• Title/Summary/Keyword: Standard Production Unit System

Search Result 48, Processing Time 0.027 seconds

An Analysis on the Influence Factors relative to Reliability of Standard Production Unit System (표준품셈의 신뢰성에 대한 영향요인 분석)

  • Kim, Yong-Woo;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.187-189
    • /
    • 2011
  • Standard production unit system has been used as accumulated standard for the cost estimation of public construction projects. However, it is difficult to estimate reasonable cost due to adaptation of a uniform standard and reflect changes in the technology. The purpose of this study is to provide basic data for improvement of standard production unit system through the identifying problems and analysing its influence on enactment and/or revision work of standard production unit system.

  • PDF

The Case Study on The Introduction and Practical Application of the Budget Management System -On the Performance Measurement of Standard Work Unit- (예산관리제도의 도입과 실제적 운용에 관한 사례연구 -표준적인 작업의 성과측정을 중심으로-)

  • 윤용운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.39-51
    • /
    • 1979
  • In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.

  • PDF

Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work - Focusing on Masonry Plaster Waterproofing Tile Labors - (공동주택 건설공사의 표준품셈과 실투입 노무량 비교 분석 - 미장, 방수, 조적, 타일공사를 중심으로 -)

  • Jeon, SangHoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.110-118
    • /
    • 2015
  • The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

Establishment of Standard Times Using STD Technique in Multi-product and One-unit Production Systems (다품종 단일제품생산 시스템에서 표준시간 자료법을 이용한 표준시간의 설정)

  • 박성학;최성운
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.10 no.16
    • /
    • pp.27-38
    • /
    • 1987
  • This paper develops a standard time table using STD(Standard Tine Data) Technique in multi-product and one-unit production systems. STD leads to greater consistency between similar jobs. The constant-time and special elements will always be the same even though they pertain to different part numbers. Actually, the standards will very based on the size of the variable elements that are in control of the time. A real-field example is presented.

  • PDF

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

A Study on Actual Conditions and Sizing Systems of Domestic Glove Production Companies (국내 장갑 제조업체의 실태조사 및 치수체계에 관한 연구)

  • Choi Hei-Sun;Kim Eun-Kyong
    • Journal of the Korean Society of Costume
    • /
    • v.55 no.2 s.92
    • /
    • pp.116-128
    • /
    • 2005
  • The aim of this study is to understand problems with both fit and sizing system of gloves by analyzing the glove production industries with an emphasis on the sizing system, production measurement system, and general marking situation. Also, to suggest the basic raw materials for improving sizing system for gloves, actual glove control sizes were compared to the anthropometric data of the previous study Fifteen domestic production companies were participated in this study-Domestic glove production companies established their own sizing system by copying inter-national brand's glove sizing system or by their experience. The Korean Standard of gloves and the 1997 Korean Standard Anthropometrics Measurement for producing glove patterns are not considered because of its discordance with the reality of the required measurements. Domestic glove production companies used different size designation and labeling system. Size measurement unit also showed difference among the glove production companies. Some companies used 'cm', some used 'mm', some used 'inch' for the measurement unit. In general, companies produced 5 to 4 sizes in one design of glove and the production was the highest in M and L size. In 9 out of 15 companies preferred control size as hand length and hand circumference. For reference size, most of the companies preferred finger circumference, finger length, palm length, hand breadth, crotch height, and hand thickness. Actual glove sizes were compared to the anthropometric data of the previous study. The results indicated that most of the measurements of actual glove sizes were significantly larger than the anthropometric data.

Information Constitution of Daily Job-Site Report for Specialty Contractors (전문건설업체 작업일보의 정보구성에 관한 연구)

  • Lee, Kang-Min;Shin, Won-Sang;Lee, Dong-Eun;Kim, Dae-Young;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.279-280
    • /
    • 2012
  • The Construction Standard Production Unit(CSPU) has been used for the standard cost estimate in public and private construction projects. However, It is questionable if the reliability and/or authenticity of the system is acceptable due to the lack of consistent enactment and/or revision procedures. This study identifies informational conditions and issues relative to using daily work report as a data collection method for enacting and/or revising CSPU system, and establishes the measures for improving the daily work report. This study aims on the information constitution of daily job-site report, daily manpower report, wages register for specialty contractors. According to the research results, most of necessary data were included in a daily job-site report. In conclusion, it is investigated that data of daily manpower report and wage register need to be included in a daily job-site report for understanding the current state of worker in the future.

  • PDF

Design and Implementation of Apparel Product Support System based on SOA Environment (SOA 환경 기반의 의류 생산지원 시스템 설계 및 구현)

  • Han, Jong-Jin;Choi, Dong-Oun;Song, Hang-Suk
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.4
    • /
    • pp.1-9
    • /
    • 2008
  • SOA sorts function of old applications by function unit that have business meaning, and through standard call interface, do orchestration by component unit of service. System that developed in this paper predicts production point of time when order with frugality of production raw material. And reduce original register resources purchase expense and production costs in proper stock and increase company's competitive power. Also, design and implementation production management system for many species small quantity production of SOA base that reflect this analyzing correctly company's manufacturing process and original register resources supply and demand present condition.

A STUDY ON CYCLONE SYSTEM ASSISTING FOR THE REVISION OF CONSTRUCTION STANDARD PRODUCTION UNIT SYSTEM

  • Tae-Kyung Lim;Han-Seong Gwak;Won-Sang Shin;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.583-586
    • /
    • 2013
  • Construction processes are highly repetitive. A resource entity continuously cycles through work tasks that processes or uses resources. Web-CYCLONE (Halpin 1992) has been accepted as a useful tool for modeling and analyzing a specific operation. However the system has a lack of practicality as follows: (1) it does not efficiently record and keep track of operation models in a database; (2) it does not provide the functions which facilitate to retrieve corresponding model and to update local variables of the model using observed data; (3) it does not automate the complex process that executes simulation experiment, analyzes simulation outputs and generates a report on behalf of the practitioners. Therefore, practitioners have a difficulty in reusing, modifying and analyzing the existing operation models. This study introduces a Client/Server based CYCLONE that improves above-mentioned limitations in the existing Web-CYCLONE. The system was illustrated by revising CSPU in practice.

  • PDF