Quality control and safety represent increasingly important concerns for project managers. In the worst case, failures may cause personal injuries or fatalities. Accidents during the construction process can similarly result in personal injuries and large costs. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.
Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1479-1484
/
2009
It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.586-590
/
2011
This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.
국내 중소기업에 있어서 21세기 이후 정보 기술(IT) 아웃소싱은 주요 비즈니스 사항으로 자리잡아왔다. 선행연구들은 성공적인 IT아웃소싱의 주요 요인으로서 주로 고객과 공급자 중 한쪽에 치우친 단일 관점에서 논의하여 왔다. 단일 관점은 대리이론에서 제기되는 바처럼 다른 한 쪽이 중요하게 다루는 위험가능성을 배제하는 논리가 된다. 본 연구는 quasi-Delphi방법론으로 고객과 공급자간의 위험에 대하여 잠재적으로 불일치될 수 있는 사항들을 파악하여 아웃소싱 효율성을 높일 수 있는 방안을 찾고자 하였다. 분석 결과, 불일치되는 위험사항은 첫째, 고객은 공급자의 프로젝트 몰입 부족을 그리고 잘못된 공급자선정기준과 프로세스로 나타났다. 두 번째 고객의 입장과는 달리 불분명한 요구사항 및 프로젝트활동에 대한 전문성 부족을 공급업자에게서 나타났다. 고객과 공급자가 프로젝트 위험관리를 협업적으로 인식하고 관리하는 방안에 대하여 결론을 제시한다.
본 연구는 최근 양적, 질적 위상이 높아지고 있는 콘텐츠 프로젝트에 대한 투자 후 관리 성공요인을 탐색적으로 밝힌다. 국내 콘텐츠산업의 프로젝트에서 투자에 대한 의존도는 크다. 이에 따라, 다른 산업과 달리 프로젝트 관리 차원에서 투자자의 역할과 기여도 크다. 본 연구는 국내 콘텐츠 투자에서 핵심적 기능을 하고 있는 벤처투자자들 15명을 대상으로, 그들의 성공 경험에 기초해 콘텐츠 투자 후 관리(프로젝트 관리) 성공요인이 무엇인지 도출한다. 이를 위해 연구 및 실무차원에서 대표적인 기존 10가지 프로젝트 관리영역을 콘텐츠 프로젝트에 맞도록 조작적으로 재정의하고 장르적, 산업적 대표성을 가지며 비교적 투자 영역이 활성화된 영화와 게임에 대한 관리영역별 성공요인을 질적인 방식으로 도출한다. 각 관리 영역별로 적게는 3가지에서 많게는 5가지까지 총 38개의 성공요인을 도출하였다. 연구의 이론적, 실무적 시사점과 연구가 갖는 일정의 한계를 감안하여 향후 연구 방향을 제시한다.
본 연구는 ICT 분야 중소기업을 대상으로 유일하게 융자금을 지원하고 있는 ICT 융자사업 수혜기업을 대상으로 정책융자금에 대한 전반적인 수요조사를 실시하였으며, 특정 수혜기업을 대상으로 융자지원 받은 기술개발과제의 연구배경 및 연구성과, 파급효과, 기대효과, 에피소드 등을 살펴봄으로써 융자금 지원이 실제적으로 얼마나 ICT 중소기업의 기술적 경제적 성과 제고에 도움을 주고 있는가를 보여주고 있다. 실제로 ICT 분야의 중소기업들은 더 많은 규모의 정책융자금을 요구하고 있으며, 안정적인 자금조달이 기술개발 성공의 핵심요인이자 가장 어려운 과제라는 응답결과를 보여주고 있다. 결과적으로, 기술경쟁력을 지닌 ICT 중소기업들의 기술개발 필요자금을 융자해 주고 나아가 개발된 기술을 사업화함으로써 영세한 기업재정의 건전성을 회복할 수 있는 자금지원 정책을 마련할 필요가 있음을 시사해 주고 있다.
This study finds out and suggests success factors for the application of RIMS project through the case study of Seoul Metro and literature survey. The successful application of RIMS needs expert knowledge and concept of BOM, standardization of maintenance planning, check lists of heavy maintenance inspection, organization structure of rolling stock maintenance offices, material management system of warehousing and the process of parts repairing between offices, connection of material ordering system, problem solving of circular spare parts administration among inspection, maintenance, and material organizational units, systemic serial number management of parts with RFID, daily closing diary connected with work process chart, and sufficient period of RIMS's test run. RIMS contributes to real time management of rolling stock maintenance, transparency of management, reliability of train operation, customer satisfaction, and management innovation.
Computer simulation is widely known as a very powerful and practical tool to understand behaviors of considered systems and evaluate design alternatives. However, to use simulation technologies, one should acquire simulation languages, statistics, etc. Also, lots of resources such as time and money are necessary to develop models and analyze statistical data. These obstacles prevent one from adopting simulation tools easily. This paper presents practical guidelines for successful application of simulation. Firstly, we propose how to acquire simulation tools to help one who is going to use simulation techniques. Next guidelines are for introducing simulation software set including simulation and support softwares. Lastly, guidelines for simulation project management are presented.
The 9th International Conference on Construction Engineering and Project Management
/
pp.1240-1240
/
2022
Construction projects are fraught with risks from cost or other overruns to accidents along with other issues. This is true whether the relevant organization is an owner, general contractor, CM, specialty-trade contractor, or other entity. When cost issues or other issues confront arise, how should an organization proceed whether attempting to gain additional compensation in terms of cost/other damages or protecting the same against such claims if they do not appear to be warranted? Enter construction cost forensics. This presentation will focus on strategies/techniques with construction cost forensics in these areas in order to be successful. Covered techniques include those to develop and analyze claims including fundamental construction cost analysis techniques. When an unexpected event disrupts a construction project, using sound analytical methods to identify the cause and quantify the extent of the issue will be important for negotiating a fair result or for obtaining a successful outcome in arbitration or litigation. Key examples of uncovering issues via construction cost forensics will be covered in this presentation.
최근 국가의 경쟁력 확보를 위하여 사회간접자본시설에 대한 투자가 급증하고 있으나, 민간투자사업은 정부의 재정부담 증가, 잘못된 수요 예측 등 여러 측면에서 많은 문제점을 드러내고 있으며, 이러한 문제점들은 결국 민간투자사업의 확대 및 성공적 추진에 걸림돌이 되고 있다. 이러한 환경 속에서 최근의 국내 건설업계는 제한된 공공부문의 턴키와 BTL 사업을 두고 매우 치열한 수주경쟁을 벌이므로써 건설업계의 경영난을 가중시키고 있다. 더욱이, 이러한 경쟁은 업체 간의 건설원가에 대한 가격 경쟁까지 야기시키므로서 BTL사업 시 기본적으로 고려해야 할 원가의 정확한 견적, 업체의 능력, 공기 등 사업의 성공여부를 판가름하는 기본적인 검토사항마저 무시되고 있는 형편이다. 이에 본 연구는 BTL사업의 핵심성공요인과 효율적인 운영방안을 제시함으로서 국내 건설기업이 BTL 사업 참여시 합리적인 전략을 수립하는데 기초적인 자료를 제공코자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.