• Title/Summary/Keyword: Speed-up of conventional railway line

Search Result 56, Processing Time 0.035 seconds

Running safety evaluation of tilting vehicle when speed-up in curved track of conventional line (기존선 곡선선로에서 한국형 틸팅열차의 속도향상시 주행안전성 평가)

  • Ham, Young-Sam;Lee, Dong-Hyong;Kwon, Seok-Jin;Seo, Jung-Won;Jun, Hyun-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.25-29
    • /
    • 2010
  • Safety of railroad is result of reliability which is received from test & evaluation of system. Railroad system is consisted of various sub system such as vehicle, supply of electric power, signal, communication, rail track construction, operation. To secure safety of railroad, evaluation about parts, assembly, sub system, whole system etc.. that compose railroad is essential. In this paper, I wish to describe for results that analyze korean tilting vehicle's derailment coefficient developed by national research achievement. Confirmed that is possible even if speed up, curved line department running speed that estimate korean tilting vehicle's running safety in curved line track of Jungang Line about 20 km/h than present operating speed.

  • PDF

Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service (틸팅열차 상용화대비 기존선 인프라시스템의 효율적 유지보수체계 검토)

  • Yoo, Keun-Su;Lee, Chang-Hun;An, Gang-Yell;Kim, Joung-Tea
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.79-87
    • /
    • 2008
  • The major objective of this study is to investigate the effective maintenance system for the infrastructure on the conventional lines in which the tilting train runs. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks was developed. Besides, the efficiency prediction and the linear fitness of the existing conventional lines for a tiling train service were examined on the preceding study which was the development of track system innovation technology for speed-up of them. So, in this paper we propose the more effective maintenance method than the existing it in order to securing the high reliability and safety classified by the infrastructure, in analyzing foreign materials and the maintenance as well as the inspection cycle concerning domestic infrastructures of the track and the catenary etc. on the railway. And we look forward to playing a decisive role as reference material for the effective improvement of the existing maintenance about the infra on the conventional lines for the commercial service of the tilting train.

  • PDF

A study of eatablishing ETCS Level 1 to speed up conventional lines (기존선 속도향상을 위한 ETCS Level 1 구축방안 연구)

  • Yoon, Yong-Ki;Jeong, Rag-Gyo;Kim, Chae-Duck
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.666-670
    • /
    • 2011
  • ATS(Automatic Train Stop)s are is effected by track environment, signal distance and train braking distance. So onboard signaling systems such as ATP(Automatic Train Protection) are installed on conventional lines by some train operation companies. With the mixed signalling, the onboard signaling system is overlaid on a conventional line with ATS, it is possible to run the line with conventional trains and ATP trains and to use the advantages of ATP(higher speed or more trains on the line). This paper includes guidelines a mixed signalling(ETCS and ATS) system architecture, operation concepts and infill balise installation.

  • PDF

Investigation of Improvement Scheme for the Curve Sections on the Conventional Line Prepared for the Tilting Train Service (틸팅열차 상용화대비 기존선 곡선구간 개량방안 검토)

  • An, Gang-Yell;Lee, Chang-Hun;Yoo, Keun-Su;Kim, Joung-Tea
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.897-904
    • /
    • 2008
  • The major objective of this study is to investigate the effective improvement plan for the curve sections in the conventional lines which the tilting train runs on. In order to the speed-up of conventional lines that have many curve lines, there needs a improvement construction of substructure such as the straight or double track work and so on. But in this case, it needs to have a plenty of the cost and the period. Therefore, the tilting train which provides the high-speed service effectively in curve tracks and is operating at abroad, was been studying to be suited to natural features. So, in this paper we investigate the improvement method at the sections only where need the extension of the transition curves, and the present status of them for the effective tiling train service using results which were examined on the preceding study which was the development of track system innovation technology for speed-up of them. And we look forward to playing a decisive role as reference material for the decision of the linear fitness in order to operate effectively on the conventional lines for the commercial service of the tilting train, on the basis of checking out the sufficient condition concerned in the track alignment and the velocity which are required in the railway construction rules and the design criteria.

  • PDF

Experimental Study on Characteristics of Track Settlement Depending on Components of Ballast Track (자갈도상 궤도 구성품에 따른 궤도 침하 특성에 대한 실험적 연구)

  • Kim, Man-Cheol;Bae, Young-Hoon;Lee, Si-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.498-505
    • /
    • 2016
  • As a basic study to develop maintenance-effective optimal ballast track in preparation for upgrading a conventional line to a high speed railway, a full-scale test that combined the components of ballast track was conducted and the characteristic of track settlement was analyzed. As a result of the full-scale test, reduction in maintenance via an increase of the elasticity of only the pad was insignificant; however, the effect increased significantly with increasing of the weight of the sleeper or with increasing of the weight of the sleeper and the thickness of the ballast together with use of a pad with high resiliency. An optimal type of ballast track, in line with upgrading the speed of a conventional line, shall be developed through cost efficiency analysis considering the maintenance cost depending on the track settlement as well as the initial construction cost.

Evaluation of Speed Limit of Tilting Trains Including Passenger's Comfort in Conventional Line (틸팅특성과 승차감을 고려한 틸팅열차의 곡선부 제한속도 평가)

  • Eum Ki-Young;Um Ju-Hwan;Yeo In-Ho;You Young-Hwa
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.927-934
    • /
    • 2004
  • For the purpose of speed-up of conventional lines with many curves, the introduction and operation of tilting train is under process. Those are Joong-Ang, Jang-Hang and Ho-nam lines etc. Tilting trains can run a curve section faster than existing trains without a significant violation of passenger's comfort and enable to reduce operating time in the lines with many curves. In this study, the trains speeds are evaluated, based on the alignment of conventional line, criteria for passenger's comfort and investigated field conditions of the sections where the curves exist. Decision on whether the alignment(transition line) needs to be modified or not is also made. Relative efficiency on curve sections of tilting train to existing trains is approximately $50\%$ in average.

  • PDF

Safety Assurance of Dropper Clamp in Overhead Catenary System(I) (전차선로 드롭바 클램프 안전성 확보(I))

  • Lee, Ki-Won;Cho, Yong-Hyeon;Park, Young;Min, Byung-Il;Kwon, Sam-Young;Seok, Chang-Sung
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.223-226
    • /
    • 2007
  • In the electrical railway, for the improvement of a train speed, it is necessary to study not only the dynamic behaviors of overhead catenary system but the fatigue behaviors of components for a safety assurance according to the increase of vibration level. One of the critical components in the system is a dropper. Therefore, the dynamic force acting on a dropper was measured in the Chungbuk Line and analyzed to figure out the dynamic characteristics the dropper. And in order to assure the safety of dropper clamp and cable, we proposed a test facility as well as test method based on the test results For the further study, we will measure the dynamic forces in the conventional line and high-speed line and make up the test condition, so that the safety of dropper clamps can be assured.

  • PDF

Field Test to Investigate Lateral Dynamic Characteristics of Steel Plate Girder Railway Bridge without Ballast (무도상 판형교의 횡방향 동적거동특성 분석을 위한 실험적 연구)

  • Oh Ji Taek;Kim Hyun Min;Park Ok Jung;Park Chan
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.591-595
    • /
    • 2003
  • Field measurements were conducted to analysis lateral dynamic characteristics of existing steel plate girder railway bridges without ballast. Three bridges which have 9m, 12m, 18m span length in Kyoung-Bu Line were selected for test. According to the each bridge, dynamic lateral deflections and accelerations were measured. From the present study, it was observed that dynamic lateral amplification phenomena caused by a fluctuation of lateral force were occurred under the current running circumstances. Lateral deflections were occurred below than that specified in Korean railway bridge specification, but lateral accelerations is a match for vertical accelerations. From now on, it is in need a plan to reduce lateral accelerations for the conventional railway Line speed up.

  • PDF

Analysis on Running Safety for KTX Vehicle (KTX차량의 주행 안전성 해석)

  • Kim, Jae-Chul;Ham, Young-Sam
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.473-479
    • /
    • 2007
  • Lateral vibration at the tail of KTX train was found during the acceptance test. In order to settle the problem of lateral vibration, the wheel conicity was changed 1/40 to 1/20. However, we should evaluate the running safety of vehicle with 1/20 wheel conicity because modification of wheel conicity may cause the running performance to be worse and critical speed to reduce. In this paper, we calculate critical speed of KTX bogie as wheel conicity increase and analyze the running safety for KTX that has 20 car trainset formation using VAMPIRE. and compare with the test results of KHST to validate analysis results on high speed line. A analysis results show that critical speed of 0.3 wheel conicity is over 375km/h and curving performance of 1/20wheel conicity is better than 1/40. Also, we examinate the running performance of KTX to check out possibility to increase speed of KTX on conventional line. A analysis results show that it is possible to increase up to 10% the speed of KTX on tangent line but KTX on a curved line should be operated with the speed of conventional train.

A primary study of Rail Station Selection and Train Operation Management Plan with Transportation Demand (철도수송수요를 고려한 정차역 선정과 열차운행방안 -경부선 서울~조치원구간을 중심으로-)

  • 문대섭;정병현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.80-87
    • /
    • 2001
  • The purposes of this primary study are the selection of rail station and train operation management techniques for express-rail operation service at the convectional railway electrification. For these analyses, we used the KNR statistics and KROIS data of rail stations and train users by rail line. Therefore, we chose the important stations for express-rail operation of Kyongbu conventional rail line (esp. Seoul-Jochiwon section) through the rail transportation demand. and then, suggested primary operational management plan thorough the effects analyses of decreasing total travel time and increasing transportation demand by train speed-up. This study has some bounds and limits for proceeding, as it does, we excluded as followings: the conditionals of fate system, headways and train diagram, economic/financial analysis and technological assessment, and other railway technological infrastructures and a certain railcar specification, etc. . We propose to enlarge this study into a feasibility study of express or skip-stop operation service and compatible vehicle system decision considering with the best possible investment rail line, furthermore. in front of Kyongbu (Seoul-Busan) high-speed rail open in 2004, we have to try to progress the efficiencies of railway operation applying various train operation management plan.

  • PDF