1 |
Ministry of Land, Infrastructure and Transport, Railway Accident Investigation Report, Report Number : APAIB/R 2014-8, Aviation and Railway Accident Investigation Board.
|
2 |
J. H. Hwang, J. T. Jung and C. S. Kim, "Evaluation of Optimal Time Between Overhaul Period of the Traction Motor for High-Speed Railway Vehicle", Proceedings of The Korean Society of Railway Spring Conference(in Korean), 2016.
|
3 |
J. T. Jung and C. S. Kim, "A Study on Evaluation of the Economic Overhaul for Transmission of the High Speed Train", Proceedings of The Korean Society of Railway Spring Conference, pp. 1209-1304, 2015.
|
4 |
J. T. Jung and C. S. Kim, "Evaluation of Optimal Time Between Overhaul Period of the First Driving Devices for High-Speed Railway Vehicle", Journal of the Korea Academia-Industrial Cooperation Society, Vol. 16, No. 12 pp. 8700-870, 2015.
DOI
|
5 |
I. S. Kim, "A Study on the Conformity of KTX Oil Damper TBO", Master's Thesis, Seoul National University of Science and Technology, 2015.
|
6 |
KORAIL Human Resources Development Institute, "Textbook of 8200 Type Electric Locomotive", 2014.
|
7 |
KORAIL, Rules for Maintenance of Rolling Stock, 2018.
|
8 |
Y. K. Choi, "A Research on the Optimal Service Life of Inverter System in EMU", Master's Thesis, Seoul National University of Science and Technology, 2019.
|
9 |
Ministry of Land, Infrastructure and Transport, Railway Accident Investigation Report, Report Number : APAIB/R 2011-2, Aviation and Railway Accident Investigation Board.
|
10 |
D. S. Sim, T. H. Heo, Y. I. Park, H. S. Kim, K. H. Shin and S. K. Cheong, "Estimation of the Overhaul Cycle Time for KTX Wheelset Bearing by RCF Test", J. Korean of Soc. Saf., Vol. 31, No 1, pp. 13-18, 2016.
DOI
|
11 |
Y. H. Cho, H. W. Lee, J. W. Kim and J. M. Yans, "Development of Reliability Management System for Vehicle Component in Korea Railway Corporations", Journal of Transactions of the Korean Society of Mechanical Engineers A, Vol. 43, No. 4, pp. 267-275, 2019.
DOI
|