Journal of the Korean Society of Environmental Restoration Technology
/
v.10
no.6
/
pp.139-151
/
2007
To protect the surface of ground-cutting slopes and ground-raised slopes and to recover environment-friendly slopes at the national road expansion construction between Gamchon and Yaechon, test-construction work was done using several modes of hydro-seeding measures to select a suitable construction method through the field survey; the results were as follows : As a result of survey on physio-chemical characteristics of soil, the average soil inclination on ground-raised slopes was from 4.73 mm to 5.37 mm; the average soil acidity was from pH 6.47 to 6.73; the average soil humidity was within the scope of 0.57~1.70 %,; the average soil inclination on ground-cutting slopes was 9.17~10.43mm; the average soil acidity was pH 6.67~6.77 and the average soil humidity was within the scope of 0.53~1.27 %; considered overall, they showed generally satisfactory base materials for plant breeding. As a result of the number of sprouting individuals, the average sprouting number of individuals on test spots executed by Coir net with Seed spray construction methods and the average number of sprouting individuals on other test spots executed by furrow-digging with Seed spray and Straw mat-mulching measures were 1,172 number of per square meter and 970 number of per square meter respectively; thus they showed higher numerical value comparing with other test spots. Likewise, the average number of sprouting individuals on test spots of the ground-cutting slopes executed by Coir net with Seed spray method and the average number of sprouting individuals on other test spot executed by furrow-digger with Seed spray and Straw mat-mulching measures were found to be 1,107 number of per square meter and 1,105 number of per square meter respectively, whose numerical value showed rather higher other test spots. As a result of a survey on living plants' breeding index [dried weight], the weight in dried state on test spots executed by Coir net with Seed spray method and other test spots executed by furrow-digger with Seed spray and Straw mat-mulching measures on both ground-raised and ground-cutting slopes was found to be higher and showed similar characteristics statistically. As a result of survey on the surface-covering degree of ground-raised slopes, nine weeks after test construction, test spots executed by Coir net with Seed spray method and other test spots executed by furrow-digger with Seed spray and Straw mat-mulching measures showed commonly more than 70% of surface-covering degree, but other test spots showed only below 35% of surface covering degree; especially in case of test spots by Verdvol seed spray measures, they showed 10% of the lowest surface-covering. Surface-covering degree on the test spot of ground-cutting slopes nine weeks after test construction showed more than 75% both executed by Coir net with Seed spray construction method and executed by furrow-digger with Seed spray and Straw mat-mulching measures. As a result of survey on appearing plants on the test spots, there dominates Eragrostis curvula both on ground-raised slopes and on ground-cutting slopes with other seeding plant life's lower breeding and there appear intruders, such as Setaria viridis Beauv, Digitaria sanguinalis Scop, and Chenopodium album var.centrorubrum Makino. As for water-borne excavation and soil's washing-away on the slopes, there happened less washing-away and water-borne excavation with good breeding of plant life on test spots executed both by Coir net with Seed spray construction method and by furrow-digger with Seed spray and Straw mat-mulching measures, but there happened much more soil's washing-away along with water-home excavation at the test spot executed by Seed spray with measures. After the research results of test construction sites are examined overall, it's presumed that furrow-digger with Seed spray and Straw mat-mulching measures [interval between lines is 40cm, 5cm in depth] will be preferred to prevent erosion and water-home excavation of slopes located within the construction sites.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.3
/
pp.155-160
/
2018
The unmanned aerial vehicle (UAV) is used in various fields, such as land surveying, facility management, and disaster monitoring and restoration because it has low operational costs, fast data acquisition, and can generate a digital surface model (DSM). Recently, the UAV has been applied to process management in construction projects. Construction projects are widely distributed not only in urban areas but also in mountainous areas and rural areas where people are rarely in traffic or in vehicles. Projects range from a few hundred meters to several kilometers long. In order to perform a reconnaissance survey, a surveying method using a global positioning system (GPS) or a total station has mainly been used. However, these methods have a disadvantage in that a lot of time is required for data acquisition. This study's purpose is to evaluate the usability of a UAV DSM for surveying a construction area. Data was acquired using the UAV and a three-dimensional (3D) laser scanner, and the DSM of the construction site was created through data processing. The UAV DSM showed accuracy to within 30 cm based on the 3D laser scanner data, and a process comparison between the two work methods was able to present the usability of the UAV DSM in the field of construction surveying. Future utilization of the UAV DSM is expected to greatly improve the efficiency of work in construction projects.
Korean Journal of Construction Engineering and Management
/
v.8
no.5
/
pp.142-151
/
2007
The rock excavation work on the sea is planned as underwater process if the elevation of the rock is lower than the M.S.L.(Mean Sea Level). However, in case of West and South sea which are largely different between the rise and fall of the tide, the earth work can be performed on the ground while the work surface is exposed above the sea according to the tide cycle. Thus, it may a good substitute to make up for shortcomings of underwater construction works such as safety problems of workers, loss of efficiency and increasement of construction costs. But the difference between the height of the rock excavation surface and the water surface changed by the tide makes the exposure time of work surface, that is the possible working hours be changed. Also, it may cause the changes of construction cost. Thus, this study analyzes the economical efficiency of the construction method using the difference between the rise and fall of the tide in comparison with the construction method which is performed under the sea, and it also suggests the way to analyze the economical working hours by estimating the possible working hours on the ground. We also try to find out the application possibility of the way like the rock excavation work on the sea using the difference between rise and fall of the tide.
Journal of the Korea Institute of Building Construction
/
v.24
no.1
/
pp.77-86
/
2024
In this study, an evaluation was conducted for a total of 16 conditions to suggest an appropriate construction method for the construction joint of polyurea waterproofing membrane coating. It was analyzed that the longer the construction time difference, the higher the rate of water leaks through joints, and it was confirmed that water leaks could be prevented through primer construction. In addition, since the surface of polyurea exposed outdoors for a long period of time is deteriorated and weakened, it was analyzed that polishing the area increases surface damage and affects the formation of the interface. During maintenance construction, it would be desirable to apply a primer before construction, and it is believed that using the same urea-based material will ensure waterproofing stability.
Proceedings of the Korean Institute of Building Construction Conference
/
2003.05a
/
pp.19-22
/
2003
The purpose of this study is to analyze the curing effect of planar surface heater for concreting in cold weather. Some experiments were conducted to evaluate the temperature history of concrete structures cured with heating sheets. Results are as follows ; (1) The temperature of concrete showed continuously rising trend with the heating by planar surface heater under the cold environmental condition of 3~-12$^{\circ}C$. And after about 24 hours the maximum temperature of concrete was reached at 25~3$0^{\circ}C$. (2) The temperature of slab concrete heated by planar surface heater of 130W/$m^2$ was at least $25^{\circ}C$ higher than that of an exterior air, and the curing performance was much more effective than heating by hot wind machine. (3) Through the curing by planar surface heater for 48 hours, the concrete maturity of about 1.5 times to heating by hot wind machine was acquired.
We can expect reduction of the sunlight absorption quantity to a structure and an earth surface, a decline of the surface temperature and a decline of the heat transport volume in what there is a method I give the sunlight reflectance in the aspect to the surface of the building by painting sunlight high reflectance paint, and to reduce the sunlight absorption quantity to a structure and an earth surface and does so, and, in addition, a method high water retentivity of tree planting and the road surface of the city space uses evaporation latent heat of the water by making it, and to restrain a rise in temperature is thought about. and It is thought that I reduce the sunlight absorption quantity to not only the structure but also other structures and attention gathers to the reflexive reflector reflecting in the direction again and it is wide as a marker of a board and the clothing of the traffic sign and is used the incidence energy from a source of light for this reflexive reflector now by there is it and devises surface structure again, and controlling reflection directivity for the sunlight for the purpose of raising night visibility.
Braced excavation systems are commonly required to ensure stability in construction of basements for shopping malls, underground transportation and other habitation facilities. For excavations in deposits of soft clays or residual soils, stiff retaining wall systems such as diaphragm walls are commonly adopted to restrain the ground movements and wall deflections in order to prevent damage to surrounding buildings and utilities. The ground surface settlement behind the excavation is closely associated with the magnitude of basal heave and the wall deflections and is also greatly influenced by the possible groundwater drawdown caused by potential wall leakage, flow from beneath the wall, flow from perched water and along the wall interface or poor panel connections due to the less satisfactory quality. This paper numerically investigates the influences of excavation geometries, the system stiffness, the soil properties and the groundwater drawdown on ground surface settlement and develops a simplified maximum surface settlement Logarithm Regression model for the maximum ground surface settlement estimation. The settlements estimated by this model compare favorably with a number of published and instrumented records.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.329-330
/
2021
The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1998.10a
/
pp.41-46
/
1998
The purpose of the study was changed of Flood Characteristics in Down stream of Keum River by the Keum River Estuary Dam Construction. The water surface slope of Kuem river after the Keum River Estuary Dam construction was steeper then before. The flood control capacity increase after construction. But, Increasing sediment in Kuem river will be decreased flesh reservoir volume for yield irrigation.
Korean Journal of Computational Design and Engineering
/
v.19
no.2
/
pp.91-102
/
2014
The outer surface of an irregular structure contains panels with two-directional curvature called NURBS. To construct these forms of exterior materials, complex geometric surface should be divided into forms and sizes that can be manufactured and constructed. Because the bigger the curvatures of these divided exterior panel, the more expensive the construction costs, these complex two-directional curvatures should go through optimal process of reinterpretation to minimize the curved surfaces with complex two-directional curvatures. Yet, to gain higher ground in technological competition in the field of irregular structure construction, companies do not share know-how that they obtained. Accordingly, small construction and design companies have trouble calculating even rough estimate and cannot adjust expected construction cost based on comparison of design alternatives. Given this situation, this study conducted the research that can support decision-making in the design stage of the construction and provide basic material for optimal range to reduce manufacturing cost by the minimizing the distorted plane of the irregular structure.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.