Journal of Construction Engineering and Project Management
/
v.6
no.4
/
pp.24-34
/
2016
Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.
Journal of Construction Engineering and Project Management
/
v.6
no.4
/
pp.1-6
/
2016
Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.51-52
/
2021
The maintenance of educational facilities is divided into inspection and management of facility managers residing in the school and Educational Environment Improvement Projects(EEIP) to carry out maintenance work. Educational support organizations collect maintenance requests through facility inspections by school-specific facility managers, and carry out numerous maintenance projects during the year. The EEIP has the characteristic of Program Management with interrelationships between projects, not multiple projects management. The purpose of the EEIP is to eliminate the inconvenience of school facility users and increase their satisfaction, and achieving the goal is judged to be successful. Despite the importance of management and performance measurement utilizing Critical Success Factor(CSF) for the operation of successful educational facility maintenance management programs, the system for achieving the goals is insufficient. This study derives CSFs for each stage of the EEIP for the success of the EEIP. The CSFs for each stage of the EEIP is expected to serve as a basis for evaluation of educational facility maintenance management programs and can be used as an evaluation index in the future.
Journal of Korean Society of Industrial and Systems Engineering
/
v.46
no.3
/
pp.221-230
/
2023
Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..
In the beginning of new millennium, Business-to-Business(B2B) Electronic Commerce(EC) is a hot issues of the world business and economic communities. The market of B2B EC is increasing rapidly, and become a more complex and competitive because many participants and intermediaries are play on their own objectives and strategies. To cope with the situation, participants of B2B EC market should make play with a competitive strategies. So, the participant enterprises must know the critical success factors of their own EC market. This study identifies B2B EC success factor measurement sets, and explores several success factors based on the perceived importance of B2B EC practitioner in the manufacturing enterprises. The study tests the differences of success factors by IS level, EC business model characteristics, and EC introduction and operating characteristics.
Finding the factors to affect the success of the business web sites is critical to enhance their competitiveness. This paper categorizes these factors into 4 quality measures: system, information, service and entertainment. The success is measured via user's satisfaction and loyalty. It surveys 474 Internet users to explore the effect of the quality measures on web site success. We confirm the causal effect of quality factors on users' satisfaction and loyalty. Furthermore, a comparative study is performed for web site types, such as finance, e-commerce(shopping mall), and entertainment. We note that the effect differs in web site types.
The purpose of this thesis is to analyze the success factors of ERP system in corporations and to know what is different in the factors depending on organizational culture and size. Considering there are various results from introduction of the same information technology(IT), it is implied that organizational characteristics make a difference. In this thesis we did factor analysis and multiple regression about the factors based on the previous studies and analyzed the priorities depending on organizational culture and size. The results show that mechanistic organization has key success factors of work process change, project team abilities, and determination of CEO while organic organization has those of work process change and project team abilities. Plus bigger sized organization has success factors of work process change, project team abilities, and determination of CEO while small sized organization has those of work process change and project team abilities.
Organizations in some industries are still hesitant to adopt the Enterprise Resource Planning (ERP) system due to its high risk of failures. This study examined how industry classification affects the successful implementation of the ERP system. To achieve this goal, we reinvestigated the existing ERP Success Model that was developed by Chung with the data from various industry sectors, since Chung validated the model only in the engineering and construction industries. In order to test to see if the Chung model can be applicable outside the engineering and construction industries, the relationships between the ERP success indicators and the critical success factors in the Chung model and those in the sample data collected from ten different industry sectors were compared and investigated. The ten industry sectors were selected based on the Global Industry Classification Standard (GICS). We found that the impact of success factors on the success of implementing an ERP system varied across industry sectors. This means that the success of ERP system implementation can be industry-specific. Thus, industry classification should be considered as another factor to help IT decision makers or top-management avoid ERP system failures when they plan to implement a new ERP system.
Journal of the Korea Society of Computer and Information
/
v.21
no.12
/
pp.165-171
/
2016
This study analyzes the relative importance of the introducing factors for the critical success factors in the implementation stage of the lifecycle of ERP system using Delphi technique and Analytic Hierarchy Process(AHP). In the 1st layer of the hierarchy, technical factor is evaluated as the most important factor among organizational, technical, and supplier factors. In the 2nd layer, choosing a proper ERP package is evaluated as the most important factor within 15 factors followed by process-oriented approach, technical suitability, minimized customization, integration and association of system with trading parter, association with legacy systems, and support and involvement of top management. As a result of this analysis enterprise should choose an ERP package that is suitable to its business environment, and make the best use of(take full advantage of) best practice that ERP package provides to optimize the existing business procedure or process(to approach the existing business procedure or process). This study also shows the range of customization of the features provided by the ERP package should be minimized.
A total of 636 patients of primary infertility were analyzed by computer on the basis of statistical evaluation of etiological factors and therapy with the outcome of the pregnancy. In this report, it included the results of the study analyzed the single etioligic factors responsible for the primary infertility with the outcome of the pregnancy. 1. Two hundred and fourty one patients out of a total 636(37.9%) achieved pregnancy. 2. Four hundred and fifty nine patients out of a total 636(72%) had a single etuiologic factor responsible for the primary infertility. 3. One hundred and seventy six patients out of 459 parients (38.3%) who had a single etiologic factor responsible for the primary infertility achieved a pregnancy. 4. The endometriosis was the most frequent responsible factor for the primary infertility. 5. The success rate of the pregnancy was different in each etioligic factor responsible for the primary infertility. The highest success rate of the pregnancy was in the patients who had the intermediate factor responsible for the primary infertility as much as 66.7% of the patients. 6. The expectancy of the pregnancy in terms of the duration of the therapy and the follow-up was variable and depended upon the etiologic factor of the primary infertility.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.