In this paper, we modeled the devices used easily in PV system circuits. In addition, for full operation of the photovoltaic system, a complete operation system for the DC-DC buck-boost converter and the MPPT control system was modeled and simulated to confirm good operation. we were constructed an actual system with the same conditions in the simulation and experimented. The purpose is to confirm the stable power supply through the load leveling by presenting the PCS considering ESS of photovoltaic power generation. we will do study to apply hybrid capacitors that have high energy density to the same size compared to the EDLC to DVR. As a result, we proposed a single-phase 3 kW grid-connected solar power converter.
In this paper, the feasibility of generating solar power near an abandoned quarry is examined with the objectives of resolving the essential problems that quarries encounter, such as rockfalls and space usage issues. On an abandoned quarry site in Sadang, Seoul, Republic of Korea, two different PV installation methods were analyzed. The first is attaching PV directly on the quarry slope. Since there are no corresponding safety standards and precedents for installing solar panels directly on slopes, the power generation potential was calculated by using topographic data and reasonable assumptions. The surface area of cut slope section was extracted from the Digital Elevation Model(DEM) via ArcGIS and Python programming to calculate the tilt and power capacity of installable panels. The other approach is installing PV as a rockfall barrier, and the power generation potential was analyzed with the assumption that the panel is installed in the direction of facing solar irradiation. For the derivation of power generation, the renewable energy generation analysis program SAM(System Advisor Model) was used for both methods. According to the result, quarries that have terminated resource extraction and remain devastated have the potential to be transformed into renewable energy generation sites.
Now a days has problem of energy resource shortage and environmental pollution. We are looking up various solution plans regarding this problem. Solar power is one of the solution to solve the energy shortage problem. But solar power is affected by the weather. So variation weather we can use Maximum Power Point Tracing device for solar PV system. In this paper, New MPPT method is proposed to tracking MPP at low and high insolation by combining constant voltage method with Newton Method method.
Kim, Seung-Eul;Seo, H.U.;Kwon, W.S.;Lee, Y.J.;Han, D.H.;Ban, C.H.;Choe, G.H.
Proceedings of the KIPE Conference
/
2012.11a
/
pp.159-160
/
2012
For renewable energy has been studied by many research. among them, non-pollution and infinite solar energy using solar power system is newly spotlighed. the DC output characteristic of the solar cell, connection to grid and using the inverter is essential to the process of converter DC to AC. in this paper, study the corresponding changes in the efficiency of the inverter and arcing occurs in the inverter, depending on the conditions and regulations in the UL-1699 series arc occurs.
Park, Se-Joon;Yoon, Jeong-Phil;Choi, Hong-Jun;Shin, Yeong-Shik;Cha, In-Su;Kim, Dong-Mook;Lim, Jung-Yeol
한국태양에너지학회:학술대회논문집
/
2008.04a
/
pp.80-85
/
2008
A PVIB(Photovoltaic in Building) system is united by a constituent outer covering and can expect dual effects that reduce expenses for the establishment of a PV system. It is a profitable technology because it does not need a building as it is a stand alone PV system. This paper presents design, operational features analysis, and PCS(Power Conditioning System) of grid-connected 30kW PVIB set up on the library of Dongshin University. For a sustainable photovoltaic system in this area, the data of the PVIB system are collected and analyzed by monitoring system using LabView. PCS of the grid-connected PVIB system, also, is designed for optimal operation with characteristics suggested in this paper.
Journal of the Korean Society of Environmental Restoration Technology
/
v.16
no.4
/
pp.27-40
/
2013
These day morden cities have serious climatic problems due to enviornmental load caused by excessive development of urbanization. As technological improvement to answer to various ecological disasters and climate changes are also called on the field of construction, inter-disciplinary studies linked to the estabilishment of sustainable energy generation systems and enviornmental control is needed in a consilient point of view. This study aims to analyse optimal site conditions for photovoltaic system and green roof planting through solar radiation simulation in a integrated perspective. In so doing, it seeks to proffer basic study for developing a sound use of roof area that is sustainable in environmental and resources aspects. A computer simulation showed that, in the case of total seasonal solar radiation, summer season resulted 312.5kWh in 35% of total annual solar radiation. This season indicated the lowest radiation rate of the year for direct sunlight in 45.8% of total seasonal solar radiation. Due to such solar radiation simulation, at the largest optimal planting area, Glechoma hederacea var. longituba secured $719.16m^2$ of gross roof area.
The output of solar cell should be operated in the maximum power point, since it is greatly fluctuated by insolation and temperature. Also, since the output of solar cell is a DC power, it needs the inverter to interact with utility line. In this paper, we made composed of PV system with a chopper that control the maximum power point and the inverter that drive to the high power factor and low harmonic by use of defected and compensated utility line voltage for synchronous phase with utility line.
Characteristics and properties of batteries applicable to the photovoltaic system are described in this paper. The use of a number of different types of batteries and designs depends on the many and varied requirements for battery power and the different environmental and electrical conditions under which they must operate. Most of the batteries used in PV systems are lead/acid batteries, though nickel/cadmium batteries are used for small applications in locations with extreme climates or where high reliability is essential such as spacecraft. The vanadium redox battery has been acknowledged as a promising energy storage system for a wide range of applications.
국내의 많은 연구를 통해 신재생에너지의 사전 경제성 평가를 위한 모델들은 다수 개발된 바 있지만, 기본적인 연산 프로세스와 연산방식만 지원되고 있을 뿐, 연산결과에 크게 영향을 미치는 신재생에너지의 각 요소 데이터가 제공되지 못하고 있다. 이에 대하여 본 연구에서는 한국에너지기술연구원에서 개발된 신재생에너지 자원지도 데이터를 근간으로 하여 경제성 평가의 기본이 되는 정보를 데이터베이스로 구성함과 동시에 GIS(Geographical Information System)을 활용하여 해당 영역에서 직접 대상위치를 선정하고, 인자값의 설정에 따라 사전 적정성 평가를 지원하는 연산 프로세스를 개발하고자 하였다. 웹 도구를 활용하여 사용자의 접근을 용이하게 하며, 설비데이터의 입력이 가능하게 구성하여 지속적으로 업데이트가 가능한 시스템의 제작을 그 목표로 한다.
The objectives of this study are to investigate input variables of photovoltaic generation programs and to compare their prediction to actual generation of photovoltaic system in the C city hall and the C city sewage treatment plant. We investigated the actual amount of generation, the forecast amount of generation, the amount of solar radiation data, and calculated the relative errors. We simulated the photovoltaic system of C city hall and the C city sewage treatment plant located in Chungju using existing programs, such as SAM, RETSCREEN, HOMER, PV SYST, Solar Pro. The result of this study are as follows : Through examining the relative errors of monthly predicted and actual generation data, monthly generation data showed big errors in winter season?. Except winter season, actual amount of generation and the predicted amount of generation showed no large errors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.