• Title/Summary/Keyword: Standard Specification in Building Construction

Search Result 53, Processing Time 0.023 seconds

Hydrostatic Pressure Resistance Performance Testing of Cement Mixed Siliceous Powder Waterproofing Coationgs (규산질계 분말형 도포방수재의 내투수성 성능평가 연구)

  • Park, So-Young;Kwon, Si-Won;Kim, Soo-Yeon;Kim, Byong-il;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.31-32
    • /
    • 2018
  • Lately, cement mixed siliceous powder waterproofing coating has been used as a waterproofing material in the wet environment condition of an underground concrete structure. Underground is exposed to environmental influences such as pressure of ground water, pressure of soil. However, the quality standard for pressure (water pressure, earth pressure) is not specified in the specification of the cement mixed siliceous powder waterproofing coating. Therefore, in this study, the permeability test was carried out based on the assumption that the durability should be verified in consideration of the environmental aspects of the material in actual field. As a result of the test, the permeability was generated from the inorganic single type material, but it was caused by the sealing failure and the test error, and the permeability was not generated in most of the materials. The results of this study will be analyzed by reviewing the physical properties of the material, and the research direction will be resumed.

  • PDF

Concrete Specification and Mixing Design for the Reduction of Slab Defects in Underground Parking Lot (지하주차장 슬래브 하자 저감을 위한 콘크리트 규격 및 배합설계)

  • Kim, Han-Sic;Ha, Jung-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.235-236
    • /
    • 2023
  • Concrete surfaces have weak surface strength due to bleeding and laitance, and problems such as peeling, cracking, and cracking may occur. In particular, underground parking lots can be said to be more vulnerable to peeling, breaking, and cracking if excessive loading of materials and equipment movement are not managed at the initial age after placing of concrete. Cracks, peeling, and cracking problems in slab concrete in underground parking lots of apartments can lead to leakage problems and affect finishing materials constructed on top of topping concrete, reducing the performance required for waterproof materials. Therefore, in this study, the bleeding and surface strength according to the standard of topping concrete and the use of admixture were reviewed to solve the crack, peeling, and cracking problems among the types of defects in underground parking lot slab concrete. As a result, it was derived that the optimal concrete compressive strength is 30MPa or more, and it is a reasonable performance design method to prohibit the substitution of admixtures.

  • PDF

Period of the Strength Correction of the Concrete with the Temperature Level Based on Meteorological Data (기상자료를 이용한 콘크리트의 단계별 기온보정강도 적응기간 산정)

  • Han, Min-Cheol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.107-112
    • /
    • 2008
  • According to Korean Architectural Standard Specification (KASS) , at the design stage of the specified concrete strength, strength correction with each temperature level should be considered to secure required strength at 28 days even in low temperature condition, In this paper, the period for the strength correction at the stage of mixture design of the concrete using ordinary Portland cement(OPC) specified in KASS was determined with each region of south Korea based on the meteorological data of KMA(Korea meteorological administration) by applying KASS-5 regulation. In case of 28 days of strength control age, the period for strength correction with 6MPa was calculated to $50{\sim}60$ days and, with 3 MPa. to around 80 days. The period for the strength correction was shown to be decreased with the rise of altitude. The period to consider the delay of the strength development due to low temperature including the period of cold weather concrete was nearly 7 months around 1 year. References for determining the strength correction factors with each region of south Korea was provided in this paper. Further investigation of strength correction of the concrete containing blended cement is to studied.

A Study on the Lime of Government Constructions Based on the Analysis of Construction Reports in the Late of Joseon Dynasty(17~19c) - Emphasized on the production, provision, and application of lime - (산릉(山陵).영건의궤(營建儀軌) 분석을 통한 조선후기 관영 건축공사의 석회에 관한 연구 - 석회의 생산.조달.적용을 중심으로 -)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.18 no.6
    • /
    • pp.23-46
    • /
    • 2009
  • The history to have used lime in building construction was much long without distinction of the East or the West. The ancient nations of korean peninsula had used lime as construction material. The witness was discovered in the kings' tombs of fifth century. In the Joseon dynasty(15~19c), what applied several developed lime compounds to the kings' tombs have been recorded in 'Sanleong-Uigwe(山陵儀軌)' & 'Yeonggeon-Uigwe(營建儀軌)' of those days documents. Therefore, this paper is to examine the whole procedures from the product and provision of lime to its application through those days documents. Following conclusions have been reached through the study. Three lime compounds to be developed for the kings' tombs was extendedly applied to residential government buildings step by step within the current of time. These compounds to be used in the kings' tombs of the Joseon dynasty had been correlated to those of the ancient nations, which were nations of korean peninsula in narrow range, chinese and orient nations in broad range. These compounds have possibilities of development as the environmental-friendly building material. And these compounds should provide a standard specification for conservation & restoration of the traditional and cultural properties. I could confirm that the whole procedures had not been developed within limited space-time of the specified nation & period, but within interactions of the nations & periods. In the periods which disturb its interaction, the expansion of productivity in building construction was interfered.

  • PDF

BIM-Based Generation of Free-form Building Panelization Model (BIM 기반 비정형 건축물 패널화 모델 생성 방법에 관한 연구)

  • Kim, Yang-Gil;Lee, Yun-Gu;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.19-31
    • /
    • 2022
  • With the development of 3D-based CAD (Computer Aided Design), attempts at freeform building design have expanded to small and medium-sized buildings in Korea. However, a standardized system for continuous utilization of shape data and BIM conversion process implemented with 3D-based NURBS is still immature. Without accurate review and management throughout the Freeform building project, interference between members occurs and the cost of the project increases. This is very detrimental to the project. To solve this problem, we proposed a continuous utilization process of 3D shape information based on BIM parameters. Our process includes algorithms such as Auto Split, Panel Optimization, Excel extraction based on shape information, BIM modeling through Adaptive Component, and BIM model utilization method using ID Code. The optimal cutting reference point was calculated and the optimal material specification was derived using the Panel Optimization algorithm. With the Adaptive Component design methodology, a BIM model conforming to the standard cross-section details and specifications was uniformly established. The automatic BIM conversion algorithm of shape data through Excel extraction created a BIM model without omission of data based on the optimized panel cutting reference point and cutting line. Finally, we analyzed how to use the BIM model built for automatic conversion. As a result of the analysis, in addition to the BIM utilization plan in the general construction stage such as visualization, interference review, quantity calculation, and construction simulation, an individual management plan for the unit panel was derived through ID data input. This study suggested an improvement process by linking the existing research on atypical panel optimization and the study of parameter-based BIM information management method. And it showed that it can solve the problems of existing Freeform building project.

The Improvement of Tunnel Construction Cost Standards Considering the Site Conditions in Korea (현장실태를 고려한 국내 터널공사 공사비산정기준 개선)

  • Ahn, Bang-Ryul;Lee, Han-Soo;Oh, Jae-Hoon;Song, Tae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.26-35
    • /
    • 2020
  • Tunnel construction is an important part of Korean public construction projects. Although the development of various equipment and technologies has led to advances in tunnel construction methods that are implemented on sites, the cost standards related to such works do not yet reflect the realities of the construction sites. A literature review and site surveys were conducted to suggest reasonable cost standards for tunnel work that reflects the realities of the field. First, each item in the cost standards for tunnel work, as established in the Construction Standard Production Rates, were analyzed. The results were compared with the actual costs implemented on tunnel projects. The key items analyzed included those regarding the work cycle time, such as rock classification, profiling survey, drilling speed, and muck-disposal processing equipment combination, as well as the number of people put to tunneling work. Based on the site survey results, improved estimates regarding the cycle time per one tunnel drilling blast, drilling speed of the machine, muck disposal processing equipment combination, and the number of people put to tunneling work were suggested. This study suggests the cost standards that reflect the realities of tunneling sites. The results are expected to help ensure adequate costs for tunnel construction projects.

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.

FACTOR ANALYSIS ON CONTRACTOR COMPETITION STRATEGY: A HONG KONG STUDY

  • L. Y. Shen;Y. T. Tan;S C Song;M X Yu
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.289-298
    • /
    • 2007
  • The development of construction industry has led to the increase in the number of criteria imposed by project clients for selecting contractors. For example, clients often request tenderers to satisfy various conditions such as tight programme, financial strength, managerial ability, relevant work experiences, technical strength, high workmanship standard, safety requirement, quality specification, and yet others. This trend has attracted research interests of devising various methods for helping project clients to assess contractors' bids. For example, in recent development, the Works Bureau of the Hong Kong Government has introduced two mechanisms in tender evaluation for various public work contracts, namely, the Marking Scheme effective from June 2002 and the Formula Approach effective from November 2002 [1], [2]. These approaches evaluate a contractor's tender by considering collectively its tender price and performance attributes, the latter including contractor experience, past performance, technical resources and technical content of his proposal. The tender with the highest combined price and performance score (CPPS) will be normally recommended for acceptance. It appears, however, that there is little existing research in helping contractors to identify a competition strategy that enables the contractor to offer his most competitive bid collectively taking into account his resource capacities and project client's multiple performance criteria. This paper examines the factors affecting contractor's competition strategy to compete for works in Hong Kong. The understanding about the factors will contribute to identifying effective competition strategy. The data used for the analysis were collected from Hong Kong construction industry. The research findings may provide valuable references for investigating effective competition strategies in other construction industries outside the region.

  • PDF

Performance Evaluation of Bridge Deck Materials based on Ordinary Portland Cement Concrete (보통 포틀랜드 콘크리트 기반 교면포장 재료 성능 평가)

  • Nam, Jeong-Hee;Jeon, Seong Il;Kwon, Soo Ahn
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.129-137
    • /
    • 2017
  • PURPOSES : The purpose of this study is to develop bridge deck concrete materials based on ordinary Portland cement concrete, and to evaluate the applicability of the developed materials through material properties tests. METHODS : For field implementation, raw material (cement, fine aggregate, and coarse aggregate) properties, fresh concrete properties (slump and air content), strength (compressive, flexural and bond strength) gain, and durability (freeze-thaw resistance, scaling resistance, and rapid chloride penetrating resistance) performance were evaluated in the laboratory. RESULTS : For the selected binder content of $410kg/m^3$, W/B = 0.42, and S/a = 0.48, the following material performance results were obtained. Considering the capacity of the deck finisher, a minimum slump of 150 mm was required. At least 6 % of air content was obtained to resist freeze-thaw damage. In terms of strength, 51.28 MPa of compressive strength, 7.41 MPa of flexural strength, and 2.56 MPa of bond strength at 28 days after construction were obtained. A total of 94.9 % of the relative dynamic modulus of elasticity after 300 cycles of freeze-thaw resistance testing and $0.0056kg/m^2$ of weight loss in a scaling resistance test were measured. However, in a chloride ion penetration resistance test, the result of 3,356 Coulomb, which exceeds the threshold value of the standard specification (1000 Coulomb at 56 days) was observed. CONCLUSIONS : Instead of using high-performance modified bridge deck materials such as latex or silica fume, we developed an optimum mix design based on ordinary Portland cement concrete. A test construction was carried out at ramp bridge B (bridge length = 111 m) in Gim Jai City. Immediately after the concrete was poured, the curing compound was applied, and then wet mat curing was applied for 28 days. Considering the fact that cracks did not occur during the monitoring period, the applicability of the developed material is considered to be high.

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.