• 제목/요약/키워드: Stable Operation

검색결과 1,953건 처리시간 0.124초

기존도시철도의 CBTC도입에 따른 병행운전방안 도출연구 (The Study for Mixed Operation of CBTC Train and Non-CBTC Ones)

  • 김유호;이수환;유종천;김종기;백종현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(III)
    • /
    • pp.151-156
    • /
    • 2003
  • The Communication Based Train Control(CBTC) System generally used to improving existing lines in the world is efficient and stable for improvement. Also it is efficient for improvement because it does not cause any problems in operation of existing lines. We examined the mixed operation scheme for more efficient and stable improvement when improvement is implemented depending on aged equipment and the increased number of passengers in the Korean city railroad. The biggest point in the mixed operation is to implement a stable test without interfering with the operation of the existing lines. For this purpose, we deduced a method of installing the equipment, a method of testing depending on the installed equipment, and the types of mixed operation, and presented a scheme of execution of the methods depending on the mixed operation.

  • PDF

제어시스템 튜닝에 의한 발전소 효율향상에 관한 연구 (A Study on Efficiency Improvement by Fine Tuning of Power Plant Control)

  • 김호열;김병철;변승현
    • 전기학회논문지
    • /
    • 제61권10호
    • /
    • pp.1496-1501
    • /
    • 2012
  • A fine tuning on a control system is essential not only for stable operation but also for efficient operation of the power plant. There has been a very few studies on efficiency change by control system tuning. So, it was not clear that if it could be improved or not when the control is stable by fine tuning and how much it could be improved if it works. An accurate algorithm for measurement of the plant efficiency was newly introduced and implemented to measure integrated fuel flow and electricity MW output and to calculate the mean efficiency for given time. As a result, stable operation after fine tuning of control parameters for major controlled variables brought higher efficiency than un-stable operations like a cycling or an oscillation. The plant efficiency has been monitored during various tests and tunings to confirm how much it changes by tuning of the control system on power plant. Now, we can say that the efficiency can be improved in stable operation by fine tuning of the control system.

Chevron형 bi-stable MEMS 구동기의 모델링 및 실험적 응답특성 분석 (Modeling and Experimental Response Characterization of the Chevron-type Bi-stable Micromachined Actuator)

  • 황일한;심유석;이종현
    • 한국정밀공학회지
    • /
    • 제21권2호
    • /
    • pp.203-209
    • /
    • 2004
  • Compliant bi-stable mechanism allows two stable states within its operation range staying at one of the local minimum states of the potential energy. Energy storage characteristics of the bi-stable mechanism offer two distinct and repeatable stable states, which require no power input to maintain it at each stable state. This paper suggests an equivalent model of the chevron-type bi-stable microactuator using the equivalent spring stiffness in the rectilinear and the rotational directions. From this model the range of spring stiffness where the bi-stable mechanism can be operated is analyzed and compared with the results of the FEA (Finite Element Analysis) using ANSYS for the buckling analysis, both of which show a good agreement. Based on the analysis, a newly designed chevron-type bi-stable MEMS actuator using hinges is suggested for the latch-up operation. It is found that the experimental response characteristics of around 36V for the bi-stable actuation for the 60$mu extrm{m}$ stroke correspond very well to the results of the equivalent model analysis after the change in cross-sectional area by the fabrication process is taken into account. Together with the resonance frequency experiment where 1760Hz is measured, it is shown that the chevron-type bi-stable MEMS actuator using hinges is applicable to the optical switch as an actuator.

Effect of Sheath Structure on Operating Stability in an Anode Layer Thruster

  • Yasui, Shinsuke;Yamamoto, Naoji;Komurasaki, Kimiya;Arakawa, Yoshihiro
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2004년도 제22회 춘계학술대회논문집
    • /
    • pp.245-250
    • /
    • 2004
  • The discharge current oscillation has been measured for various hollow anode widths and its axial positions using a 1㎾-class anode layer hall thruster. As a result, there were thresholds of magnetic flux density for stable discharge. The plasma structure inside the hollow anode was numerically analyzed using the fully kinetic 2D3V Particle-in-Cell (PIC) and Direct Simulation Monte Carlo (DSMC) methods. The results reproduced both stable and unstable operation modes. In the stable operation case, which corresponds to the case with low magnetic flux, the plasma penetrated into the hollow anode deeper than the case with higher magnetic flux density case. This suggests that comparably large substantial anode area should contribute to stable operation.

  • PDF

휴전일정검토 프로그램 개발 (A Development Of An Outage Scheduling Program)

  • 이운희;주행로
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.30-32
    • /
    • 2006
  • New building, reinforcement, maintenance and test of power equipments are always necessary in a power system. Our power system is getting old and the total power capacity is also getting large, so power equipment outages are getting often. Power euipment outages make less margine for a stable condition of a power system operation. Therefore, through overviews and countermeasures against the outage should be made in order to be in a stable operational conditions during the outage. We have too many outages over 300 per month in our power system. So, we can't have enough time to study our power system and to make countermeasures without a helping program. This program is designed to give various and appropriate informations necessary for an outage scheduling. By applying this program, we can raise the job efficiency high and spare the time spent. So we can afford to do through system studies and make good countermeasures. I think this program can contribute greately to power system stable operation.

  • PDF

보일러 드럼의 안전조업을 위한 동특성 모델링 및 제어기 설계 (Dynamic Simulation and Controller Design for the Safe Operation of Boiler Drum)

  • 이익형
    • 한국안전학회지
    • /
    • 제8권4호
    • /
    • pp.133-138
    • /
    • 1993
  • The stable and safe operation of a boiler system is essential for ensuring stability of the chemical processes. A dynamic simulation of a boiler drum was performed to identify the dynamics of the boiler drum. The obtained results represented that the variation of process variables disturb boiler system. So, disturbance rejection with tracking and constraints handing was necessary for stable operation of boiler drum. Among many controller, GPC has been known to show good performance in set point tracking than disturbance. In order to improve disturbance rejection performance measurable disturbance term was Introduced in basic GPC model. The controller which had tracking and disturbance rejection was designed for Improving the stable operation of a boiler system.

  • PDF

Performance improvement of membrane distillation using carbon nanotubes

  • Kim, Seung-Hyun;Lee, Tae-Min
    • Membrane and Water Treatment
    • /
    • 제7권4호
    • /
    • pp.367-375
    • /
    • 2016
  • Although the bucky paper (BP) made from carbon nanotubes (CNTs) possesses beneficial characteristics of hydrophobic nature and high porosity for membrane distillation (MD) application, weak mechanical strength of BP has often prevented the stable operation. This study aims to fabricate the BP with high mechanical strength to improve its MD performance. The strategy was to increase the purity level of CNTs with an assumption that purer CNTs would increase the Van der Waals attraction, leading to the improvement of mechanical strength of BP. According to this study results, the purification of CNT does not necessarily enhance the mechanical strength of BP. The BP made from purer CNTs demonstrated a high flux ($142kg/m^2{\cdot}h$) even at low ${\Delta}T$ ($50^{\circ}C$ and $20^{\circ}C$) during the experiments of direct contact membrane distillation (DCMD). However, the operation was not stable because a crack quickly formed. Then, a support layer of AAO (anodic aluminum oxide) filter paper was introduced to reinforce the mechanical strength of BP. The support reinforcement was able to increase the mechanical strength, but wetting occurred. Therefore, the mixed matrix membrane (PSf-CNT) using CNTs as filler to polysulphone was fabricated. The DCMD operation with the PSf-CNT membrane was stable, although the flux was low ($6.1kg/m^2{\cdot}h$). This result suggests that the mixed matrix membrane could be more beneficial for the stable DCMD operation than the BP.

TWO GENERALIZATIONS OF LCM-STABLE EXTENSIONS

  • Chang, Gyu Whan;Kim, Hwankoo;Lim, Jung Wook
    • 대한수학회지
    • /
    • 제50권2호
    • /
    • pp.393-410
    • /
    • 2013
  • Let $R{\subseteq}T$ be an extension of integral domains, X be an indeterminate over T, and R[X] and T[X] be polynomial rings. Then $R{\subseteq}T$ is said to be LCM-stable if $(aR{\cap}bR)T=aT{\cap}bT$ for all $0{\neq}a,b{\in}R$. Let $w_A$ be the so-called $w$-operation on an integral domain A. In this paper, we introduce the notions of $w(e)$- and $w$-LCM-stable extensions: (i) $R{\subseteq}T$ is $w(e)$-LCM-stable if $((aR{\cap}bR)T)_{w_T}=aT{\cap}bT$ for all $0{\neq}a,b{\in}R$ and (ii) $R{\subseteq}T$ is $w$-LCM-stable if $((aR{\cap}bR)T)_{w_R}=(aT{\cap}bT)_{w_R}$ for all $0{\neq}a,b{\in}R$. We prove that LCM-stable extensions are both $w(e)$-LCM-stable and $w$-LCM-stable. We also generalize some results on LCM-stable extensions. Among other things, we show that if R is a Krull domain (resp., $P{\upsilon}MD$), then $R{\subseteq}T$ is $w(e)$-LCM-stable (resp., $w$-LCM-stable) if and only if $R[X]{\subseteq}T[X]$ is $w(e)$-LCM-stable (resp., $w$-LCM-stable).

소방펌프의 안정적 운영을 위한 하드웨어 및 모니터링 소프트웨어 개발 (Development of Hardware and Monitoring Software for Stable Operation of Fire Pumps)

  • 구본휴;김두현;김성철
    • 한국안전학회지
    • /
    • 제37권4호
    • /
    • pp.28-35
    • /
    • 2022
  • This study is aimed to develop a safety diagnosis system for fire pumps that detects normal and abnormal signals for the stable operation of the system. Hence, the following activities were carried out: first, a threshold value was identified for the normal operation and six abnormal operations (adherence of impeller, absence of water source, separation of pump and motor, run-stop operation, air inflow into the casing, and reverse-phase loss of the power line) reflecting changes in the current, flow and pressure of fire pumps; secondly, based on the identified signals, an algorithm capable of detecting three abnormal signals was developed and in terms of hardware, a current, pressure and flow sensor suitable for the analogue input values of NI-6009 was designed and installed. This combination of the hardware and software is applicable as a diagnosis system to ensure the stable operation of fire pumps.

안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구 (A Study on Loop operation of 154kV Substation Distribution line for Stable power supply)

  • 김광호;손명권;정종찬
    • 산업기술연구
    • /
    • 제29권B호
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.

  • PDF