• Title/Summary/Keyword: Schematic Design Stage

Search Result 35, Processing Time 0.026 seconds

Representation of Rebar using IFC at Schematic Structural Design Stage (기술초대석 I - IFC를 이용한 기본설계단계 철근배근의 표현)

  • Jeong, Jong-Hyeon;Kim, Chi-Gyeong;Kim, Ji-Hyeon
    • 건축구조
    • /
    • v.19 no.4
    • /
    • pp.51-60
    • /
    • 2012
  • In recent years, BIM has been applied to many building projects. However, IFC, which is the core technology of data exchange in BIM, has not been used widely. In particular, IFC has almost never been used to represent rebars in RC structures. This is because the lack of understanding and utilization strategy for data model of IFC on rebars. The purpose of this study is to store and manage the data on rebars using IFC at the schematic design stage. For this, we investigated the data to represent rebars for RC members, such as beam, column, wall, and slab at the schematic design stage. And, we analyzed the data model of IFC on rebars at the schematic design stage. Based on these investigation and analysis on data, we proposed the strategy for utilization of the data model of IFC on rebars. Finally, for verification, we generated a sample IFC file to represent the rebars of a simple RC structure according to the proposed strategy and imported the sample IFC file into the software, which we developed for this study. Based on the results of the import, we concluded that the data on rebars can be stored and managed using the proposed strategy for utilization of the data model of IFC on rebars.

  • PDF

Planning Organizations and Planning Process of To(道) and Pu(府) Government Office Buildings under the Rule of Japanese Imperialism (일제강점기 도청사.부청사의 설계주체와 설계과정)

  • Kim, Myung-Sun
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.2
    • /
    • pp.102-109
    • /
    • 2011
  • Under the rule of Japanese Imperialism, there were two kinds of architectural government organizations inside the Chosun(朝鮮) Governor-General which designed To(道) and Pu(府) government office buildings; one was the organization inside the central government office and the other inside the local government offices(To and Pu). By the administrative approval procedure of the Chosun Governor-General, the local architectural organization planned site and floors of the building in the schematic design stage, and in the detail design stage not only the central but sometimes the local planned the building design. The design accomplished by the local in schematic stage was believed as a kind of guideline in detail design and the local organization was able to insist their own needs to the central and to change the central's planning. Even though the central had the authority of the design, the local took part in the planning of To and Pu government office buildings at least in the schematic design stage.

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage

  • Choi, Jungsik;Kim, Hansaem;Kim, Inhan
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.16-25
    • /
    • 2015
  • Since construction projects are large and complex, it is especially important to provide concurrent construction process to BIM models with construction automation. In particular, the schematic Quantity Take-Off (QTO) estimation on the BIM models is a strategy, which can be used to assist decision making in just minutes, because 70-80% of construction costs are determined by designers' decisions in the early design stage. This paper suggests a QTO process and a QTO prototype system within the building frame of Open BIM to improve the low reliability of estimation in the early design stage. The research consists of the following four steps: (1) analyzing Level of Detail (LOD) at the early design stage to apply to the QTO process and system, (2) BIM modeling for Open BIM based QTO, (3) checking the quality of the BIM model based on the checklist for applying to QTO and improving constructability, and (4) developing and verifying a QTO prototype system. The proposed QTO system is useful for improving the reliability of schematic estimation through decreasing risk factors and shortening time required.

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

A Research on the Parametric Design Method in Schematic Design Phase for BIM application - Focused on Subject Classroom Design of Variation Type - (BIM 적용을 위한 계획설계 단계의 파라메트릭 설계방법에 관한 연구 - 교과교실제 설계를 중심으로 -)

  • Yun, Yong-G.;Kang, Tae-Woong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.20 no.5
    • /
    • pp.11-18
    • /
    • 2013
  • This study has revisited the definition and characteristics of BIM to contribute to the better understanding of this concept. For the successful application of BIM in architectural design field, it should start with public buildings like schools which can be standardized. Since a number of conditions of school design appear to suit the schematic design phase for BIM application more than do other types of building design, the viability of BIM was examined by applying parametric modeling(one of BIM's basic characteristics) to mass study in schematic design phase for the configuration of schools that adopt the variation type of subject classroom design of the $7^{th}$ National Educational Curriculum. In addition, this modeling technique was used with software of Rhino 3D and Grasshopper, which will have a linkage to environmental analysis in near future. Finally, it can be expected that the work efficiency will be maximized if BIM is going to be applied in the early design stage instead of the end stage.

The Development of Automatic Schematic Generator (스키메틱 자동생성기의 개발)

  • 배영환;백영석;박성범;이성봉;장영조;이현찬
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.28A no.9
    • /
    • pp.761-773
    • /
    • 1991
  • In this paper, an algorithm for automatic schematic generation which creates schematic diagram from netlist are proposed. The important objectives on schematic generation are readability and clarity of resulting schematics. Each stage of generation should aim at enhancing these objectives. For this reason, schematic generation problem is divided into 5 subproblems` preprocessing, logical placement, pin assignment and improvement of placement, global routing, and detailed routing. The algorithm is implemented in C language, and it generates schematics from the results of logic synthesis in order to make it east for designers to understand the design and reflect their knowledge into design.

  • PDF

A Schematic Design Study for Galhyeon Elementary.Middle School in Gwacheon (果川(과천) 갈현 초(初).중학교(中學校) 계획설계(計劃設計) 연구(硏究))

  • Yim, Chang-Bok;Suh, Ki-Young;Jung, Jin-Kuk
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.10 no.1
    • /
    • pp.54-65
    • /
    • 2003
  • This paper aims to analyse design conditions and propose schematic design for Galhyeon Elementary Middle School in Gwacheon. As for site conditions, it has the size of $32,000m^2$ and Hilly areas. And the area is surrounded high density housing. As a program, Education Facilities Bureau required to provide 36 classes and supporting facilities. To design the schemes, we followed the 7th education policy guidelines. During the design development stage, 3 alternatives are suggested as in the paper. However, staffs of Education Bureau and teachers favoured and selected our scheme, which gives symbolic image, as a new high school education environment.