hyo-Keun
    • Aerospace Engineering and Technology
    • /
    • v.6 no.1
    • /
    • pp.245-254
    • /
    • 2007
  • The on-board telemetry system of KSLV-1 transmits telemetry signal for the launch vehicle and satellite to ground telemetry system in real time. In ground telemetry system, antenna system acquires telemetry signals and transfers these to data processing system. Data processing system processes and recordes telemetry data and distributes it to each mission operator in order to monitor it the operation goes well or not. This document describes the configurations and functions of data processing system designed for efficient and appropriate processing of telemetry data.

  • PDF

Development and Test of Line-Telemetry DPS for KSLV-I Upper Stage (나로호 상단부 Line-Telemetry 데이터처리시스템 개발 및 시험)

  • Kim, Kwang-Soo;Lee, Soo-Jin;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.107-115
    • /
    • 2011
  • The line-telemetry data processing system is necessary for monitoring the status of each onboard systems of KSLV-I upper stage during the ground tests and launch preparation. The mission of line-telemetry system is to provide reference telemetry data and to monitor the status of upper stage. The line-telemetry data processing system consists of a PCM acquisition/processing server, a system management server, and 9 monitoring consoles. In this paper, we will describe the overview of onboard remote measurement system, the design of the line-telemetry data processing system, anomaly setup information for indicating alarm signal in case of abnormal occurrence, and the result of the ground test and flight test.

A Study on Optimum Hybrid Post-Processing Method for Multiple Telemetry Streams (원격측정 다중 스트림 최적 혼합 후처리 기법 연구)

  • Kim, In Jong;Lee, Sungpil;Chang, Dukjin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.5
    • /
    • pp.616-624
    • /
    • 2019
  • In order to understand flying aircraft, satellite, missile, etc, a telemetry ground system is used to receive, record, and process the transmitted radio signal from vehicles. In some cases, a line-of-sight communication is not possible along to the trajectory of vehicles, and multipath fading result in a shade area of communication. A number of telemetry ground systems are installed to overcome this limitation, and acquire the transmitted signal seamlessly. The telemetry signals received by multiple independent ground systems have independent probability of errors since they experienced their own communication channels. In other words, we can exploit the independent error characteristics of received signals by processing them in a hybrid method. The optimum hybrid post-process method is proposed in this study, and applied to process telemetry signals acquired from flight tests.

Interference Analysis for Mutual Coexistence between Telemetry System based on IRIG Standard and Commercial LTE-TDD (IRIG 표준기반의 Telemetry 시스템과 상용 LTE-TDD간 상호공종을 위한 간섭분석)

  • Yun, Deok-Won;Choi, Joo-Pyoung;Lee, Won-Cheol;Kim, Chun-Won;Han, Jeong-Woo;Kim, Dae-Oh
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.10 no.6
    • /
    • pp.512-521
    • /
    • 2017
  • Telemetry ground station use very high gain directional antenna systems that are sensitive to interference from other RF communication systems, Without appropriate interference protection, these systems could be severely impacted or even rendered useless for mission support. In ECC, we suggested ans interference analysis method between LTE-TDD system and telemetry ground station using 2.3GHz. In this paper, based on the interference analysis scenario considered in Electronic Communication Committee, We have derived mutual coexistence separation distance between telemetry ground station and LTE-TDD system(Base station, User equipment) in Spatial domain.

Development of Data Processing Ground Test System for Telemetry using Wireless Communication (무선 통신을 이용한 원격측정 자료처리 지상 점검 시스템 개발)

  • Ro, Yun-hee;Bae, Hwi-jong;Kim, Dong-young;Yun, Seong-jin;Lee, Nam-sik
    • Journal of Advanced Navigation Technology
    • /
    • v.26 no.1
    • /
    • pp.1-8
    • /
    • 2022
  • Telemetry system is a system that measures and transmits status information in the aircraft to the ground. The data received from the ground is information for monitoring the state of the aircraft, and can be checked and analyzed in real time through the test program. Data processing test system for telemetry currently in operation is built to transmit data using wired communication and perform test. As smart devices become popular due to the continuous development of information and communication technology, wireless communication networks are becoming important, and technologies for improving performance are steadily being developed. In this paper, we suggests and builds data processing ground test system for telemetry using wireless communication(Wi-Fi) that can be checked through smart devices such as tablets, in order to break away from the existing method and apply future-oriented technology. Finally, the suggested test system performance was proved by testing in various environments by linking test equipment and test program.

Application of trajectory data mining to improve the estimation accuracy of launcher trajectory by telemetry ground system (원격자료수신장비의 발사체궤적 추정정확도 향상을 위한 궤적데이터마이닝의 적용)

  • Lee, Sunghee;Kim, Doo-gyung;Kim, Keun-hyung
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.20 no.5
    • /
    • pp.1-11
    • /
    • 2015
  • This paper is focused on how the trajectory of launch vehicle could be optimally estimated by the quadratic regression of trajectory data mining for the operation of telemetry ground system in NARO space center during real-time. To receive the telemetry data, the telemetry ground system has to track the space launch vehicle without tracking loss, and it is possible by the well-designed algorithm to estimate a flight position in real-time. For this reason, the quadratic regression model instead of interpolation was considered to estimate the exact position data of launch vehicle and the improvement of antenna performance. For analysis, the real trajectory data which had been logged during NARO 1st launch mission were used, the estimation result of launcher current position was analyzed by the mathematical modeling. In conclusion, the algorithm using quadratic regression based on trajectory data mining showed the better performance than previous interpolation algorithm to estimate the next flight position and the antenna driving performance.

On-line Strain Measurement of Rotating Blade Using Fiber Bragg Grating Sensors and Beam Coupler (광섬유 격자 센서와 빔 커플러를 사용한 회전중인 블레이드의 변형률 측정 방법)

  • Lee, In-Jae;Lee, Jong-Min;Lee, Sang-Bae;Hwang, Yo-Ha
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.16 no.11 s.116
    • /
    • pp.1172-1178
    • /
    • 2006
  • Measurement of blade strain with sensors directly installed on the blade has one critical issue, how to send the sensor signal to the ground. Strain-gauges have been dominantly used to directly measure stress of a blade and either a slip ring or a telemetry system has to be used to send measured signal to the ground. However, both systems have many inherent problems and sometimes very severe limitations to be practically used. In this paper, new on-line strain monitoring method using. FBG(Fiber Bragg Grating) sensors and a beam coupler is introduced. Measurement of rotor stress using FBG sensors is nothing new, but unlike other system which installs all necessary instruments on the rotor and use telemetry system to send data to the ground, this system makes use of light's unique characteristic - light travels through space. In this new approach, single optical fiber with many FBG sensors is installed on the blade and all other necessary instruments can be installed at ground thereby giving tremendous advantages over slip ring or telemetry system. A reference sensor is also introduced to compensate the beam coupler's transmission loss change due to rotation. The suggested system's good performance is demonstrated with experiments.

A Study on the Telemetry System of Temperature and Salinity (수온 . 염분 원격측정시스템에 관한 연구)

  • 이유원
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.33 no.2
    • /
    • pp.132-140
    • /
    • 1997
  • The basic experiment on the telemetry system of temperature and salinity, which is a study for the effective management of costal fishing-ground nowadays, was carried of 8 days from April 5, 6, 26, 27 , 1996 to May 31 and June 1, 21, 22, 1996 at the fish farm of Yooksam at Samyang-Myun, tongyongkun(34。45.02'N, 128。24.79'E). The results obtained were as follows : 1. The average temperature and salinity of STD of telemetry system was coincided with that of ICTD system calibration precisely. 2. A daily variation of temperature in fish cage which was measured by the telemetry system was influenced mainly by sunrise and sunset. 3. A daily variation of salinity in fish cage which was measured by the telemetry system was influenced mainly by tidal current. 4. The fish school in fish cage was distributed mainly 2~7 m layer during daylight and was arisen to the surface at sunset, was settled down to the bottom at sunrise.

  • PDF

위성발사를 위한 원격측정 지상국시스템 설계에 관한 연구

  • Lee, Sung-Hee;Oh, Chang-Yul;Lee, Hyo-Keun
    • Aerospace Engineering and Technology
    • /
    • v.2 no.2
    • /
    • pp.167-178
    • /
    • 2003
  • The design on the Telemetry Ground System for launch of KSLV(Korea Space Launch Vehicle) in the korean Space center has been conducted in this study. For the optimized system design, first of all, the system deployment plan reflecting the topographic and geographic environments of the space center and launch vehicle characteristics has been developed. The RF link budget analysis for the maximum tracking range, requirement for receiving subsystem including antenna subsystem, requirement for data processing subsystem are also analyzed based on the On-Board Telemetry characteristics and launch vehicle parameters. Based on those analysis, telemetry ground system containing tracking/receiving subsystem, recording subsystem and data processing subsystem, timing subsystem, calibration subsystem and monitoring and control subsystem are designed. Futhermore, the analysis for the maximum permissible data latency and communication protocol between each telemetry station and control center are conducted and the entire system is designed so that the major telemetry parameters selected to the best quality are provided in real time to the control center(RCC, RSC) for the launch mission operation.

  • PDF