• Title/Summary/Keyword: Software Construction

Search Result 1,205, Processing Time 0.029 seconds

The guideline for development and verification of railway software (철도 소프트웨어 개발 및 검증을 위한 지침)

  • Lee, Young-Jun;Choi, Jong-Gyun;Cha, Kyung-Ho;Cheon, Se-Woo;Lee, Jang-Soo;Kwon, Ki-Choon;Jung, Ui-Jin
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.659-664
    • /
    • 2008
  • The Railroad Safety Act's regulation reads as follows. "The Minister of Construction and Transportation may qualify and authorize the product to guarantee performance and safety of parts, machine, and device used in Railway fields." Another regulation reads as follows."“The guidelines about targets, standards, and procedures of Quality and Authority in first provision are decided as Ministry of Construction and Transportation Decree." The software used in rail cars and facilities is considered as a railway product. Therefore, it is qualified and authorized for acquiring the safety of rail cars and facilities. The software businesses shall again a Quality and Authority for applying a software to the rail cars and facilities. This paper regulates some guidelines that are needed to develop a software. The procedures that a software developer performs are divided by plan, requirement, design, implementation, and maintenance. The procedures that a software verification person performs are classified by verification plan, requirement verification, design verification, implementation verification, testing verification, maintenance verification, and safety activity. The entire processes and detailed activities to develope and verify a software are described as new guidelines.

  • PDF

The study on frame work of developing and modification with expert system program software (전문가 시스템소프트웨어 유지 보수에 있어서 프레임워크에 관한 연구)

  • Chang-Duck Jung
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.4
    • /
    • pp.503-510
    • /
    • 2004
  • The summary of this paper is as follows. The literature on existing expert system maintenance software technique are reviewed in Module program, a case of assembly line process problem at construction industry and planning expert system to solve this problem at construction as a standard configured process system are discussed. the regenerative expert system approach for the construction process expert system and its example for the assembly line construction process appear in the research also, this paper shows the architecture and some feature of the CES.(Construction Expert System), which is a prototype implemented for the regenerative expert system approach. the paper introduce the framework of the regenerative expert approach as a general framework of developing and maintaining a large-scale expert systems.

  • PDF

Safety Assessment and Behavior Control System using Monitoring of Segmental PSC Box Girder Bridges during Construction (세그멘탈 PSC박스거더교량의 시공간 계측모니터링을 통한 확률적 구조안정성 평가 및 제어 시스템)

  • Shin, Jae-Chul;Cho, Hyo-Nam;Park, Kyung-Hoon;Bae, Yong-Il
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.191-201
    • /
    • 2001
  • In spite of the increasing construction of segmental PSC box girder bridges, the techniques associated with real-time monitoring, construction control and safety assessment during construction have been less developed compared with the construction techniques. Thus, the development of an integrated system including real-time measurement and monitoring, control and safety assessment system during construction is necessary fur more safe and precise construction of the bridges. This study presents a prototype integrated monitoring system for preventing abnormal behavior and accidents under construction stages, that consist of behavior control system for precise construction, reliability-based safety assessment system, and structural analysis. Also, a prototype software system is developed on the basis of the proposed model. It is successfully applied to the Sea-Hae Grand Bridge built by FCM. The integrated system model and software system can be utilized for the safe and precise construction of segmental PSC bridges during construction.

  • PDF

Development of the Quality Management Software of Spatial Database (공간데이터베이스 품질유지관리 소프트웨어 개발)

  • 최병길;조광희
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.285-290
    • /
    • 2003
  • This study is aimed at standardizing the process of spatial database construction and developing a software tool for process management. Knowhow of five GIS firms and provisions of NGI(National Geography Institute) were analyzed. In this study, the process of spatial database construction was standardize. The system from this study has the capability to manage the process of construction database using GIS and to deal with the metadata of unit map, generated from the process, systematically and continuously The process was also shown by using either Gantt chart or PERT chart after developing an interface for "MS Project". A software "Visual Basic for Application" was used for this study.

  • PDF

Construction Method of Software Test Monitoring Framework (소프트웨어 테스트 모니터링 프레임워크 구축 방안)

  • Seo, Yongjin;Kim, Su Ji;Kim, Hyeon Soo
    • Journal of Internet Computing and Services
    • /
    • v.17 no.6
    • /
    • pp.61-69
    • /
    • 2016
  • Software testing is an activity to find defects included in software through creating test cases from the software system specification. In order to perform software testing effectively, it is required to prepare the full test plan, to create well-defined test cases, and to execute test monitoring activities systematically. Most existing researches for the test approaches focus on automating the activities from the test cases generation to the test execution. Contrary to those approaches, we study automatic approaches for test monitoring activities. For this, we identify the research issues that should be solved to automate test monitoring activities. Next, with those solutions, we suggest the construction method for an automatic framework for test monitoring.

Development of Safety Management Software Related to the Safety Level of Small & Medium Size Construction Sites (중소규모 건설현장의 안전수준을 고려한 안전관리 프로그램의 개발)

  • 안홍섭;이재용;장명훈;최순주;고성석
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.2
    • /
    • pp.170-177
    • /
    • 1999
  • In these days, large construction companies computerize safety management function and use softwares but small and medium ones do not have any or little in Korea, although it is much mote necessary for the latter having high accident ratios than for the former to make efforts to develop computerized safety management tools. That is, a reason why no safety management program has been developed and construction accident are required to be reduced outstandingly, computerized safety management systems are much needed to be developed. Thus, safety management software named SAFETY PLUS has been developed in this research that has 4 management scopes classified by the size of construction project. The utilization of SAFETY PLUS will be able to increase both effectiveness and efficiency of safety management efforts and result in drastic decrease of construction accidents.

  • PDF

Semi-automatic Legal Ontology Construction based on Korean Language Sentence Patterns

  • Jo, Dae Woong;Kim, Myung Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.6
    • /
    • pp.69-77
    • /
    • 2017
  • The information related to legislation is massive, and it takes much time and effort to manually build the legislation ontology. Thus, studies on machine-based automated building methods are underway. However, the studies to automatically construct such systems focus on using TBox construction, and those based on automated ABox construction, which corresponds to instances, theoretical systems and data building cases, has not yet been sufficiently developed. Therefore, this paper suggests using a semi-automatic ABox construction method based on sentence patterns to automatically build the ontology for the legislation of the Republic of Korea. Precision and Recall experiments were conducted to further discuss the performance of the suggested method. These experiments provide a comparison between the manual classification, and the triples built by the machines of the legal information by assessing the corresponding numerical values.

A Development of the Customer based On-premise ERP Implementation Process Framework

  • Oh, Deok-Soo;Kim, Hyeong-Soo;Kim, Seung-Hee
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.257-278
    • /
    • 2021
  • As the definition of the vendor-oriented implementation method, which was utilized in adopting an ERP system, has been centered around the project construction business, it was difficult for the EPR adopting organization to systematically prepare ERP projects and have enough deliberative opportunities to change-related policies. Furthermore, this method does not have a fully standardized construction process. Accordingly, by defining an organization that wants to adopt an ERP system as a customer, this paper develops the customer-based ERP construction process framework that assists both customers and developers who construct the system. For this purpose, this paper reviews the previous research and collects the construction processes of the commercial ERP SW vendor and ERP construction cases while proposing the three-layer process framework to construct ERP through the KJ method. The ERP process framework consists of 7 processes, 32 activities, 141 tasks while providing definitions for concepts of each component. Furthermore, the proposed processes and phases were set in order of the recommended execution, while the activities were suggested as an open-ended type so that the application and usability can be increased and polished by reflecting experts' opinions. The contribution of this study is to standardize the ERP project process by transforming the previous supplier-based ERP construction method into the customer-based one while providing important procedure and activity frameworks that apply to diverse ERP solutions per vendor. At the same time, this study provides an theoretical foundation to develop the construction process for the customer -based Cloud ERP. In practice, At the beginning of the ERP system construction project, it provides communication or process tailoring tools for the stakeholder.

Compatibility-Guaranteeing Software Component Evolution based on Composition Rules (안정적 확장이 보장되는 소프트웨어를 위한 정형적 조합 법칙)

  • Lee, Sunae;Lee, Joon-Sang;Bae, Doo-Hwan
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04c
    • /
    • pp.10-12
    • /
    • 2003
  • Since building large-scale software is usually bi9 burden to most developers, it has been an important issue for many researchers. In this paper, we suggest a mechanism that can be used to support such large-scale development. Through composition rules via subtyping within Statecharts, incremental construction of software can be achieved. Among the composition rules (i.e. delegation rule and mixin rule), we mainly focus on the delegation rule in our work. Not only we can check the subtype property. but also can verify the behavior compatibility of composite results that are available by composition rules. This new mechanism is helpful for analysts as well as designers, and it can be used as a guideline for incremental and compatible construction of component based software.

  • PDF

Practical use of computational building information modeling in repairing and maintenance of hospital building- case study

  • Akhoundan, Majid Reza;Khademi, Kia;Bahmanoo, Sam;Wakil, Karzan;Mohamad, Edy Tonnizam;Khorami, Majid
    • Smart Structures and Systems
    • /
    • v.22 no.5
    • /
    • pp.575-586
    • /
    • 2018
  • Computational Building Information Modeling (BIM) is an intelligent 3D model-based process that provides architecture, engineering, and construction professionals the insight to plan, design, construct, and manage buildings and infrastructure more efficiently. This paper aims at using BIM in Hospitals configurations protection. Infrastructure projects are classified as huge structural projects taking advantage of many resources such as finance, materials, human labor, facilities and time. Immense expenses in infrastructure programs should be allocated to estimating the expected results of these arrangements in domestic economy. Hence, the significance of feasibility studies is inevitable in project construction, in this way the necessity in promoting the strategies and using global contemporary technologies in the process of construction maintenance cannot be neglected. This paper aims at using the building information modeling in covering Imam Khomeini Hospital's equipment. First, the relationship between hospital constructions maintenance and repairing, using the building information modeling, is demonstrated. Then, using library studies, the effective factors of constructions' repairing and maintenance were collected. Finally, the possibilities of adding these factors in Revit software, as one of the most applicable software within BIM is investigated and have been identified in some items, where either this software can enter or the software for supporting the repairing and maintenance phase lacks them. The results clearly indicated that the required graphical factors in construction information modeling can be identified and applied successfully.