• Title/Summary/Keyword: Synthetic test method

Search Result 242, Processing Time 0.026 seconds

A Study on Optimization of the Weil-Dobkes Synthetic Short-Circuit Tests (Weil-Dobke 합성단락시험로의 최적화 연구)

  • 김맹현;고희석
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.6
    • /
    • pp.287-292
    • /
    • 2001
  • This paper deals with the configuration, operating principles, systematic calculation method of parameter and optimization method of test circuit for parallel current injection method, series voltage injection method and hybrid synthetic test method as the method for performance test of circuit breaker with extra high interrupting capacity. The test method depicted above is applied to short-circuit making and breaking test (operating sequence :Os CdOs, Od-CdOs) and out-of-phase tests(operating sequence :Os, CdOs) for performance test of the newly-developed 420kV, 50kA and 800kV 50kV puffer-type gas circuit-breaker according to IEC 60056 and IEC 60427. The testing results, evaluation of equivalence for test and analyzed results are also presented in this paper.

  • PDF

An Improved Method for the Measurement of Fungal Degradability of Synthetic Polymers (진균에 의한 합성고분자재료 분해도 측정법의 개선)

  • 이영하;이정애;맹필재;전창림
    • Korean Journal of Microbiology
    • /
    • v.28 no.2
    • /
    • pp.158-161
    • /
    • 1990
  • An improved fungal test method, soft agar overlay method, has been developed for the measurement of biodegradability of synthetic polymers. Advantages of this technique over conventionally used test method of ASTM include better visualization of fungal growth on polymeric materials, shortening of incubaiton period, and engnaced sensitivity especially to polymeric materials containing highly recalcitrant molecules.

  • PDF

A Study on Application of Exposure System using Waterproofing Sheets of Synthetic Polymer for Rooftop (옥상용 합성고분자 시트를 애용한 지붕노출 시스템 적용에 관한 연구)

  • Lee Sang Su;Kim Su-Ryon;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.179-183
    • /
    • 2005
  • In apply roof waterproof system using of synthetic high polymer sheet for rooftop measure physical performance (tension$\cdot$tearing ability, temperature relativity, heating stretch performance, junction performance, wind resistance test) by various test environment condition waterproof test of structure and performance of construction work aspect, present suitable form of construction work under these environment. Also, wish to improve durability of concrete structure as that examine in priority about adhesion method and joint junction method with waterproof out surface, and present new direction about roof system application of waterproofing method for rooftop.

  • PDF

A study on circuit design of synthetictest facilities of capacitive current switching tests (합성 진상전류 개폐 시험설비의 회로설계에 관한 연구)

  • Kim, M.H.;Suh, Y.T.;Yoon, H.D.;Shin, Y.J.;Kang, Y.S.;Koh, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.38-40
    • /
    • 2002
  • A study on the test method and the test facilities of synthetic capacitive current tests have been very slight and the direct test method with the short-circuit generator and power transformer only used up to now. However, according to the development of analysis technique of power system and design and manufacture technique we are realized that direct testing method is not satisfactory to evaluate the performance of circuit-breaker because it is difficult to simulate precisely the conditions of power system. Therefore, in order to solve these problem this paper deals with the tests methods and the design technique of the tests facilities of the synthetic capacitive current based on the same theory with the synthetic short-circuit tests.

  • PDF

Detecting location of reinforcing bars in concrete using synthetic aperture radar method (합성개구 레이더법에 의한 콘크리트 내 철근위치 산정)

  • Park, Seok-Kyun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.602-605
    • /
    • 2006
  • Locating reinforcing bars, in particular to know their accurate depths and horizontal distances, is very important in radar inspection of concrete structures. By the way, it is not easy for an accurate depth and horizontal distance estimation of reinforcing bars in concrete structures by the radar test. This problem can be solved by synthetic aperture radar method. To improve the vertical and horizontal resolution of reinforcing bars in concrete, synthetic aperture radar method was examined in this study.

  • PDF

Three-phase Making Test Method for Common Type Circuit Breaker

  • Ryu, Jung-Hyeon;Choi, Ike-Sun;Kim, Kern-Joong
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.5
    • /
    • pp.778-783
    • /
    • 2012
  • The synthetic short-circuit making test to adequately stress the circuit breaker has been specified as the mandatory test duty in the IEC 62271-100. The purpose of this test is to give the maximum pre-arcing energy during making operation. And this requires the making operation with symmetrical short-circuit current that is established when the breakdown between contact gap occurs near the crest of the applied voltage. Also, if the interrupting chamber of circuit breakers is designed as the type of common enclosure or the operation is made by the gang operated mechanism that three-phase contacts are operated by one common mechanism, three-phase synthetic making test is basically required. Therefore, several testing laboratories have developed and proposed their own test circuits to properly evaluate the breaker performance. With these technical backgrounds, we have developed the new alternative three-phase making circuit.

Reignition system for synthetic short-circuit test (합성단락시험용 재점호장치)

  • Park, Seung-Jae;Kim, Maeng-Hyun;Kang, Young-Sig;Shin, Young-June;Koh, Heui-Sek
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1856-1858
    • /
    • 2000
  • This paper describes the principles of reignition system which has newly been developed and used as KERI's high power testing facilities. Synthetic short-circuit testing method is generally adopted to perform the short-circuit test of the ultra high-voltage circuit breakers, which consists of two separated sources such as the current source from short-circuit generator and the voltage source from charged energy in capacitor. And, in case of synthetic short-circuit test, it will be necessary to use the reignition system in order to extending the arcing time of the circuit breaker and provide the arc energy equivalent to the direct testing method.

  • PDF

TRV Pattern Classification and Parameter Calculation Method for Double-Frequency Synthetic Test Circuit (2중주파 합성시험회로의 TRV 패턴 분류 및 파라미터 계산 방법)

  • Lee Yong Han
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.587-589
    • /
    • 2004
  • In this paper analytical pattern classification of TRV waves created by double-frequency synthetic test circuit was proposed. According to the classified patterns of the TRV wave, calculation methods of 3 reference lines and 4 parameters characterizing the TRV wave wire proposed. These methods can be utilized to optimize test facility and to standardize test quality.

  • PDF

Optimized Synthetic Making Test Facilities for Estimating the Making Performance of Circuit Breaker (차단기의 투입성능 평가를 위한 최적 합성투입시험설비)

  • Suh Yoon-Taek;Kim Maeng-Hvun;Song Won-Pyo;Koh Hee-Seog;Park Seung-Jae
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.6
    • /
    • pp.284-292
    • /
    • 2005
  • Because all of the short-circuit testing laboratories have the limitation of test facilities, the synthetic making test methods have been used to estimate the short-circuit making performance of the ultra high-voltage circuit breaker as the alternative to direct test methods. So, KERI(Korea Eelctrotechnology Research institute) has completed the construction of the synthetic making test facilities using the low capacity step-up transformer method which fulfill the requirements specified in newly revised IEC 62271-100 Edition 1.1(2003) and have the testing capability up to 550kV, 63kA full-pole circuit breaker. The test facilities using the low capacity step-up transformer method presented in this paper are made up of the unit equipments such as HCS(High-speed Closing Switch), ITMC(Initial Transient Making Current) circuit and UP TR(low capacity step-up transformer) and have the operating range of 17.6$^{\circ}$ $\~$ 145.1$^{\circ}$ for testing the circuit breaker rated on up to 50kA and 43.1$^{\circ}$ $\~$ 119.6$^{\circ}$ for more than 50kA.

Re-ignition System using Vacuum Triggered Gap-switch for Synthetic Breaking Test

  • Park Seung-Jae;Suh Yoon-Taek;Kim Dae-Won;Kim Maeng-Hyun;Song Won-Pyo;Koh Hee-Seog
    • KIEE International Transactions on Electrophysics and Applications
    • /
    • v.5C no.4
    • /
    • pp.145-151
    • /
    • 2005
  • The synthetic breaking test method was developed to evaluate the breaking performance of ultra high-voltage circuit breaker and made up of two independent circuits; current source circuit and voltage source circuit. In application of this test method, it is necessary to extend the arc of the test breaker. So, the new re-ignition system using VTGS (Vacuum Triggered Gap-Switch) was constructed to improve the efficiency and reliability of this test. In this re-ignition system, VTGS operates in high vacuum state of $5{\time}10^{17}$torr and control system consists of the triggering device and the air M-G (Motor-Generator). This re-ignition system showed the operating characteristics, such as delay time ($t_d$) and jitter time ($t_j$ not exceeding 5us and 1us respectively, and had the operating voltage of $25\~150kVdc$ at the gap distance of 24mm.