• Title/Summary/Keyword: Six-sigma

Search Result 496, Processing Time 0.036 seconds

A Six Sigma Project for Reducing the Color Variation of the Monitor Materials (모니터 소재의 색상편차 개선을 위한 6시그마 프로젝트)

  • 홍성훈;반재석
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.3
    • /
    • pp.166-176
    • /
    • 2001
  • This paper considers a six sigma project for reducing the color variation of the monitor materials in a chemical plant. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variable evaluation table; a melting pressure, a coloring agent, and a DP color variation. DOE is utilized for finding the optimal process conditions of the three key process input variables. The sigma level of defects rate becomes a 4.58 from a 2.0 at the beginning of the project.

  • PDF

A Case Study of a Six Sigma Project for Improving Gate Painting Quality (게이트 도장 품질 개선을 위한 6시그마 프로젝트 사례 연구)

  • Hong, Sung-Hoon;Choi, Ik-Jun
    • Journal of Korean Society for Quality Management
    • /
    • v.34 no.1
    • /
    • pp.1-12
    • /
    • 2006
  • This paper presents a six sigma project for improving gate painting quality in a medium-sized automotive part company. The project follows a disciplined process of five macro phases: Define, Measure, Analyze, Improve, and Control. A CTQ(critical to quality) is determined based on COPQ(cost of poor quality) analysis, and a process map is utilized for identifying process input variables. Three KPIV s(key process input variable) are selected; Painting Temperature, Painting Quantity, and Painting Viscosity, and DOE(design of experiments) is utilized for finding the optimal process conditions for three KPIVs. MINITAB software is used for data analyses and DOE. The sigma level of defects rate has improved from 2.93 to 3.66.

A Study on Ambidextrous Attribute About 6 Sigma Problem Solving Tools (6시그마 문제해결 도구의 양면성 속성에 대한 연구)

  • Seong, Gi-Uk;Han, Hun-Seok;Kim, Bong-Seon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.623-638
    • /
    • 2012
  • Since six sigma program was first introduced in late 1990's, it has been evolved in Korea. The number of six sigma adopting company are getting increased and diversify manufacturing, service, government. In these days, the rapid innovation of internet technology change the media industry's game rule. This paper is concerned with a six sigma applications to internet media portal service company. The main focus of this study is to introduce an empirical study on the implementation of DMAIC procedures for internet media portal service company.

  • PDF

A Study on Quality Improvement in Internet Media Portal Company Applying 6 Sigma Methodology (6시그마를 적용한 인터넷 미디어 포털 기업의 품질개선에 관한 연구)

  • Sung, Ki-Wook;Kim, Bong-Sun
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.219-227
    • /
    • 2008
  • Since six sigma program was first introduced in late 1990's, it has been evolved in Korea. The number of six sigma adopting company are getting increased and diversify manufacturing, service, government. In these days, the rapid innovation of internet technology change the media industry's game rule. This paper is concerned with a six sigma applications to internet media portal service company. The main focus of this study is to introduce an empirical study on the implementation of DMAIC procedures for internet media portal service company.

6$\sigma$ 시그마 설계에 관한 고찰

  • 박성현
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2000.05a
    • /
    • pp.260-277
    • /
    • 2000
  • 최근 미국의 모토롤라(주)에서 시작된 6 시그마(Six Sigma) 경영이 우리나라의 기업들에게 큰 관심의 대상이 되고 있다. 이 논문은 6 시그마 중에서 설계 및 개발분야에 사용되는 6$\sigma$ 설계(Design for Six Sigma: DFSS)에 관하여 고찰하여 보는 논문이다. 6 시그마에 관한 많은 이론이 나와 있으나 아직 DFSS에 관해서는 매우 미약한 편이다. 이 논문에서는 먼저 DFSS의 정의, DFSS 프로세스의 단계, DFSS의 로드맵 등을 먼저 다루고, 다음으로 DFSS에서 사용되는 각종의 과학적 관리기법들(품질기능전개, Scorecard, FMEA, TRIZ, 다구찌설계 등)에 대하여 간단히 기술하기로 한다. 마지막으로 DFSS의 실무적용방법을 제안한다.

  • PDF

An Empirical Study in the Effects of Six Sigma Project Management System on Project Balanced Scorecard (6시그마 프로젝트 관리시스템의 활용이 프로젝트 균형성과지표에 미치는 영향에 관한 실증적 연구)

  • Yang, Jong-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.8
    • /
    • pp.2068-2077
    • /
    • 2009
  • While six sigma project management systems have been widely used as a knowledge management systems, no one has proposed an empirical explanation for impacts of project management systems on project performance. This study proposes a structural equation model of the project management system that relates learning/growth, internal growth, customer performance, and financial effects based on six sigma project performance. The relationships are investigated using data collected from a sample of green and black belts. The results indicate that there are a causal relationship with use of project management and learning/growth and internal process, internal process and customer performance, and customer and financial performance. However, there is no relationship between internal process and financial effects. The results suggest that six sigma project system could effectively be implemented as a knowledge management system to improve six sigma performance of green an black belts. This study also compares index of SEM's model fit of research model and that of alternative models for further analysis. The result shows that index of research model of index is better than that of alternative model.

Project Selection of Six Sigma Using Group Fuzzy AHP and GRA (그룹 Fuzzy AHP와 GRA를 이용한 식스시그마 프로젝트 선정방안)

  • Yoo, Jung-Sang;Choi, Sung-Woon
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.11
    • /
    • pp.149-159
    • /
    • 2019
  • Six sigma is an innovative management movement which provides improved business process by adapting the paradigm and the trend of market and customers. Suitable selection of six sigma project could highly reduce the costs, improve the quality, and enhance the customer satisfaction. There are existing studies on the selection of Six Sigma projects, but few studies have been conducted to select the correct project under an incomplete information environment. The purpose of this study is to propose the application of integrated MCDM techniques for correct project selection under incomplete information. The project selection process of six sigma involves four steps as follows: 1) determination of project selection criteria 2) calculation of relative importance of team member's competencies 3) assessment with project preference scale 4) finalization of ranking the projects. This study proposes the combination methods by applying group fuzzy Analytical Hierarchy Process (AHP), an easy defuzzified number of Trapezoidal Fuzzy Number (TrFN) and Grey Relational Analysis (GRA). Both of the weight of project selection criteria and the relative importance of team member's competencies can be evaluated by group fuzzy AHP. Project preferences are assessed by easy defuzzified scale of TrFN in case of incomplete information.)

An Empirical Study on Performance of Six Sigma Tools in Korean Service Industry (한국 서비스산업의 6시그마 기법 시행과 그 성과에 관한 실증적 연구)

  • 장대성;양종곤;황인천
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.1
    • /
    • pp.1-20
    • /
    • 2004
  • Six sigma has been the most influential management innovation program since 1996 in Korea. As a result of successful implementation of 6 sigma, there have been a number of dramatic quality improvement cases. However, no empirical study of 6 sigma implementation study has done especially in the service industry of Korea. This article reviews status of finance companies which implemented 6 sigma programs in Korea and then demonstrates the relationship between 6 sigma problem solving tools such as analysis of variance and graph techniques, etc and project success and operational performance. Customer survey tools, process analysis, and documentation tool are identified as influential tools on project success. Tools of measure steps, customer survey tools, and documentation tool are found as influential tools on operational performance.