• Title/Summary/Keyword: Successful Project

Search Result 895, Processing Time 0.026 seconds

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Intraventricular Hemorrhage Long after Successful Encephaloduroarterio Synangiosis in Moyamoya Patient

  • Chung, Moon-Young;Park, Young-Seok;Kim, Dong-Seok;Choi, Joong-Uhn
    • Journal of Korean Neurosurgical Society
    • /
    • v.46 no.3
    • /
    • pp.257-260
    • /
    • 2009
  • Intraventricular hemorrhage long after successful encephaloduroarterio synangiosis (EDAS) is very rare. The effect of revascularization surgery for preventing hemorrhagic event of moyamoya disease remains controversial. We report a 17-year-old female with intracerebral hemorrhage and intraventricular hemorrahge 10 years after successful EDAS. Even though cerebral vessels angiography showed good collateral circulations without specific weak points, a cerebral hemorrhage could occur in patient with ischemic type of moyamoya disease long after successful indirect bypass operations. Good collateralization of cerebral angiography or magnetic resonance perfusion image after indirect bypass surgery would ensure against ischemic symptoms, not a hemorrhage. And, thus a life-time follow-up strategy might be necessary even if a good collateral circulation has been established.

An Empirical Study on the Influence of Environmental, Organizational, IS Characteristics on Successful Implementation of ERP Systems (환경, 조직, 정보시스템 특성이 ERP시스템의 성공적 구축에 미치는 영향에 관한 실증연구)

  • Moon Tae-Soo;Seo Ki-Chul
    • The Journal of Information Systems
    • /
    • v.15 no.1
    • /
    • pp.73-96
    • /
    • 2006
  • Recently, ERP system is used as a important tool of management innovation for enterprise's survival and development. It is very important to recognize how much influence to organizational performance through ERP system implementation. The purpose of this study is to find out the impact of environmental, organizational, information systems characteristics on successful implementation of ERP systems in Korean SMEs(Small and Medium Enterprises). From previous researches on ERP adoption and implementation, 7 independent variables (competitiveness, government support, top management support, process innovation, project management, IS maturity, and ERP customizing), and 1 dependent variables (successful implementation of ERP systems) are identified. 3 questionnaires were removed from the study because of missing or inappropriate responses, and final samples are 91 SMEs. The results of hypothesis testing show that determinants of successful implementation of ERP systems are top management support and IS maturity. Five variables such as competitiveness, government support, process innovation, project management, and ERP customizing do not significantly influence to successful implementation of ERP systems. The contribution of this study is that it provides an empirical evidence of the causal relationship between ERP adoption factor and ERP success. This study showed that top management support and IS maturity are essential to accomplish successful ERP implementation for SMEs.

  • PDF

The Comparative Evaluations of the Factor Weights for a Successful Sea-ranching Project based on AHP (AHP 기법을 이용한 바다목장화사업 성공요인에 대한 비교평가연구)

  • Park, Cheol-Hyung;Pyoh, Hee-Dong
    • The Journal of Fisheries Business Administration
    • /
    • v.38 no.3
    • /
    • pp.67-88
    • /
    • 2007
  • This study is to estimate the factor weights for a successful sea-ranching project using the Analytical Hierarchy Process. Furthermore, it investigates the policy implications revealed by the differences in group opinions throughout fishermen, government officials, researchers and the scholars when the weights are assessed. The hierarchy is constructed for the 3 levels of factors which must be evaluated for a successful sea-ranching project. The top level of factors is divided by the ecological factors and the socioeconomic factors. As the middle level of factors, there are 3 factors such as the choice of fish, the habitat environment and the production technology under the ecological factors and another 3 factors such as the stability of fishery society, economic factors, and the law & system under the socio-economic factors. And then, at the bottom level of the hierarchy, the economic factors have two different sub-factors such as the fishing revenue and cost. The law & system has also 3 sub-factors such as the accessibility to sea-ranching area, fishing method, and surveillance. The fishermen and government officials show us quite opposite tendencies in assessments of the weights while both the researchers and scholars reveal almost the same opinions positioned at somewhere between first two groups. The study also reports the evaluations of efficiency measures for resource recovery methods among the sea-ranching project, artificial reef, release of fish seeds, and marine protection area. Both the sea-ranching project and marine protection area have the same efficiency in terms of resource recovery while the artificial reef and release of fish seeds are revealed as somewhat less efficient methods comparing to the former two methods.

  • PDF

Differences in the Perceptions of PMs and PMOs on the Importance of the Role of PMO (PMO의 제반 역할의 중요성에 대한 PM과 PMO의 인식 차이)

  • Yoon, Tae-Ho;Choi, Sung-Wook;Kim, Soo-Yeon;Kim, Daecheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.207-213
    • /
    • 2021
  • Recently, the number and scale of projects being carried out within the enterprise are increasing. Accordingly, many companies are competitively introducing a Project Management Office (PMO) to efficiently manage these projects, allocate resources, and effectively link the projects and corporate strategies. However, the project manager who directly manages the project wants to receive support from the PMO in many areas for successful project management, but the project manager does not like to be interfered with by the PMO. On the other hand, the PMO may not be able to satisfy all the requirements of each PM as PMO oversees the entire project with limited resources. In addition, since the PMO must monitor and control the project and support the project according to the priorities of each project, conflicts with each PM can be formed. Therefore, in this study, based on the case of a company, the difference between the perceptions of PMs and PMOs about the importance of the required roles of PMOs is to be examined. As a result of the study, it was confirmed that the core functions and sub-functions of PMO, which PMO members and PMs consider important, are different. It was identified that the PMs valued the PMO function that would be helpful for their successful project execution. On the other hand, PMO members revealed that they had a relatively high priority for the roles to monitor and control project performance for which they were directly responsible.

The Successful Factors of Rural Community Development Project -Focusing on the Implementation System of New Rural Vitalization Plus Project- (농촌 지역개발사업의 성공 요인 -농촌신활력플러스 사업 추진체계를 중심으로-)

  • Jang, Eunmie;Lee, Minsoo;Park, Duk-Byeong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.28 no.3
    • /
    • pp.137-151
    • /
    • 2021
  • The study aims to explore the success factors focus on the system for implementing the New Rural Vitalization Plus Project (NRVPP). It offers recommendations to bring the success of the community development projects and support the strategies in political and practical. Conclusions and recommendations for improving the practice of implementation are based on the results of the in-depth interview with 9 developers and experts joining the NRVPP. Findings show that the promotion team as the NGO for the community development project used the collaboration and cooperation network to progress for the success of the project although they suffered the political, legal, and institutional problems hindering the normal function of each promotion entity in municipalities. The implications of the study were presented in the conclusion section.

IT 프로젝트 관리자의 리더십 유형별 역량이 프로젝트 성과에 미치는 영향

  • Kim, Hwa-Yeong;Gang, So-Ra
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.96-101
    • /
    • 2007
  • This study has examined the project managers' competency and suggests three competency factors, which are technical, human, and conceptual skills, for the success of IT projects. The study suggests that IT project managers should master three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of IT projects. Especially this study has examined the effect of the fit between project managers' competency and leadership style on the performance of IT projects.

  • PDF

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.