A Scheduling Scheme for Restricted Parallel Machines with Cycling Process

반복 공정을 가지는 제약적 병렬기계에서의 일정 계획 수립

  • Ko, Hyo-Heon (Department of Industrial Systems and Information Engineering, Korea University) ;
  • Baek, Jong-Kwan (Department of Industrial System Management, Seoil College) ;
  • Kang, Yong-Ha (Department of Industrial Systems and Information Engineering, Korea University) ;
  • Kim, Sung-Shick (Department of Industrial Systems and Information Engineering, Korea University)
  • 고효헌 (고려대학교 산업시스템정보공학과) ;
  • 백종관 (서일대학 산업시스템 경영과) ;
  • 강용하 (고려대학교 산업시스템정보공학과) ;
  • 김성식 (고려대학교 산업시스템정보공학과)
  • Published : 2004.06.30

Abstract

A study on the following parallel machine problem is addressed in this research. An order is completed only when a given number of processes (cycle) are repeated. Anew cycle is possible only upon the completion of the previous cycle. Orders are classified into job group according to product feature. For a machine to switch to a different job group from the currently processing one a major setup is required while a minor setup time is inserted in between two jobs of the same job group. The objective of the study is to find a schedule that minimizes total weighted tardiness. An initial solution is obtained by the RATCS(Restricted Apparent Tardiness Cost with Setup) rule, and a Tabu search is applied to improve the solution. Numerical examples are also presented.

Keywords

References

  1. Baker, K. R. and Su, Z. S.(1974), "Sequencing with due-dates and early start times to minimize maximum tardiness", Naval Research Logistics Quarterly,21, 171-176
  2. Bitran, G. R. and Gilbert, S. M.(1990), "Sequencing Production on Parallel Machine with Two Magnitudes of Sequence-dependant Setup Cost", Journal of' Manufacturing and Operations Management, 3, 190-206
  3. Eom, D-H., Shin, H-J., Kwun, I-H., Shim J-K., and Kim, S-S.(2002), "Scheduling Jobs on Parallel Machines with Sequence Dependent Family Set-up Times", International Journal of Advanced Manufacturing Technology, 19, 926-932
  4. Garey, M. R. and Johnson, D. S.(1979), Computers and intractability: A guide to the theory ofNP completeness, San Francisco
  5. Islam A. and Eksioglu, M.(1997), "A tabu search approach for the single-machine mean tardiness problem," Journal of the Operational Research Society, 48(7),751-755 https://doi.org/10.1057/palgrave.jors.2600412
  6. James, R. J. W.(1997), "Using tabu search to solve the commondue date early/tardy machine scheduling problem," Computers and Operations research, 24(3), 199-208 https://doi.org/10.1016/S0305-0548(96)00052-4
  7. Kim, S. Y., Lee Y. H. and Agnihotri, O.(1995), "A hybrid approach to sequencing jobs using heuristic rules and neural networks," Production Planning& Control, 6, 445-454
  8. Kim S. C. and Bobrowski, P. M.(1994), Impact on sequence dependent setup time on job shop scheduling performance, International Journal of Production Research, 32(7), 1503-1520 https://doi.org/10.1080/00207549408957019
  9. Laguna, M., Barnes, J. W. and Glover, F.(1991), "Tabu search methods for single machine scheduling problem," Journal of Intelligent Manufacturing, 2, 63-74
  10. Lee, Y. H., Bhaskran, K. and Pinedo, M.(1997), "A heuristic to minimize the total weighted tardiness with sequence-dependent setups,"IIE Transactions, 29,45-52
  11. Lee, Y. H. and Pinedo, M.(1997), "Scheduling jobs on parallel machines with sequence-dependent setup times," European Journal of Operations Research, 100, 464-474
  12. Monma, C, and Potts. C. N.(1994), "Analysis of huristic for preemptive parallel machine scheduling with batch setup times," Operation Research, 32, 1243-1263
  13. Raman, N., Rachamadugu, R. V. and Talbot, F. B.(1989), "Realtime scheduling on an automated machine center," European Journal of Operational Research, 40, 222-242
  14. Schutten.T, M. J. and Leussink, R. A. M.(1996), "Parallel machine scheduling with release dates, due dates and family setup times," International Journal of Production Economics, 46, 119-126
  15. Shin H.-J., Kim S. S. and Ko K. S.(2001), "A Tabu Search Algorithm for single machines scheduling Problem with Job Release Times and Sequence-dependent Set up Times" Journal ofkorean Institute of Industrial Engineering, 27 , 2, 158-168
  16. So K. C.(1990), "Some heuristics for scheduling jobs on parallel machines with setup," Management Science, 36, 467-475
  17. Tang, C. S.(1990), "Scheduling batches on parallel machines with major and minor setups," European Journal of Operation Research, 46,28-3
  18. Tang, C. S. and Wittrock R. J.(1985), "Parallel machines scheduling with major and minor setups", York Town Heights, NY, RC 11412 IBM TJ Watson Research Center
  19. Vepsalainen, A. and Morton, T. E.(1987), "Priority rules and lead time estimation for job shop scheduling with weighted tardiness costs," Management Science, 33, 1036-1047