• Title/Summary/Keyword: Site Logistics Planning

Search Result 12, Processing Time 0.022 seconds

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

Optimization of real-time path finding for material handling of finishing work considering the logistics flow (물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구)

  • Kim, Wansoub;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

Freight Terminal Site Selection Using the Analytic Hierarchy Process: A Case Study on the Youngnan Freight Terminal (계층분석방법을 이용한 화물터미널 입지선정에 관한 연구 - 영남권 내륙화물기지 사례를 중심으로 -)

  • Ahn, Seung-Bum;Kim, Eui-Jun;Byeon, Eui-Seok
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.34-43
    • /
    • 2003
  • The Korean government has been working to reduce national logistics costs since the early 1990s. One of the major plans instituted by the government was to build five complex freight terminals using ICDs(inland container depots) as hub inland terminals. This paper explains the process and the methods adopted for site selection, with special focus on the Youngnam Freight Terminal. Among nineteen developable sites in Youngnam region, four candidates were selected based on the Map Overlay Approach under several criteria, including land acquisition costs, proximity to major highways and railroads, suitability of the terrain, etc. In this study, we used the AHP to select the best site among the four sites.

A Design and Implementation of Mobile Logistics Information System (모바일 물류정보시스템 설계 및 구현)

  • Lee, Won-Joo;Lee, Sang-Jun;Lim, Heon-Yong;Kim, Chang-Hyeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.7
    • /
    • pp.139-146
    • /
    • 2012
  • In this paper, we implement an m-LIS(Mobile-Logistics Information System) for an effective logistics management in consideration of logistics process and work environment. The m-LIS could perform the entire business process every minute and promote the work efficiency by tying up with ERP and POS system. Moreover, this system could enhance the management level of service and supply chain. Due to the reason that the existing logistics business was not computerized and automated, most of operation was accomplished by means of workers experience and convention. This problem brought about both the ineffective management and logistics quality deterioration by weakening the control power of the logistics site. In order to solve this problem, we put focus on providing the real-time operation monitoring environment on the spot, the satisfaction of the efficiency on the spot, and the optimized system by building up the logistics information system. Furthermore, we attest that the new logistics system could properly cope with the increase of the quantity of goods transported owing to stable logistics information support and the market expansion and growth caused by the firm interface between the new ERP and its related system.

Modular reactors: What can we learn from modular industrial plants and off site construction research

  • Paul Wrigley;Paul Wood;Daniel Robertson;Jason Joannou;Sam O'Neill;Richard Hall
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.222-232
    • /
    • 2024
  • New modular factory-built methodologies implemented in the construction and industrial plant industries may bring down costs for modular reactors. A factory-built environment brings about benefits such as; improved equipment, tools, quality, shift patterns, training, continuous improvement learning, environmental control, standardisation, parallel working, the use of commercial off shelf equipment and much of the commissioning can be completed before leaving the factory. All these benefits combine to reduce build schedules, increase certainty, reduce risk and make financing easier and cheaper.Currently, the construction and industrial chemical plant industries have implemented successful modular design and construction techniques. Therefore, the objectives of this paper are to understand and analyse the state of the art research in these industries through a systematic literature review. The research can then be assessed and applied to modular reactors.The literature review highlighted analysis methods that may prove to be useful. These include; modularisation decision tools, stakeholder analysis, schedule, supply chain, logistics, module design tools and construction site planning. Applicable research was highlighted for further work exploration for designers to assess, develop and efficiently design their modular reactors.

The Planning of Culture Center for The old & The young (노인.어린이 문화.복지 센터 계획안)

  • Youn, Ji-Young;Shin, Jae-Moon
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.11a
    • /
    • pp.177-178
    • /
    • 2006
  • This plan is for a different type of welfare facilities devised by analyzing problems with existing welfare centers and focusing on connection with residents and link between culture and welfare and among generations. In terms of re-development plan of Youngsun-2-dong, Youngdo-gu, Busan and the neighborhood under this plan, Youngsun-dong, Youngdo-gu is one of the densely populated districts of the aged, with lower growth rate and poor housing and welfare facilities. However, the district has a blessed natural environment and historical site of cultural relics of the Neolithic Age as well as growth potential as a logistics center with broader network of roads linking with Bukhang Bridge when Namhang Bridge construction is complete, showing the aspiration for change toward hi-tech maritime city in the 21st century of Youngdo-gu. This plan is expected to promote unity between the old and children, protection from social marginalization, and re-socialization education and set the stage for participation and solidarity of residents in the community.

  • PDF

A Study on the Development of Web Services for Terminal Operating System (터미널운영시스템 대상 웹서비스 개발에 대한 연구)

  • Lee, Hoon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2020.11a
    • /
    • pp.153-154
    • /
    • 2020
  • It can be replaced with a smart work service centering on tasks that do not require on-site work among container terminal tasks. Here, the cloud service is helpful for small and medium-sized stevedoring companies as it reduces the cost and time required for initial system construction, and allows you to pay usage fees as needed. This study introduces a case study on the development of web services that comply with industry standards so that advanced ICT can be used in connection with the terminal operation system.

  • PDF

A Basic Study of Crane Trajectory Distance Calculation for Sustainable PC Members Erection of Large Logistic Building (대형물류센터 PC부재 양중을 위한 크레인 궤적거리 산정 기초 연구)

  • Lim, Jeeyoung;Oh, Jinhyuk;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.77-78
    • /
    • 2023
  • As large logistics buildings have high floor heights and long spans, these buildings are designed as PC structures, and large cranes are used to lift PC members. PC erection planning can generally cause errors depending on the field engineer's experience. To solve this problem, a basic analysis method is needed to establish a systematic PC member erection plan. Crane work can be minimized if the trajectory is easily and quickly calculated according to the location of the crane and applied to the site. Therefore, the objective of this study is a basic study of crane trajectory distance calculation for sustainable PC members erection of large logistic building. In this study, a crawler crane commonly used for lifting PC members is limited. The trajectory distance for the PC erection plan was automatically calculated using the algorithm.

  • PDF

A Study on Establishing a Port Business Valley in Incheon Port (인천항 포트비즈니스밸리 전략 수립에 관한 연구)

  • Kim, Un-Soo;Ahn, Woo-Chul
    • Journal of Korea Port Economic Association
    • /
    • v.28 no.2
    • /
    • pp.1-27
    • /
    • 2012
  • As more manufacturing and global businesses are being pulled into the port area, the idea of a Port Business Valley (PBV) is being pondered as it would create jobs and added value. The PBV would be centered around the harbor and be connected to the port, a logistics district, an industrial district, and the city. The resulting domestic and foreign investment in logistics, industry, business, tourism, living, etc. would vitalize the geographical characteristics of Incheon Port. It would also generate the largest amount of ripple effects between industries in the PBV. However, up until recently, the most frequently offered examples of planning that have helped logistics of a port to grow that have used a PBV have been those of Busan New Port and Gwangyang Port. However, this study is the result of the recent inception of the idea of creating a PBV centered around Incheon Port and the need for experts to develop a plan for such a PBV in Incheon by conducting a site specific study. The aim of this study is to set up the concept of PBV and establish PBV model of Incheon Port. In addition, this study identifies construct factors and their strategies for establish PBV of Incheon Port and then, shows the key factors and related-strategies on Fuzzy-AHP analysis from a survey of logistics experts with Incheon Port.

Operation Strategy for Electronic Commerce Promotion Base on Common Mechanic Industry (ASP기반으로 한 기계산업체간의 성공적 전자상거래 구축을 위한 전략연구)

  • Jeong, Sei-Hyun
    • Journal of Information Technology Services
    • /
    • v.1 no.1
    • /
    • pp.81-117
    • /
    • 2002
  • The generalization of Internet use has been spreaded all over the world and impacted company to introduce intranet and extranet for their operation which dealt with electronic commerce. For these reason, endeavor of implementation of web site system is promotioned and enhanced the possibility of adaptation range for the view of company. Dramatic competition which company faced with the use of internet and request from all over the world made company brought company to various and different type of level. It is necessary to develop website system with experty knowledge to satisfy customer needs. To deal with this situation, works from the level of government should proposed to spread whole country business which propelled through kyungnam mechanic industry information promotion center. With strategic proposal concerning district characteristics to adapt electronic commerce successfully, information promotion should performed. Support of government is needed continuously to realize infra of ASP composed of 4,877 mechanic industry company. It might be possible to deal with international rapid change with cooperation of company and government related department.