• Title/Summary/Keyword: Setup Time

Search Result 658, Processing Time 0.026 seconds

Genetic Algorithm with an Effective Dispatching Method for Unrelated Parallel Machine Scheduling with Sequence Dependent and Machine Dependent Setup Times (작업순서와 기계 의존적인 작업준비시간을 고려한 이종병렬기계의 일정계획을 위한 효과적인 작업할당 방법을 이용한 유전알고리즘)

  • Joo, Cheol-Min;Kim, Byung-Soo
    • IE interfaces
    • /
    • v.25 no.3
    • /
    • pp.357-364
    • /
    • 2012
  • This paper considers a unrelated parallel machine scheduling problem with ready times, due times and sequence and machine-dependent setup times. The objective of this problem is to determine the allocation of jobs and the scheduling of machines to minimize the total tardy time. A mathematical model for optimal solution is derived. An in-depth analysis of the model shows that it is very complicated and difficult to obtain optimal solutions as the problem size becomes large. Therefore, a genetic algorithm using an effective dispatching method is proposed. The performance of the proposed genetic algorithm is evaluated using several randomly generated examples.

Heuristics for Non-Identical Parallel Machine Scheduling with Sequence Dependent Setup Times (작업순서 의존형 준비시간을 갖는 이종병렬기계의 휴리스틱 일정계획)

  • Koh, Shiegheun;Mahardini, Karunia A.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.3
    • /
    • pp.305-312
    • /
    • 2014
  • This research deals with a problem that minimizes makespan in a non-identical parallel machine system with sequence and machine dependent setup times and machine dependent processing times. We first present a new mixed integer programming formulation for the problem, and using this formulation, one can easily find optimal solutions for small problems. However, since the problem is NP-hard and the size of a real problem is large, we propose four heuristic algorithms including genetic algorithm based heuristics to solve the practical big-size problems in a reasonable computational time. To assess the performance of the algorithms, we conduct a computational experiment, from which we found the heuristic algorithms show different performances as the problem characteristics are changed and the simple heuristics show better performances than genetic algorithm based heuristics for the case when the numbers of jobs and/or machines are large.

Location tracking using cache in distributed call processing architecture for PCS (PCS를 위한 분산 호 처리 구조(DCPA)에서 캐쉬를 이용한 위치 추적)

  • 박선영;이원열;한기준
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.34S no.8
    • /
    • pp.27-36
    • /
    • 1997
  • In this paper, we propose a locating strategy using a cache based on the distributed call processing stucture. In our stategy, each originating call server, withc is responsible for call setup, has a cache to memorize the service ratio of call server which serves the called terminal.We present performance comparison of the proposed strategy with the existing strategy via simulation. We can reduce the cost for call setup because the originating call server can simpley establish a call without tracing the location of the called terminal. The proposed strategy also reduceds network loads caused by signaling at call setup time and lessens the frequency of queries for the database systems which can be a bottleneck when it serves many subscriber.

  • PDF

A Tabu Search Algorithm for Single Machine Scheduling Problem with Job Release Times and Sequence - dependent Setup Times (작업 투입시점과 순서 의존적인 작업준비시간이 존재하는 단일 기계 일정계획 수립을 위한 Tabu Search)

  • Shin, Hyun-Joon;Kim, Sung-Shick;Ko, Kyoung-Suk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.2
    • /
    • pp.158-168
    • /
    • 2001
  • We present a tabu search (TS) algorithm to minimize maximum lateness on a single machine in the presence of sequence dependent setup times and dynamic job arrivals. The TS algorithm starts with a feasible schedule generated by a modified ATCS (Apparent Tardiness Cost with Setups) rule, then through a series of search steps it improves the initial schedule. Results of extensive computational experiments show that the TS algorithm significantly outperforms a well-known RHP heuristic by Ovacik and Uzsoy, both on the solutions quality and the computation time. The performance advantage is particularly pronounced when there is high competition among jobs for machine capacity.

  • PDF

Non-Identical Parallel Machine Scheduling with Sequence and Machine Dependent Setup Times Using Meta-Heuristic Algorithms

  • Joo, Cheol-Min;Kim, Byung-Soo
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.114-122
    • /
    • 2012
  • This paper considers a non-identical parallel machine scheduling problem with sequence and machine dependent setup times. The objective of this problem is to determine the allocation of jobs and the scheduling of each machine to minimize makespan. A mathematical model for optimal solution is derived. An in-depth analysis of the model shows that it is very complicated and difficult to obtain optimal solutions as the problem size becomes large. Therefore, two meta-heuristics, genetic algorithm (GA) and a new population-based evolutionary meta-heuristic called self-evolution algorithm (SEA), are proposed. The performances of the meta-heuristic algorithms are evaluated through compare with optimal solutions using randomly generated several examples.

Evaluation of long term shaft resistance of the reused driven pile in clay

  • Cui, Jifei;Rao, Pingping;Wu, Jian;Yang, Zhenkun
    • Geomechanics and Engineering
    • /
    • v.29 no.2
    • /
    • pp.171-182
    • /
    • 2022
  • Reusing the used pile has not yet been implemented due to the unpredictability of the bearing capacity evolution. This paper presents an analytic approach to estimate the sides shear setup after the dissipation of pore pressure. Long-term evolution of adjacent soil is simulated by viscoelastic-plastic constitutive model. Then, an innovative concept of quasi-overconsolidation is proposed to estimate the strength changes of surrounding soil. Total stress method (α method) is employed to evaluate the long term bearing capacity. Measured data of test piles in Louisiana and semi-logarithmic time function are cited to validate the effectiveness of the presented method. Comparisons illustrate that the presented approach gives a reasonably prediction of the side shear setup. Both the presented method and experiment show the shaft resistance increase by 30%-50%, and this highlight the potential benefit of piles reutilization.

A Scheduling Scheme for Restricted Parallel Machines with Cycling Process (반복 공정을 가지는 제약적 병렬기계에서의 일정 계획 수립)

  • Ko, Hyo-Heon;Baek, Jong-Kwan;Kang, Yong-Ha;Kim, Sung-Shick
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.107-119
    • /
    • 2004
  • A study on the following parallel machine problem is addressed in this research. An order is completed only when a given number of processes (cycle) are repeated. Anew cycle is possible only upon the completion of the previous cycle. Orders are classified into job group according to product feature. For a machine to switch to a different job group from the currently processing one a major setup is required while a minor setup time is inserted in between two jobs of the same job group. The objective of the study is to find a schedule that minimizes total weighted tardiness. An initial solution is obtained by the RATCS(Restricted Apparent Tardiness Cost with Setup) rule, and a Tabu search is applied to improve the solution. Numerical examples are also presented.

A Send-ahead Policy for a Semiconductor Wafer Fabrication Process

  • Moon, Ilkyeong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.1
    • /
    • pp.119-126
    • /
    • 1993
  • We study a manufacturing process that is quite common in semiconductor wafer fabrication of semiconductor chip production. A machine is used to process a job consisting of J wafers. Each job requires a setup, and the i$_{th}$ setup for a job is sucessful with probability P$_{i}$. The setup is prone to failure, which results in the loss of expensive wafers. Therefore, a tiral run is first conducted on a small batch. If the set up is successful, the test is passed and the balance of the job can be processed. If the setup is unsuccessful, the exposed wafers are lost to scrap and the mask is realigned. The process then repeats on the balance of the job. We call this as send-ahead policy and consider general policies in which the number of wafers that are sent shead depend on the cost of the raw wafer, the sequence of success probabilities, and the balance of the job. We model this process and determine the expected number of good wafers per job,the expected time to process a job, and the long run average throughput. An algorithm to minimize the cost per good wafer subject to a demand constraint is provided.d.d.

  • PDF

Performance Evaluation of control and management protocol for Dynamic lightpath setup based GMPLS network (GMPLS 기반의 동적 경로 설정을 위한 제어 및 관리 프로토콜 성능 평가)

  • Kim Kyoung-Mok;Oh Young-Hwan
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.41 no.12
    • /
    • pp.9-14
    • /
    • 2004
  • As the internet traffic type and size have bun diversified in recent years, the GMPLS-based distributed control and management protocol have surfaced as a serious issue for dynamic optical lightpath setup. In this reason, we investigated and analyzed network performance and protocols using global information-based link state approach and local information based link state approach. We calculated connection setup time, required control bandwidth and setup blocking probability that made from network update period and threshold metrics according to traffic arrival rate. The evaluated results will be used in broadband network and adopted for high speed network in the future widely.

Sequencing in Mixed Model Assembly Lines with Setup Time : A Tabu Search Approach (준비시간이 있는 혼합모델 조립라인의 제품투입순서 결정 : Tabu Search 기법 적용)

  • 김여근;현철주
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.13 no.1
    • /
    • pp.13-13
    • /
    • 1988
  • This paper considers the sequencing problem in mixed model assembly lines with hybrid workstation types and sequence-dependent setup times. Computation time is often a critical factor in choosing a method of determining the sequence. We develop a mathematical formulation of the problem to minimize the overall length of a line, and present a tabu search technique which can provide a near optimal solution in real time. The proposed technique is compared with a genetic algorithm and a branch-and-bound method. Experimental results are reported to demonstrate the efficiency of the technique.