• Title/Summary/Keyword: Ship building

Search Result 359, Processing Time 0.025 seconds

Development of Cable Management System for Ship (선박 전선 관리 시스템 개발)

  • Lee, Jae-Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.11
    • /
    • pp.1987-1992
    • /
    • 2008
  • In recent years, the shape of ship building have been advanced. Thus the system is complex and cable is much used in ship. In this paper, Dijkstra algorithm is used to solve the shortest path of cable laying. Cable laying is given much weight in fable management system of ship. The developed cable management system is cut down on expenses and is improve the operation efficiency for ship building. Therefore, the developed cable management system can be used a support system in order to achieve a management target of company.

Hull Form and Layouts of 740-ton Replacement Vessel for R/V Eardo of KIOST: Ship Design and SMRs (740톤급 종합해양연구선 이어도호 대체선 선형 및 설계 특성)

  • Park, Cheong Kee;Park, Dong-Won;Lee, Gun Chang;Kim, Young Jun;Min, Young Ki
    • Ocean and Polar Research
    • /
    • v.42 no.2
    • /
    • pp.171-178
    • /
    • 2020
  • R/V EARDO, commissioned in 1992, has successfully carried out ocean research campaigns in Korean jurisdictional and adjacent waters, including continental margins and coastal zones within the Korean Exclusive Economic Zone (EEZ), for 29 years. However, it will soon be reaching the end of its useful service life. A replacement for R/V EARDO is urgently needed to ensure the safety of vessel itself and its crews, and efficient ship operation and maintenance, as well as to meet modern scientific mission requirements (SMRs). Basic specifications for a replacement ship have been devised and reviewed over the past nine months. A test of the proposed hull form was also performed. The total tonnage of the proposed vessel is approximately 740 tons, and the overall length and width are 62.0 and 11.6 m, respectively. The new ship will thus be 73% larger than the current R/V EARDO; in particular, the research workspace will be 4.4 times larger. The major design priorities are the propulsion system, efficiency of radiated noise and vibration control, and the dynamic positioning system. An environmentally friendly emission system, meeting International Maritime Organization (IMO) Tier III regulations, will be installed in the third exhaust pipe. Various wet and dry lab spaces as well as 32 different scientific instruments have also been considered in the ship design.

Blasting user safety system using RFID in the ship yard (RFID를 이용한 블라스팅 상황인지 시스템)

  • Yun, Won-Jun;Ro, Young-Shick;Suh, Young-Soo;Kang, Hee-Jun
    • Proceedings of the IEEK Conference
    • /
    • 2009.05a
    • /
    • pp.190-192
    • /
    • 2009
  • Development of safety monitoring system for workers in the ship building industry is currently under progress using RFID(Radio Frequency IDentification) for successful development of the U-BUSS(Ubiquitous- Safety User Safety System). For decades, RFID technology has become a key technology to provide the real-time location system of worker and is variously used for safety monitoring system to increase productivity, improve the blasting quality and enhance the safety of working condition in the ship building industry In this paper, 2.45GHz band RTLS(Real Time Location System) technologies and the ubiquitous safety monitoring system of the ship yard's blasting cell are described.

  • PDF

A Legal and Practical Study on the Main Clauses of a Refund Guarantee in a Shipbuilding Contract (선박수출거래에서 환급보증(Refund Guarantee) 주요 조항의 법적·실무적 고찰)

  • KIM, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.72
    • /
    • pp.25-55
    • /
    • 2016
  • The Buyer shall demand to the Builder the repayment of the pre-delivery instalments paid in case of the Builder's default under a ship-building contract. The Buyer require a refund guarantee issued by a financial institution for a security for the repayment of the pre-delivery instalments paid. As the title of a refund guarantee, in practice, is various, we should look into the contents or the expressions in a guarantee to decide whether a guarantee is a refund guarantee. A refund guarantee, a sort of independent bank guarantee, has characteristic of abstractness, and is independent from the ship-building contract. A refund guarantee is available against the beneficiary's first written demand and signed statement certifying that the Builder failed to make the refund in accordance with the ship-building contract. The guaranteed amount of a refund guarantee will be automatically increased in accordance with the Builder's receipt of the respective instalment, which is not in the other advance payment guarantee. These characteristics of a refund guarantee are derived from the expressions in a refund guarantee rather than inherent therein. This illustrates that careful attention is required to the contents and expressions of the main clauses in a refund guarantee.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

Experimental Study on the Variation of Maneuvering Characteristics of Container Ship with Rudder Type (타의 종류에 따른 컨테이너선의 조종성능 특성 연구)

  • Kim, Yeon-Gyu;Kim, Sun-Young;Kim, Sung-Pyo;Lee, Suk-Won
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.5
    • /
    • pp.28-33
    • /
    • 2004
  • Generally Horn-type rudders have been used for single propeller and single rudder system. The reason is that the rudder torques of Horn-type rudder are smaller than those of Spade rudder with same lift force. But it is found that the rudder cavitation occurs on a Horn-type rudder of fast container ship. In this paper the comparison results of Horn-type and Spade rudders are described. HPMM tests are carried out to compare the effects of two rudder types on the maneuverability of a ship. It is shown that the maneuvering performance of a ship equipped with Horn-type rudder is better than that equipped with Spade rudder by comparing the test results and maneuvering coefficients at scantling condition. The reason is that the movable part area of Horn-type rudder is about 14% larger than that of Spade rudder with same total area. And the rudder torque of Spade rudder is greater than that of Horn rudder. At ballast condition, however, the effect of rudder type is negligible.

Optimizing Design for Rudder Horn (Rudder Horn 최적화 설계 방안)

  • Park, Sung-Geun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2006.09a
    • /
    • pp.77-80
    • /
    • 2006
  • In recent booming up of the ship building market, the supplying of large scale casting is difficult to keep the delivery schedule for ship yard because of the restrict manufacturer in Korea. And also, it is main cause to rise-up the cost of castings. This paper describes the outline of guidance of optimizing design for Rudder Horn Casting to reduce the risk of the delivery problem to ship yard.

  • PDF

Relationships of Job Stress, Fatigue & Depression among one Ship-building Supply Workers (일 조선업 협력업체 근로자의 직무 스트레스, 피로 및 우울과의 관계)

  • Kim, Sang-Dol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.2789-2796
    • /
    • 2014
  • This is a descriptive correlation study to identify job stress, fatigue, and depression among ship-building supply workers. The subjects were 175 ship-building supply workers at one small & medium-sized ship-building supply company in K city. The data were collected from February 1st throughout 28th, 2013. The collected data were analyzed using the SAS program through mean, standard deviation, and Pearson's correlation coefficients. There was a positive correlation between job need and job insecurity of the job stress underlying factors and fatigue respectively (r=0.15, p<.05; r=0.17, p<.05). There was a negative correlation between organizational system factor and fatigue (r=-0.19, p<.05). Also there was a positive correlation between workplace culture factor and depression (r=0.15, p<.05). In conclusion, it could be needed for organizational managers to develop strategies for improving the workers' psychosocial workplace environment.