• Title/Summary/Keyword: Standard control procedure

Search Result 266, Processing Time 0.026 seconds

A Study on Qualification Procedures of Flight Control Software on Military Aircraft (군용항공기 비행제어 소프트웨어 품질인증 절차에 관한 연구)

  • Heo, Jin-Goo
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.433-441
    • /
    • 2013
  • Purpose: This study investigates software qualification procedures based on the FA-50 flight control software to satisfy high reliability and flight safety. Methods: We studied software qualification categories, standard/specification and developed country case. We proposed procedure to satisfy not only flight safety but also international standard. Results: The proposed software qualification procedure satisfied flight safety and airworthiness based on the testing result of the FA-50 flight control software. Conclusion: This paper showed an appropriate qualification procedures of the flight control software in domestic circumstance through the FA-50 flight control software qualification.

Limitations and improvement of the in situ measurements of ground thermal conductivity in Korea (국내 지중열전도도 측정 방법의 한계 및 개선 방향)

  • Shim, Byoung Ohan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.195.2-195.2
    • /
    • 2011
  • The borehole heat exchanger of Geothermal Heat Pump (GHP) system should be sustainable and cost effective for long term operation. To guaranty the performance of the system thermal Response Tests (TRTs) with simple recommended procedures have been applied in many countries. Korea government developed a standard TRT procedure in order to control the quality on GHP projects. In the TRT procedure interpretation method has a rule that data set has to be interpreted by the line source model(LSM). The LSM employes some assumptions that surrounding medium is homogeneous and the line source is infinite and constant heat flux, however real ground condition is unisotropic and heterogeneous, and showing regional or local ground water flows in many cases. We need to develope improved evaluation models to estimate accurate ground thermal conductivity with respect to geological and influence of ground water because current TRT standard test procedure has limitations to be applied for every locations and system. This study surveyed the uncertainty of the thermal parameters from the interpretation method considering different evaluation period. The interpretation of 208 TRT data sets represents limitations of LSM application that some obtained ground thermal conductivities are statistically unstable and convergence time of ground thermal conductivity over test period shows trends responding the length of test period. This evaluation study will be helpful to provide some effective procedure for the thermal parameter estimation and to complement current TRT standard procedure.

  • PDF

Comparison and Evaluation of Performance for Standard Control Limits and Bootstrap Percentile Control Limits in $\bar{x}$ Control Chart ($\bar{x}$ 관리도의 표준관리한계와 부트스트랩 백분률 관리한계의 수행도 비교평가)

  • 송서일;이만웅
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.52
    • /
    • pp.347-354
    • /
    • 1999
  • Statistical Process Control(SPC) which uses control charts is widely used to inspect and improve manufacturing process as a effective method. A parametric method is the most common in statistical process control. Shewhart chart was made under the assumption that measurements are independent and normal distribution. In practice, this assumption is often excluded, for example, in case of (equation omitted) chart, when the subgroup sample is small or correlation, it happens that measured data have bias or rejection of the normality test. A bootstrap method can be used in such a situation, which is calculated by resampling procedure without pre-distribution assumption. In this study, applying bootstrap percentile method to (equation omitted) chart, it is compared and evaluated standard process control limit with bootstrap percentile control limit. Also, under the normal and non-normal distributions, where parameter is 0.5, using computer simulation, it is compared standard parametric with bootstrap method which is used to decide process control limits in process quality.

  • PDF

The development standard research for railway safety software (철도 안전 소프트웨어를 위한 개발 기준 연구)

  • Lee, Young-Jun;Kim, Jang-Yoel;Cha, Kyung-Ho;Cheon, Se-Woo;Lee, Jang-Soo;Kwon, Ki-Choon;Jung, Ui-Jin
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.968-973
    • /
    • 2007
  • The systems such as the railway control system, satellite control system and nuclear power plant control system are the safety critical systems because the failure of them could lead to risk significant events. These softwares of digital systems must follow the life cycle process from the beginning of software development to guarantee their safety and reliability. The NRC(Nuclear Regulatory Commission) Reg Guide of nuclear fields, the RTCA/DO-178B standard which is used to acquire the certification for software in industrial aero field in European Union and United State, the DEF STAN 00-55 standard for the safety of electronic weapon in England, the IEC 601-1-4 for medical equipment and the IEC 62279 for railway system recommended the development life cycle. This paper introduces the development process and compares each other. Also it indicates applicable development criteria for the software of systems related to railway fields and describes the detailed procedure of development criteria. We describe the procedure to make the software development criteria in nuclear filed. For the software development related to railways, the process from plan phase to maintenance phase must be satisfied. The safety and reliability is guaranteed through these standards.

  • PDF

Process Development of a Standard Operating Procedure (SOP) for the Manufacturing of Standardized Distribution Boards (규격화된 분전반 제작을 위한 표준작업절차(SOP)의 공정 개발)

  • Ko, Wan-Su;Lee, Byung-Seol;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.21-27
    • /
    • 2018
  • The purpose of this study is to develop a SOP (Standard Operating Procedure) for a distribution board that can monitor the leakage current of a load distribution line in real time. The developed distribution board was fabricated by applying IEC 61439-1. It consists of the distribution board and an alarm device. The work process for making the distribution board was compliant with the KEMC (Korea Electrical Manufacturers Cooperative) regulations. And the AC distribution board range is 1,000 V. In addition, the voltage in DC is less than 1500 V. The distribution board receives a 3-phases and 4-wires power supply system and can supply power to the load of a maximum of 32 single or three phase distribution circuits. Also, leakage current measured on the power distribution board was used by sensors installed. The SOP of the developed distribution board consists of the installation standards for the short circuit alarm device and sensor, the surge protection device, switches and indication lamps, and other devices. The operation procedure was prepared so that each manufacturing step of the distribution board must be confirmed by the persons in charge of preparation, production, quality control and approval before moving forward to the next step.

Quality Assurance and Quality Control method for Volatile Organic Compounds measured in the Photochemical Assessment Monitoring Station (광화학측정망에서 측정한 휘발성유기화합물의 정도관리 방법)

  • Shin, Hye-Jung;Kim, Jong-Choon;Kim, Yong-Pyo
    • Particle and aerosol research
    • /
    • v.7 no.1
    • /
    • pp.31-44
    • /
    • 2011
  • The hourly volatile organic compounds(VOCs) concentrations between 2005 and 2008 at Bulgwang photochemical assessment monitoring station were investigated to establish a method for quality assurance and quality control(QA/QC) procedure. Systematic error, erratic error, and random error, which was manifested by outlier and highly fluctuated data, were checked and removed. About 17.3% of the raw data were excluded according to the proposed QA/QC procedure. After QA/QC, relative standard deviation for representing 15 species concentrations decreased from 94.7-548.0% to 63.4-125.8%, implying the QA/QC procedure is proper. For further evaluation about the adequacy of QA/QC procedure, principal components analysis(PCA) was carried out. When the data after QA/QC procedure was used for PCA, the extracted principal components were different from the result from the raw data and could logically explain the major emission sources(gasoline vapor, vehicle exhaust, and solvent usage). The QA/QC procedure based on the concept of errors is inferred to proper to be applied on VOCs. However, an additional QA/QC step considering the relationship between species in the atmosphere needs to be further considered.

Development of a Supporting Program for the Emergency Preparedness Plan (사고대비물질 취급자의 비상대응계획 작성 프로그램 연구)

  • Kim, Sung-Bum;Noh, Hye-Ran;Seok, Gwang-Seol;Park, Jae-Deuk
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.5
    • /
    • pp.54-58
    • /
    • 2011
  • Emergency preparedness plan(EPP) is the systematic management of activities that involve a material degree of risk of loss or other damage to the surroundings(people, property and environment), and the boundary of accident recovery plan(ARP). The main purpose of the program is to provide a safety management system to each facility in order to enable to prevent accident and to control accident immediately. The EPP includes not only typical safety-related documentations such as material safety data sheet(MSDS), standard operation procedure(SOP), emergency response plan(ERP). EPP is established basis of the preliminary safety analysis involving risk identification, assessment and prevention plans. The program is also helpful for government or related agencies to control a number of accidents in small-scale companies in the whole country.

Robust model matching design using normalized left coprime factorization approach

  • Hanajima, Naohiko;Eisaka, Toshio;Yanagita, Yoshiho;Tsuchiya, Takeshi;Tagawa, Ryozaburo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10b
    • /
    • pp.360-365
    • /
    • 1993
  • In this paper, we propose a new design procedure of the Robust Model Matching(RM) using the Normalized Left Coprime Factorization (NLCF) approach. The RMM aims at reducing the sensitivity of a given control system, but standard design procedures are not for robust stability. Therefore we try applying the robust stability condition based on NLCF to RMM procedure. We first formulate the RMM using the robust stability condition of NLCF approach, then we propose the new procedure of the RMM. The point is that the condition includes the measure of sensitivity of the RMM. In the proposed procedure, a cost function is determined through the condition and solved by H$_{\infty}$ contro technique. Finally we show a design example and check the performance..

  • PDF

EVALUATION OF VEHICLE DYNAMIC CONTROL FOR ROLOVER PREVENTION

  • Ungoren, A.Y.;Peng, H.
    • International Journal of Automotive Technology
    • /
    • v.5 no.2
    • /
    • pp.115-122
    • /
    • 2004
  • Evaluation of active safety control systems usually relies heavily on field testing and is time-consuming and costly. Advances in computer simulations make it possible to perform exhaustive design trials and evaluations before field testing, and promise to dramatically reduce development cost and cycle time. In this paper, a comprehensive simulation-based evaluation procedure is proposed, which combines standard evaluation maneuvers, worst-case techniques, and a driver model for closed-loop path following evaluations. A vehicle dynamic controller (VDC) for a popular Sport Utility Vehicle is evaluated using the proposed procedure. Simulation results show that the proposed procedure can be used to assess the performance of the VDC under various conditions and provides valuable information for the re-design of the VDC.

Development of Standard Calibration System for the Rain Gauges by Weighting Method (질량측정에 의한 우량계 표준교정시스템 개발)

  • Shin Gang-Wook;Hong Sung-Tack
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.8
    • /
    • pp.818-823
    • /
    • 2006
  • Because the rain gauges of tipping bucket type can easily use the digital signal, the rain gauges are widely used for the meteorological observation. In general, the resolution of rain gauges of tipping bucket type can be categorized by the 0.1mm, 0.5mm, and 1.0mm classes. But, the error of the tipping bucket rain gauges is made by the intensity of rainfalls and is expected to make the standard calibration method for error measurement. Thus, we developed the hardware of standard calibration facility for rain gauges by weighting measurement method and proposed the standard procedure by rainfall intensity in this study Also, we calculated the uncertainty for the rainfall intensity and obtained useful result through the proposed calibration method.