Heuristics for Non-Identical Parallel Machine Scheduling with Sequence Dependent Setup Times  

Koh, Shiegheun (Department of Systems Management and Engineering, Pukyong National University)
Mahardini, Karunia A. (Department of Systems Management and Engineering, Pukyong National University)
Publication Information
Journal of Korean Institute of Industrial Engineers / v.40, no.3, 2014 , pp. 305-312 More about this Journal
Abstract
This research deals with a problem that minimizes makespan in a non-identical parallel machine system with sequence and machine dependent setup times and machine dependent processing times. We first present a new mixed integer programming formulation for the problem, and using this formulation, one can easily find optimal solutions for small problems. However, since the problem is NP-hard and the size of a real problem is large, we propose four heuristic algorithms including genetic algorithm based heuristics to solve the practical big-size problems in a reasonable computational time. To assess the performance of the algorithms, we conduct a computational experiment, from which we found the heuristic algorithms show different performances as the problem characteristics are changed and the simple heuristics show better performances than genetic algorithm based heuristics for the case when the numbers of jobs and/or machines are large.
Keywords
Scheduling; Non-Identical Parallel Machine; Sequence Dependent Setup; Heuristic;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Zhu, Z. and Heady, R. B. (2000), Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach, Computers and Industrial Engineering, 38(2), 297-305.   DOI   ScienceOn
2 Tavakkoli-Moghaddam, R., Taheri, F., Bazzazi, F., Izadi, M., and Sassani, F. (2009), Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints, Computers and Operations Research, 36(12), 3224-3230.   DOI   ScienceOn
3 Vallada, E. and Ruiz, R. (2011), A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times, European Journal of Operational Research, 211(3), 612-622.   DOI   ScienceOn
4 Weng, M. X., Lu, J. and Ren, H. (2001), Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective, International Journal of Production Economics, 70(3), 215-226.   DOI   ScienceOn
5 Joo, C. M. and Kim, B. S. (2012a), Non-identical parallel machine scheduling with sequence and machine dependent setup times using metaheuristic algorithms, Industrial Engineering and Management Systems, 11(1), 114-122.   DOI
6 Gharehgozli, A. H., Tavakkoli-Moghaddam, R., and Zaerpour, N. (2009), A fuzzy-mixed integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates, Robotics and Computer-Integrated Manufacturing, 25 (4/5), 853-859.   DOI   ScienceOn
7 Guinet, A. (1990), Textile production systems : a succession of non-identical parallel processor shops, Journal of the Operational Research Society, 42(8), 655-671.
8 Hop, N. V. and Nagaur, N. N. (2004), The scheduling problem of PCBs for multiple non-identical parallel machines, European Journal of Operational Research, 158(3), 577-594.   DOI   ScienceOn
9 Joo, C. M. and Kim, B. S. (2012b), Genetic algorithm with an effective dispatching method for unrelated parallel machine scheduling with sequence dependent and machine dependent setup times, IE Interfaces, 25(3), 357-364.   과학기술학회마을   DOI   ScienceOn
10 Kang, Y. H., Lee, H. C. and Kim, S. S. (1998), Scheduling for non-identical parallel machines with different due dates, Journal of the Korean Institute of Industrial Engineers, 24(1), 37-50.
11 Lee, J. S. and Park, S. H. (1999), Scheduling for two stage mixed flow production system with non-identical parallel machines, Journal of the Korean Institute of Industrial Engineers, 25(2), 254-265.
12 Li, K. and Yang, S. L. (2009), Non-identical parallel-machine scheduling research with minimizing total weighted completion times : Models, relaxations and algorithms, Applied Mathematical Modelling, 33(4), 2145-2158.   DOI   ScienceOn
13 Marsh, J. D. and Montgomery, D. C. (1973), Optimal procedure for scheduling jobs with sequence-dependent changeover times on parallel processors, AIIE Technical Papers, 279-286.
14 Allahverdi, A., Ng, C. T., Cheng, T. C. E., and Kovalyov, M. Y. (2008), A survey of scheduling problems with setup times or costs, European Journal of Operational Research, 187(3), 985-1032.   DOI   ScienceOn
15 Potts, C. N. and Kovalyov, M. Y. (2000), Scheduling with batching : A review, European Journal of Operational Research, 120(2), 228-249.   DOI   ScienceOn
16 Ruiz, R. and Vazquez-Rodriguez, J. A. (2010), The hybrid flow shop scheduling problem, European Journal of Operational Research, 205(1), 1-18.   DOI   ScienceOn
17 Allahverdi, A., Gupta, J. N. D. and Aldowaisan, T. (1999), A review of scheduling research involving setup considerations, OMEGA The International Journal of Management Science, 27(2), 219-239.   DOI   ScienceOn
18 Cheng, T. C. E. and Sin, C. C. S. (1990), A state-of-the-art review of parallel-machine scheduling research, European Journal of Operational Research, 47(3), 271-292.   DOI   ScienceOn
19 Agarwal, A., Colak, S., Jacob, V. S., and Pirkul, H. (2006), Heuristics and augmented neural networks for task scheduling with non-identical machines, European Journal of Operational Research, 175(1), 296-317.   DOI   ScienceOn