• 제목/요약/키워드: Successful Construction

검색결과 858건 처리시간 0.029초

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

건설자재의 적정 리드타임 산정에 관한 연구 (A Study on Optimal Lead Time Selection Measures of the Construction Materials)

  • 이상범
    • 한국건축시공학회지
    • /
    • 제4권1호
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

NON-VALUE ADDING ACTIVITIES IN SOUTH AFRICAN CONSTRUCTION: A RESEARCH AGENDA

  • Fidelis Emuze;John Smallwood
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.453-458
    • /
    • 2011
  • The construction industry's importance to nation building, economic empowerment, and contributions to global commerce cannot be over emphasised. However, poor productivity, accidents, rework, time and cost overruns, and client dissatisfaction have characterised the industry performance in a multi-dimensional way. The central issue in this particular research is the seemingly inadequate achievement of optimum performance in the construction process, either with respect to value for money for the client and the entire construction supply chain or value in terms of the utility derived from built assets in spite of efforts by government and governmental bodies such as the Construction Industry Development Board (cidb) to increase industry performance. Therefore, based upon an extensive review of related literature, the paper reports on effects and causes of non-value adding activities in the construction industry in general, and South African construction in particular. The research findings indicate that activities that can be referred to as non-value activities are not only prevalent, but they can also be held responsible for performance related issues in terms of cost, time, quality and health and safety (H&S) in construction; and the exploration of pluralism in the research methodology may result in a robust model based upon the system dynamics approach. Therefore, the study suggests that there is major scope for value optimisation in the construction process especially in terms of availability and implementation of interventions, which have not only proven successful in other industries, but are also adaptable in the construction industry context.

  • PDF

공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 - (A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project -)

  • 심구식;김성만;안재홍
    • 한국BIM학회 논문집
    • /
    • 제3권2호
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

u-City서비스.기술.기반시설의 연계성 확보방안 (Study on the Relationship Establishment among u-City Service, Technology and Infrastructure)

  • 조춘만;김정훈
    • Spatial Information Research
    • /
    • 제17권3호
    • /
    • pp.287-299
    • /
    • 2009
  • U-City의 계획, 건설 및 개발 후 운영 관리를 지원하기 위한 "유비쿼터스도시의건설등에관한법률(이하 u-City 법) 이 제정 공포되었다(2008.3.28). 본 법률을 근거로 한 국가주도 u-City도입의 궁극적 목표는 이미 선진국 궤도에 근접한 우리나라의 IT, 공간정보인프라를 적극 활용한 도시공간 이용 및 관리의 첨단화에 있다고 하겠다. 법에 의한 u-City의 정의는 물리적 도시기반시설에 u-City기술을 적용하여 u-City기반시설 화하고 이를 통해 다양한 u-City서비스를 제공하는 도시로 규정되어 있다. 그러나 현 법규정의 가장 핵심개념에 해당하는 u-City서비스, 기술 및 기반시설과 이들의 상호관계의 상세 정도로는 각 지자체의 특성과 역량에 맞는 도시기반시설지능화 및 이를 통한 u-City서비스 제공 등의 가이드 효과를 충분히 기대하기 어려운 실정이다. 따라서 본 연구의 목적은 안정적이고 만족도 높은 u-City서비스의 계획, 구축 및 운영관리를 위한 법제도 정비의 핵심사안의 하나로서 서비스-기술-기반시설간 상호관계 정립의 기본방향 및 추진전략을 제시하는데 있다.

  • PDF

DEVELOPMENT OF IDEA HIERARCHY MODEL FOR IDEA GENERATION OF CONSTRUCTION VE

  • Jinkook Yang;Sungwoo Moon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.504-509
    • /
    • 2011
  • Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.

  • PDF

효율적인 건설자동화 기술 개발을 위한 핵심성공요인 (Critical Success Factors for Efficient Development of Construction Automation Technology)

  • 이웅균;김백중;김태훈
    • 대한건축학회연합논문집
    • /
    • 제21권6호
    • /
    • pp.1-6
    • /
    • 2019
  • Construction automation can be an effective alternative for the lack of skilled labor and loss of productivity. With such a background, Korean government has provided a lot of financial supports for the development of construction automation technology. However, despite of those efforts, automation systems at construction sites have rarely been employed. This is because the systems have not been developed with full consideration of the needs and environments on construction sites. Thus, the purpose of this study is to identify the critical success factors for efficient development of construction automation systems. This study compares and analyzes key factors for automated construction system(ACS) and construction information system(CIS). As a result, 'stability and reliability' in the ACS showed the highest importance while 'manageability' in the CIS was. Consequently, for the successful introduction of the ACS, technical capability and stability should be firstly considered to cope with dynamic construction environment, while the CIS should be built to enable efficient management and use of information. The result of this study can serve as an evaluation base for the current construction automation technologies and an index for more efficient technology development in the future as well.

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF