• 제목/요약/키워드: Scheduling System

검색결과 2,160건 처리시간 0.028초

조선 산업에서의 정반배치 계획시스템 개발의 효율화에 관한 연구

  • 박주호;박주철
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.283-285
    • /
    • 2001
  • The most work-space invest much time and labor for optimal arrangement. The work-plates of the work-space should be arranged, processed and assembled under the restricted work space. The optimal arrangement under the terms of a restriction arrange the maximum work-plates in appointed work-space. It's the central aim. The work-plates arrangement scheduling of the most work-space are achieved through the experience of the planner. Like this, if the work-plates arrangement is worked by hand, there spend much time for the training planner. And the burden of the personnel expenses occur for using the master worker, also there are dangerous factors to be able to bring the bottleneck circumstance for the process planning, because the quick work planning does not accomplish. With such problems, the biggest problem is inferior the value of the plan. For solved the such problem of hand-operating, some work-spaces developed and used the work-plate arrangement scheduling system for the special quality of themselves. This paper make research into a plan to develop the work-plate arrangement scheduling system efficiently.

  • PDF

프레스 라인 적정 로트 크기의 결정에 관한 사례 연구 (A Case Study of an Optimum Lot Size of Press Line)

  • 김연민
    • 산업공학
    • /
    • 제24권3호
    • /
    • pp.241-247
    • /
    • 2011
  • This paper develops a mathematical model which searches an optimum lot size of a press line, and applies this model to the scheduling of the press line. This mathematical model is not a widely studied cost model but a model which considers the utilization of the press line under a lean production system. In this paper, the optimum lot size is a minimum lot size which does not exceed the total work time of the press line. A production volume and the priority of the production in the press line are adjusted using this optimum lot size. A mathematical model developed in this paper will allow determining the optimum lot size easily in case of variable production environments such as an introduction of a new product and a fluctuation of production volume of each item. Therefore, our model will make a better scheduling of the press line and will enhance the utilization of it.

Generation Scheduling with Large-Scale Wind Farms using Grey Wolf Optimization

  • Saravanan, R.;Subramanian, S.;Dharmalingam, V.;Ganesan, S.
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1348-1356
    • /
    • 2017
  • Integration of wind generators with the conventional power plants will raise operational challenges to the electric power utilities due to the uncertainty of wind availability. Thus, the Generation Scheduling (GS) among the online generating units has become crucial. This process can be formulated mathematically as an optimization problem. The GS problem of wind integrated power system is inherently complex because the formulation involves non-linear operational characteristics of generating units, system and operational constraints. As the robust tool is viable to address the chosen problem, the modern bio-inspired algorithm namely, Grey Wolf Optimization (GWO) algorithm is chosen as the main optimization tool. The intended algorithm is implemented on the standard test systems and the attained numerical results are compared with the earlier reports. The comparison clearly indicates the intended tool is robust and a promising alternative for solving GS problems.

객체에 근거한 선호도 제약 중심 스케줄링 언어와 성능향상 기법 (An object-based preference-driven scheduling language and techniques for improving its perforance)

  • 이기철;문정모;송성헌
    • 경영과학
    • /
    • 제12권2호
    • /
    • pp.43-62
    • /
    • 1995
  • For a complex scheduling system like time table construction, its optimal solution, if exists, is hard to obtain. In this paper, the scheduling environment is reasonably confined as where objects have their own events competing for better slots on boards, and objects have their own board slot preferences and belong to one or more classes of the society which globally constrains them. Here, two phase method is suggested, where the first phase is human-like preference driven and the second phase is for fine tuning by considering all the factors given. Designed and implemented in our system HI-SCHED are dynamic object switching, temporal-constraint-driven intelligent backtracking, case-based revisions, object-based approach, and so on. Some satisfaction degrees are also defined to measure the usefulness of our method. In addition, look-ahead dynamic object switching is considered, and additional global constraints are introduced and processed. A simple scheme is also used to verify the usefulness of the post processing scheme.

  • PDF

경쟁시장에서 발/송전설비 예방정비계획에 관한 연구 (Generation & transmission maintenance scheduling in competitive power markets)

  • 한석만;김경민;박중성;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.798-800
    • /
    • 2005
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos & Transco in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. We propose a two-layer mathematical algorithm amenable to maintenance scheduling problem into master problem and sub-problem. The master problem coordinates the scheduling, and sub-problem, DC optimal power flew, checks the adequacy. The proposed algorithm was demonstrated with a case study.

  • PDF

Intelligent Vehicle Management Using Location-Based Control with Dispatching and Geographic Information

  • Kim Dong-Ho;Kim Jin-Suk
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2004년도 Proceedings of ISRS 2004
    • /
    • pp.249-252
    • /
    • 2004
  • The automatic determination of vehicle operation status as well as continuous tracking of vehicle location with intelligent management is one of major elements to achieve the goals. Especially, vehicle operation status can only be analyzed in terms of expert experiences with real-time location data with scheduling information. However the scheduling information of individual vehicle is very difficult to be interpreted immediately because there are hundreds of thousand vehicles are run at the same time in the national wide range workplace. In this paper, we propose the location-based knowledge management system(LKMs) using the active trajectory analysis method with routing and scheduling information to cope with the problems. This system uses an inference technology with dispatching and geographic information to generate the logistics knowledge that can be furnished to the manager in the central vehicle monitoring and controlling center.

  • PDF

멀티코어 시스템의 안정성 향상을 위한 피크파워 제어 알고리즘 (Peak Power Control for Improvement of Stability in Multi-core System)

  • 박성환;김재환;안병규;정일종;이석희;정정화
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2008년도 하계종합학술대회
    • /
    • pp.747-748
    • /
    • 2008
  • In this paper, we propose a new algorithm for task scheduling consisting of subtask partitioning and subtask priority scheduling steps in order to keep the peak power under the system specification. The subtask partitioning stepis performed to minimize the idle operation time for processors by dividing a task into multiple subtasks using the least square method developed with power consumption pattern of tasks. In the subtask priority scheduling step, a priority is assigned to a subtask based on the power requirement and the power variation of subtask so that the peak power violation can be minimized and the task can be completed within the execution time deadline.

  • PDF

SCATOMi : Scheduling Driven Circuit Partitioning Algorithm for Multiple FPGAs using Time-multiplexed, Off-chip, Multicasting Interconnection Architecture

  • Young-Su kwon;Kyung, Chong-Min
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2003년도 하계종합학술대회 논문집 II
    • /
    • pp.823-826
    • /
    • 2003
  • FPGA-based logic emulator with lane gate capacity generally comprises a large number of FPGAs connected in mesh or crossbar topology. However, gate utilization of FPGAs and speed of emulation are limited by the number of signal pins among FPGAs and the interconnection architecture of the logic emulator. The time-multiplexing of interconnection wires is required for multi-FPGA system incorporating several state-of-the-art FPGAs. This paper proposes a circuit partitioning algorithm called SCATOMi(SCheduling driven Algorithm for TOMi)for multi-FPGA system incorporating four to eight FPGAs where FPGAs are interconnected through TOMi(Time-multiplexed, Off-chip, Multicasting interconnection). SCATOMi improves the performance of TOMi architecture by limiting the number of inter-FPGA signal transfers on the critical path and considering the scheduling of inter-FPGA signal transfers. The performance of the partitioning result of SCATOMi is 5.5 times faster than traditional partitioning algorithms. Architecture comparison show that the pin count is reduced to 15.2%-81.3% while the critical path delay is reduced to 46.1%-67.6% compared to traditional architectures.

  • PDF

메시지 스케줄링을 이용한 Brake-by-wire 시스템의 Redundancy Management (Redundancy Management of Brake-by-wire System using a Message Scheduling)

  • 윤종운;김기웅;김태열;김재구;이석
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2000년도 추계학술대회 논문집
    • /
    • pp.717-720
    • /
    • 2000
  • Event-driven communication protocols such as CAN(Controller Area Network) have inherent packet delays due to the contention process for the use of network medium. These delays are stochastic in nature because most packets arrive at random time instants. The stochastic property of the delay adversely influences the control system's performance in terms of stability, responsiveness and steady-state error. Another problem for safety-critical application such as brake-by-wire systems is the reliability of the communication modules that can fail abruptly. This paper deals with two methods to overcome the above problems : (i) scheduling method that can maintain packet delays under some acceptable level, and (ii) redundancy management of communication modules that prescribes dual-redundancy modules' behavior when one of them fails.

  • PDF

두단계 조립시스템에서의 일정계획문제에 관한 소고 (A Note on the Scheduling Problem in the Two-stage Assembly-type Flowshop)

  • 윤상흠;김호준;권수태
    • 산업경영시스템학회지
    • /
    • 제27권2호
    • /
    • pp.24-28
    • /
    • 2004
  • This paper considers a scheduling problem concerned with an assembly system where two components are first treated In their own parallel machines and then pulled to be assembled into a final product at a single assembly machine. The objective measure is the mean completion time of jobs(a finite number of products). Through characterizing solution properties, we obtain the worst case error bounds of an arbitrary permutation and a SPT based heuristic.