• Title/Summary/Keyword: Series System Reliability

Search Result 285, Processing Time 0.023 seconds

Simplification of Monte Carlo Techniques for the Estimation of Expected Benefits in Stochastic Ananlysis of Multiple Reservoir Systems (저수지군으로부터 기대편익 산정을 위한 Monte Carlo 기법의 간략화)

  • 이광만;고석구
    • Water for future
    • /
    • v.26 no.2
    • /
    • pp.89-97
    • /
    • 1993
  • For the system benefit optimization by considering risk or reliability from a multiple reservoir system using the Monte Carlo technique, many stochastically generated inflow series have to be used for the system analysis. In this study, the stochastically generated inflow series for the multiple reservoir system operation are preprocessed according to the considered system objectives and operating time periods. Through this procedure, several representative inflow series which have discrete probability levels and operation horizons are selected among the thousands of generated inflows. Then a deterministic optimization technique is applied to the power energy estimation from the Han River Reservoirs System which considers five reservoirs in the study. It took much lower computational requirements then using the original Monte Carlo Technique, even though estimated result was almost similar.

  • PDF

Optimal Reliability Strategy for k-out-of-n System Considering Redundancy and Maintenance (중복설계 및 예방정비를 고려한 수리가능 k-out-of-n 시스템 신뢰도 최적화 전략)

  • Lee, Youn-Ho;Jung, Kwang-Kyun;Yoon, Tae-Dong;Kwon, Ki-Sang
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.1
    • /
    • pp.118-127
    • /
    • 2014
  • The configuration such as series, parallel and k-out-of-n of a repairable system directly affects its reliability. The maintenance strategy can also affect the overall performance of the system. The objective of this work is to investigate the possible trade-off between the configuration of a repairable k-out-of-n system and its maintenance strategy. The redundancy is considered to be the design decision variables, whereas the preventive maintenance period is considered to be the maintenance decision variables. The optimization model is used to minimize the overall life cycle cost associated with the system, considering constraint on reliability. Finally, genetic algorithm is used to find the optimal values for the decision variables. The result is compared with optimal values for considering redundancy and maintenance respectively.

Reliability-based Design Method of Concrete Armour Units with Structural Stability (구조적 안정성을 고려한 콘크리트 피복재의 신뢰성 설계)

  • Lee Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.16 no.3
    • /
    • pp.142-151
    • /
    • 2004
  • A method for the determination of concrete armor unit weights with hydraulic stability and structural stability may be formulated in this paper. The hydraulic stability is analyzed by using Hudson's formula, the structural stability is also studied by evaluation of maximum flexural tensile stresses in armor unit induced by the impact loads and by comparison of those with the tensile resistance strength directly. The applicable criteria for concrete armor units can be represented as a function of design wave heights with return period, armor weights, and tensile strengths for the practical uses. In addition, reliability analyses for two failure modes are carried out to take into account some uncertainties. Finally, a series system for two-failure mode analysis can be made up straightforwardly, by which the optimal weights of armor units can be estimated with the various relative breakages, given the specific target probability of failure under the concepts of reliability-based design method.

A Study of 450 kHz Induction Heating System for CRT Manufacturing (450 kHz 브라운관 제조용 유도가열 전원장치 개발연구)

  • Yoo, D.W.;Beak, J.W.;Joe, K.Y.;Kim, Y.H.;Jeon, W.S.
    • Proceedings of the KIEE Conference
    • /
    • 1993.07b
    • /
    • pp.689-691
    • /
    • 1993
  • This paper describes an induction heating system which is developed for CRT manufacturing. This system consists of a buck chewer, a voltage source full-bridge inverter, and a series resonant circuit with a matching transformer. A series resonant scheme is employed, and operated at the zero phase of the resonant load by PLL. This ensures maximum power transfer, good efficiency and reliability of the system. Implementation of a prototype rated of 3 kW 450 kHz is described and experimental results are given.

  • PDF

Assessment of System Reliability and Capacity-Rating of Composite Steel Box-Girder Highway Bridges (합성 강 상자형 도로교의 체계신뢰성 해석 및 안전도평가)

  • Cho, Hyo Nam;Lee, Seung Jae;Kang, Kyoung Koo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.2
    • /
    • pp.51-59
    • /
    • 1993
  • This paper develops practical and realistic reliability models and methods for the evaluation of system-reliability and system reliability-based rating of various types of box-girder bridge superstructures. The strength limit state model for box-girder bridges suggested in the paper are based on not only the basic flexural strength but also the strength interaction equations which simultaneously take into account flexure, shear and torsion. And the system reliability problem of box-girder superstructure is formulated as parallel-series models obtained from the FMA(Failure Mode Approach) based on major failure mechanisms or critical failure states of each girder. In the paper, an improved IST(Importance Sampling Technique) simulation algorithm is used for the system reliability analysis of the proposed models. This paper proposes a practical but rational approach for the evaluation of capacity rating in terms of the equivalent system-capacity rating corresponding to the estimated system-reliability index which is derived based on the concept of the equivalent FOSM(First Order Second Moment) form of system reliability index. The results of the reliability evaluation and rating of existing bridges indicate that the reserved reliability and capacity rating at system level are significantly different from those of element reliability or conventional methods especially in the case of highly redundant box-girder bridges.

  • PDF

Development of a microcontroller-based control system for a total artificial heart (완전이식 인공심장을 위한 제어시스템의 개발에 관한 연구)

  • Choi, Won-Woo;Park, Seong-Keun;Kim, Hee-Chan;Min, Byeong-Gu
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.1 no.2
    • /
    • pp.127-134
    • /
    • 1995
  • For use in patients with severe forms of heart disease for which no surgical repair is possible, development of artificial hearts has many importance in point of economics, medical and industrial applications. To provide a sufficient cardiac output to the physiological demands of circulatory systems is the objective of control systems for an electromechanical artificial heart, which is based on the stable controller design for the motor in the artificial heart. In this paper, an implantable microcontroller-based brushless DC motor control system with the implantability, reliability, and stability is introduced. The developed control system for the artificial heart has the following advantages: (1) It is possible to be implanted in a body by realizing the fundamental functions such as a motor speed detection, proportional-intergral control, timer, and PWM generation through a software programming. (2) Thus, the power consumed in the controller is reduced. (3) The reliability and stability are improved through the reduction of electronic parts and line connetions at the controller. The performance of the artificial hearts and control system developed was evaluated through a series of mock circulatory experiments and a reliability test for one and half years. A sheep with the artificial heart and control system was survived for three days.

  • PDF

A New Initial Value for Solving Redundancy Optimization Problems (중복설계 최적화문제의 새로운 초기 값 설정에 관한 연구)

  • 이도경;이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.15 no.25
    • /
    • pp.11-14
    • /
    • 1992
  • This paper presents a method for establishing an initial value of redundancy optimization problem to maximize system reliability of multiconstraint mixed parallel-series system. The constraints not be linear. This paper proposes a new initial value which is near to optimal solution by considering the relative median rate of the unreliability and amount of consumed resources for each subsystem. To show the efficiency of this model. numerical example and comparison with Narasimhalu is illustrated in chapter 4.

  • PDF

An efficient simulation method for reliability analysis of systems with expensive-to-evaluate performance functions

  • Azar, Bahman Farahmand;Hadidi, Ali;Rafiee, Amin
    • Structural Engineering and Mechanics
    • /
    • v.55 no.5
    • /
    • pp.979-999
    • /
    • 2015
  • This paper proposes a novel reliability analysis method which computes reliability index, most probable point and probability of failure of uncertain systems more efficiently and accurately with compared to Monte Carlo, first-order reliability and response surface methods. It consists of Initial and Simulation steps. In Initial step, a number of space-filling designs are selected throughout the variables space, and then in Simulation step, performances of most of samples are estimated via interpolation using the space-filling designs, and only for a small number of the samples actual performance function is used for evaluation. In better words, doing so, we use a simple interpolation function called "reduced" function instead of the actual expensive-to-evaluate performance function of the system to evaluate most of samples. By using such a reduced function, total number of evaluations of actual performance is significantly reduced; hence, the method can be called Reduced Function Evaluations method. Reliabilities of six examples including series and parallel systems with multiple failure modes with truncated and/or non-truncated random variables are analyzed to demonstrate efficiency, accuracy and robustness of proposed method. In addition, a reliability-based design optimization algorithm is proposed and an example is solved to show its good performance.

A Study on the Life Cycle Cost Evaluation of the Conventional Auxiliary Power Unit for 8200 Series Electric Locomotive (8200호대 전기기관차용 기존품 보조전원장치의 수명주기비용 평가에 관한 연구)

  • Lee, Kye-Seung;Kim, Wan-il;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.2
    • /
    • pp.331-336
    • /
    • 2018
  • In this paper, the life cycle cost of the auxiliary power unit in the conventional 8200 series electric locomotive is evaluated and an effective life cycle cost reduction method is sought. For this, a life cycle cost evaluation model was proposed using IEC 60300-3-3 standard. As a result of analysis, material cost which accounted for a large percentage of preventive maintenance cost, accounted for 64% of total cost, and breakdown maintenance cost was as high as 27%. Except for the cost of preventive maintenance, the breakdown maintenance cost ratio was the highest. In order to reduce the LCC of the auxiliary power unit(APU) of the 8200 series in the future, it is necessary to reduce the material cost in case of development and to secure the high reliability according to the parts manufacturing so as to minimize the maintenance cost.

A Study on the Life Cycle Establishment and Improvement of Main Parts for Electric Locomotive (전기기관차 주요부품의 수명주기 설정 및 개선방안에 관한 연구)

  • Lee, Doek Koo;Lee, Hi Sung
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.2
    • /
    • pp.1-9
    • /
    • 2021
  • The 8200-unit electric locomotive, which is a high-efficiency multipurpose electric locomotive, is a German model, namely BR152 series ES64F, and it is manufactured to suit the operating conditions in Korea. Since 2003, 83 locomotives have been introduced in Korea, and they have been operating in the general railway sector for both passenger and freight transport. Although more than 15 years have passed since their first introduction, owing to the characteristics of vehicles introduced overseas, responding promptly to failures has been difficult owing to problems related to factors such as transfer of technology and procurement of parts for maintenance. Furthermore, there have been difficulties in operating the locomotives on the basis of the manufacturer-recommended time-between-overhaul (TBO) cycle. Therefore, a new TBO should be determined. To support the development of a reliability-based maintenance system, this study conducted a reliability and TBO analysis by using failure data obtained from KOVIS, and future management measures are presented.