• Title/Summary/Keyword: Site prioritization

Search Result 20, Processing Time 0.03 seconds

Assessment of Landfill Hazard Using the Value-Structured Approach (가치구조화기법에 의한 매립지 유해성 등급화)

  • Hong, Sang-Pyo;Kim, Jung-Wuk
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.93-103
    • /
    • 1997
  • LHR(Landfill Site Hazard Ranking Model) was developed for ranking the relative hazard of landfill sites by using the method of value-structured approach. LHR consists of combining a multiattribute decision-making method with a Qualitative risk assessment approach. A pairwise com parisian method was applied to determine weights of landfill site factors related. To determine the hazard of landfill site, hydrogeological factors, waste characteristics factors and receptors factors were evaluated by LHR. LHR can help decision-makers prioritization of remediation of landfill sites through the relatively convenient and concise evaluation method of landfill site features related. LHR focuses mainly on pathways of groundwater and surfacewater for evaluating landfill hazard to receptors including humans. To validiate the applicability of LHR, Nanjido Landfill site, Metropolitan Landfill site, and Hwasung Landfill site were evaluated.

  • PDF

Site Prioritization for Artificial Recharge in Korea using GIS Mapping (지리정보시스템을 이용한 우리나라 인공함양 개발 유망지역 분석)

  • Seo, Jeong-A;Kim, Yong-Cheol;Kim, Jin-Sam;Kim, Yong-Je
    • Journal of Soil and Groundwater Environment
    • /
    • v.16 no.6
    • /
    • pp.66-78
    • /
    • 2011
  • It is getting difficult to manage water resources in South Korea because more than half of annual precipitation is concentrated in the summer season and its intensity is increasing due to global warming and climate change. Artificial recharge schemes such as well recharge of surface water and roof-top rainwater harvesting can be a useful method to manage water resources in Korea. In this study, potential artificial recharge site is evaluated using geographic information system with hydrogeological and social factors. The hydrogeological factors include annual precipitation, geological classification based on geological map, specific capacity and depth to water level of national groundwater monitoring wells. These factors were selected to evaluate potential artificial recharge site because annual precipitation is closely related to source water availability for artificial recharge, geological features and specific capacity are related to injection capacity and depth to water is related to storage capacity of the subsurface medium. In addition to those hydrogeological factors, social aspect was taken into consideration by selecting the areas that is not serviced by national water works and have been suffered from drought. These factors are graded into five rates and integrated together in the GIS system resulting in spatial distribution of artificial recharge potential. Cheongsong, Yeongdeok in Gyeongsangbuk-do and Hadong in Gyeongsangnam-do, and Suncheon in Jeollanam-do were proven as favorable areas for applying artificial recharge schemes. Although the potential map for artificial recharge in South Korea developed in this study need to be improved by using other scientific factors such as evaporation and topographical features, and other social factors such as water-curtain cultivation area, hot spring resorts and industrial area where groundwater level is severely lowered, it can be used in a rough site-selection, preliminary and/or feasibility study for artificial recharge.

A Case Study of Bridge Scour Vulnerability Evaluation and Prioritization for National Highway Bridges in the National Capital Region (수도권 국도교량 세굴위험도 평가 및 등급화 사례 연구)

  • Park, Jae-Hyun;Kim, Jeong-Hun;An, Seong-Chul;Lee, Ju-Hyung;Chung, Moon-Kyung;Kwak, Ki-Seok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.2
    • /
    • pp.7-21
    • /
    • 2008
  • Foundation failure due to bridge scour during floods is the leading cause of bridge failure. Performed were the evaluation of bridge scour vulnerability and prioritization on real bridges registered in the National Highway Bridge Inventory of the capital region. The case studies for 30 national highway bridges consist of site investigation including boring test, bridge scour analysis fur the design flood, bearing capacity evaluation of the bridge foundation before and after scour, comprehensive evaluation of bridge scour vulnerability, and prioritization. Nine of 26 spread (feting bridges showed the potential future vulnerability to scour with significant decrease in the bearing capacity of foundations due to scour and the remaining 17 spread footing bridges were expected to maintain their stability to resist the effects of scour. Three of 4 pile foundation bridges exhibited considerable decrease in the bearing capacity of foundation after scour.

Bridge Scour Prioritization and Management System (I) - System Development - (교량세굴 위험도 결정 및 유지관리 시스템 개발(I) - 시스템 개발 -)

  • Kwak, Kiseok;Park, Jae Hyun;Chung, Moon Kyung;Woo, Hyo Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2B
    • /
    • pp.187-195
    • /
    • 2006
  • A bridge scour management system is developed to evaluate the vulnerability of bridge piers to scour and to help establish effective disaster measures, taking into account the locality and scour characteristics in Korea. This system is programmed using the techniques of the geographical information system(GIS) for the storage, retrieval, and display of information regarding to bridge scour. The system functions are basically divided into two parts; prioritization and maintenance. Bridges are initially screened and prioritized for bridge scour inspection and evaluation using the basic information which is obtained from the office review. The bridge scour evaluation including site investigation is performed and the vulnerability of bridge piers is categorized into six groups taking into account the local scour depth, foundation bearing capacity, foundation type, foundation depth, and present scour condition. The system tabulates and plots all the data and the results.

Use of GIS for Prioritization and Site Suitability Analysis of Potential Relocation Sites for Military Training Facilities: A Case Study in South Korea

  • Yum, Sang-Guk;Park, Young-Jun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.40 no.3
    • /
    • pp.195-206
    • /
    • 2022
  • The primary purpose of this study was to analyze assessment factors by identifying and prioritizing live fire shooting area requirements using the AHP (Analytic Hierarchy Process) technique. Derived assessment factors for candidate sites were divided into six categories. Of these, four categories (base-to-range distance, weapon danger area, range terrain, and size) were in the realm of physical geography while the remaining two (land use and proximity to habitation) fell under the general heading of human geography. A case study was also conducted to select several alternative firing ranges using derived factors. The optimal location was analyzed by evaluating the candidate site using each assessment factor. As a result, it was found that assessment factors applying to GIS (Geographic Information System) were able to effectively analyze a suitable location for relocation of the focal training facility, taking into consideration public-safety issues, training requirements, and residents' past and likely future complaints. Through this process, it can prevent the waste of time and effort in determining an optimal location for a live fire shooing range.

Collaborative Planning Model for Brownfield Regeneration (브라운필드 재생을 위한 협력적 계획 모델 연구)

  • Kim, Eujin Julia;Miller, Patrick
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.3
    • /
    • pp.92-100
    • /
    • 2015
  • Unlike most other planning processes, brownfield planning generally requires a high level of technical and legal expertise due to potential site contamination. To successfully engage in inclusionary decision making, an adaptive collaboration strategy for brownfield planning is therefore critical. This study examines how a communicative planning approach can be used to overcome the challenge of enabling experts from different fields to work alongside lay people from the local community to achieve a properly balanced collaboration in brownfield planning. After identifying appropriate indicators for collaboration through a literature review of established communicative planning theory, these indicators are applied to the brownfield planning process, highlighting critical points of collaboration such as site prioritization, assessment, remediation, and redevelopment throughout. The results suggest the critical need for an adaptive model focusing on three aspects: 1. Facilitation of a balanced dialogue between the experts with social, cultural, and design-based knowledge and the ones with scientific and engineering-based knowledge, 2. Preparation of an appropriate tool for risk communication with the lay people, 3. Development of decision support system for the integration of expert-oriented technical data and public opinion-oriented subjective data.

Bridge Scour Prioritization and Management System (II) - System Verification - (교량세굴 위험도 결정 및 유지관리 시스템 개발(II) - 시스템 검증 -)

  • Kwak, Kiseok;Park, Jae Hyun;Yoon, Hyun Suk;Woo, Hyo Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2B
    • /
    • pp.197-208
    • /
    • 2006
  • Case studies for real bridge sites are performed to verify the applicability of the Bridge Scour Management System in the field. The case studies for 20 bridges in Gangneung District of National Road Management consist of site investigations including the boring tests, bridge scour analyses for the design floods, bearing capacity evaluation of the bridge foundation before and after scour, and comprehensive evaluation of the bridge scour maintenance. The bridge scour management system is verified as an useful tool which can evaluate bridge scour vulnerability quantitatively, and is also proposed as a reasonable system which can help establish effective measures and secure the safety of bridges during floods.

A Study on Web Vulnerability Assessment and Prioritization of Measures by Vulnerabilities (웹 취약점 점검 및 취약점별 조치 우선 순위 산정에 관한 연구)

  • Seong, JongHyuk;Lee, HooKi;Ko, InJe;Kim, Kuinam J.
    • Convergence Security Journal
    • /
    • v.18 no.3
    • /
    • pp.37-44
    • /
    • 2018
  • Today we live in a flood of web sites and access numerous websites through the Internet to obtain various information. However, unless the security of the Web site is secured, Web site security can not be secured from various malicious attacks. Hacking attacks, which exploit Web site security vulnerabilities for various reasons, such as financial and political purposes, are increasing. Various attack techniques such as SQL-injection, Cross-Site Scripting(XSS), and Drive-By-Download are being used, and the technology is also evolving. In order to defend against these various hacking attacks, it is necessary to remove the vulnerabilities from the development stage of the website, but it is not possible due to various problems such as time and cost. In order to compensate for this, it is important to identify vulnerabilities in Web sites through web vulnerability checking and take action. In this paper, we investigate web vulnerabilities and diagnostic techniques and try to understand the priorities of vulnerabilities in the development stage according to the actual status of each case through cases of actual web vulnerability diagnosis.

  • PDF

AI-based Construction Site Prioritization for Safety Inspection Using Big Data (빅데이터를 활용한 AI 기반 우선점검 대상현장 선정 모델)

  • Hwang, Yun-Ho;Chi, Seokho;Lee, Hyeon-Seung;Jung, Hyunjun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.843-852
    • /
    • 2022
  • Despite continuous safety management, the death rate of construction workers is not decreasing every year. Accordingly, various studies are in progress to prevent construction site accidents. In this paper, we developed an AI-based priority inspection target selection model that preferentially selects sites are expected to cause construction accidents among construction sites with construction costs of less than 5 billion won (KRW). In particular, Random Forest (90.48 % of accident prediction AUC-ROC) showed the best performance among applied AI algorithms (Classification analysis). The main factors causing construction accidents were construction costs, total number of construction days and the number of construction performance evaluations. In this study an ROI (return of investment) of about 917.7 % can be predicted over 8 years as a result of better efficiency of manual inspections human resource and a preemptive response to construction accidents.

Analysis of Improvement Targets for Public Safety Threats in the Maritime Area Around the Launch Site (발사장 주변 해상의 공공안전 위협요인에 대한 개선 대상 분석)

  • Ahn-Tae Shin;Hun-Soo Byun
    • Korean Chemical Engineering Research
    • /
    • v.62 no.2
    • /
    • pp.153-162
    • /
    • 2024
  • Securing safety in the maritime danger zone around the launch site before a launch is a fundamental requirement. If maritime safety is not ensured, the launch is halted or postponed. However, challenges have arisen in the process of securing public safety at sea due to factors such as the increasing population engaged in water leisure activities. These challenges include unauthorized entry of vessels into controlled areas, unauthorized access by water leisure activity participants, and non-compliance with regulations. In this paper, we employed the Delphi/Analytic Hierarchy Process to survey 22 experts, including professionals in launch vehicle development and launch site operation, to identify 10 factors posing threats to maritime public safety. Additionally, we identified five issues that need improvement for ensuring maritime safety. This study verified the consistency of expert opinions and conducted an analysis of importance and prioritization, objectively confirming the necessity for amendments to relevant laws or the enactment of new laws concerning the establishment and control of danger zones around launch sites.