Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs

오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델

  • 박성호 (서울시립대학교 대학원 건축공학과) ;
  • 구교진 (서울시립대학교 건축학부) ;
  • 박성철 (서울시립대학교 대학원 건축공학과)
  • Published : 2008.11.14

Abstract

For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

Keywords