Journal of the Korean Society for Aviation and Aeronautics
/
v.21
no.3
/
pp.27-40
/
2013
Rotorcraft operating in the domestic aviation safety techniques are applied CRM training is conducted but, aircraft accidents caused by human factors has not shown a declining trend. Thus, knowledge of aviation safety and human factors for the spread of awareness of improved rotorcraft flight operations department managers to understand the complexity of nature and culture, and to perform high-risk mission helicopter pilot study of local activation and enhance safety awareness research was conducted in order to. In this study, the development direction of CRM training studies in order to identify the leading NOTECHS (Non-Technical Skills; non-technical pilot skills) of the four categories as the independent variable and the dependent variable corresponding to the resulting effect on the key variables awareness of the differences were studied. In addition, the direction and strength of the relationship were analyzed to determine the relationship of each independent variable to assess the impact on the dependent variable regression analysis was performed. Pilot training and evaluation of non-technical skills related to the teaching reflected in the CRM training and assessment must be carried out with 5 star rating scale was preferred. Therefore, to meet our country rotorcraft operating environment 'NOTECHS' aviation safety by developing training programs reflected in the educational process, implementation, and periodic training and assessment is done in future research on this analysis and feedback is done to reflect the specific performance expect.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.2
/
pp.87-95
/
2011
A Renewable Portfolio Standard(RPS) is a regulation that requires the increased generation of energy from renewable energy sources such as solar, wind, fuel cell, small hydro, biomass and geothermal. By environmental, technical and these regulatory reasons, the amount of renewable energy sources will be increased in a network. However, it is hard to assess risk of a transmission network with large scale renewable energy sources because the output characteristics of renewable energies are intermittent. This paper evaluates effects of a transmission system with supplemental large scale renewable energies into the existing system. To evaluate these effects, a methodology for risk level of components in a network is proposed considering steady state and contingency N-1 in this paper. We consider line current and bus voltage in each state of a network.
Proceedings of the Korean Geotechical Society Conference
/
2001.03a
/
pp.493-500
/
2001
The construction of bored tunnels in soft ground inevitably causes ground movements. In the urban environment these may be of particular significance, because of their influence on buildings, other tunnels and services. The prediction of ground movements and the assessment of the potential effects on the structures is therefore an essential aspect of planning, design and construction of a tunnelling project in the urban environment. In this study, to minimize the effect of tunnelling-Induced ground movements on the adjacent structures, a system for tile settlement risk management was developed. The GIS based risk assessment system for adjacent structures developed in this study consists of several modules such as building information module, settlement evaluation module, potential risk assessment module for adjacent structures, and analysis module for monitoring data. This system focuses on controlling and managing construction processes that may lead to settlement In the surrounding buildings and can contribute to producing the optimum technical and economic design.
International Journal of Computer Science & Network Security
/
v.22
no.6
/
pp.297-309
/
2022
Taking into account the globalization of the economy and the intensification of European integration processes, it has been proved that an important part of evaluating the effectiveness of activity of public sector enterprises should be a comparative analysis of the overall operation environment, namely public procurement, economic environment and tax policy, with the relevant systems of other countries of the world. The indicators and components of international ratings "Doing Business", "Paying Taxes", "Benchmarking Public Procurement" have been studied. Different groups of indicators forming "Doing Business" and "Paying Taxes" in the context of the impact on public sector enterprises have been identified: those which fully comply with the need to evaluate the operating environment of public sector enterprises and those which should be used with restrictions, regarding the peculiarities of creating and functioning of public sector enterprises. A comparative analysis of the place of Ukraine, Lithuania and Slovenia among other countries of the world in accordance with the international rankings of "Doing Business", "Paying Taxes", "Benchmarking Public Procurement" have been made. It has been substantiated that the results of such comparative analysis will allow identifying risk areas, and relevant information can be used in developing of recommendations for improving the effectiveness of activity of public sector enterprises.
Journal of the Korea Institute of Information Security & Cryptology
/
v.34
no.3
/
pp.537-552
/
2024
Domestic nuclear power plants operate under the establishment of the "Information System Security Regulations" in accordance with the Nuclear Safety Act, introducing and implementing a cybersecurity system that encompasses organizational structure as well as technical, operational, and managerial security measures for assets. Despite attempts such as phased approaches and alternative measures for physical protection systems, the reduction in managed items has not been achieved, leading to an increased burden on security capabilities due to limited manpower at the site. In the main text, an analysis is conducted on Type A1 assets performing nuclear safety functions using Maintenance Rules (MR) and EPRI Technical Assessment Methodology (TAM) from both a maintenance perspective and considering device characteristics. Through this analysis, approaches to re-evaluate the impact of cyber intrusions on asset functionality are proposed.
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.635-642
/
2004
Failure occurred slope, due to typhoon 'Rusa' and 'Maemi' last two years, was studied to evaluate the slope failure characteristics. There're three types of the slope in this study, ie. soil slope, rock slope, mixed slope. Statistical analysis was used to estimate the relation between slope type and failure mode. Among the failure occurred slope, soil slope & mixed slope are dominant at the ratio of 33%, 44% respectively. We conclude that soil slope & mixed slope have more higher risk than rock slope during heavy rainfall.
From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.
Kudryavtsev, Sergey S.;Yemelin, Pavel V.;Yemelina, Natalya K.
Safety and Health at Work
/
v.9
no.1
/
pp.30-41
/
2018
Background: The purpose of the work is to develop a system that allows processing of information for analysis and industrial risk management, to monitor the level of industrial safety and to perform necessary measures aimed at the prevention of accidents, casualties, and development of professional diseases for effective management of industrial safety at hazardous industrial sites. Methods: Risk assessment of accidents and incidents is based on expert evaluations. Based on the lists of criteria parameters and their possible values, provided by the experts, a unified information and analytical database is compiled, which is included in the final interrogation questionnaires. Risk assessment of industrial injuries and occupational diseases is based on statistical methods. Results: The result of the research is the creation of Guidelines for risk management on hazardous industrial sites of the Republic of Kazakhstan. The Guidelines determine the directions and methods of complex assessment of the state of industrial safety and labor protection and they could be applied as methodological basis at the development of preventive measures for emergencies, casualties, and incidents at hazardous industrial sites. Conclusion: Implementation of the information-analytical system of risk level assessment allows to analyze the state of risk of a possible accident at industrial sites, make valid management decisions aimed at the prevention of emergencies, and monitor the effectiveness of accident prevention measures.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.04a
/
pp.208-209
/
2022
This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.
One fundamental element of probabilistic safety assessment (PSA) is the initiating event (IE) analysis. Since IE frequencies can change over time, time-trend analysis is required to obtain optimized IE frequencies. Accordingly, such time-trend analyses have been employed to estimate industry-average IE frequencies for use in the PSAs of U.S. nuclear power plants (NPPs); existing PSAs of Korean NPPs, however, neglect such analysis in the estimation of IE frequencies. This article therefore provides the method for and results of estimating Korean industry-average IE frequencies using time-trend analysis. It also examines the effects of the IE frequencies obtained from this study on risk insights by applying them to recently updated internal events Level 1 PSA models (at-power and shutdown) for an OPR-1000 plant. As a result, at-power core damage frequency decreased while shutdown core damage frequency increased, with the related contributions from each IE category changing accordingly. These results imply that the incorporation of time-trend analysis leads to different IE frequencies and resulting risk insights. The IE frequency distributions presented in this study can be used in future PSA updates for Korean NPPs, and should be further updated themselves by adding more recent data.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.