• Title/Summary/Keyword: Schedule Planning

Search Result 362, Processing Time 0.026 seconds

Evaluation of Train Capacity Pattern Considering Customer Demands (고객수요를 고려한 열차용량패턴에 관한 연구)

  • Kim Dong-Hee;Kim Seong-Ho;Hong Sun-Heum
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.507-513
    • /
    • 2004
  • In the railway system, transportation plan corresponds to a m aster plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the railway operation company, and it includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In these sub- planning processes, train can be con side red as a product for providing customer services, and customer demands and operational advantages must be considered. In this paper, we present an effect estimation system for the train capacity pattern in a train schedule, and the effect of capacity pattern can be expressed as minimum spilled demand, minimum train service cost, and maximum train revenue or profit.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Scheduling Management Agent using Bayesian Network based on Location Awareness (베이지안 네트워크를 이용한 위치인식 기반 일정관리 에이전트)

  • Yeon, Sun-Jung;Hwang, Hye-Jeong;Lee, Sang-Yong
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.21 no.6
    • /
    • pp.712-717
    • /
    • 2011
  • Recently, diverse schedule management agents are being researched for the efficient schedule management of smart devices users, but they remain at a confirmatory level. In order to efficiently manage user's schedules, execution of planned schedules should be monitored to help users properly execute their schedules, or feedback must be given so that when setting up new schedules, users can plan their schedule according to their schedule establishment patterns. This research proposes a schedule management agent that infers the user's behaviors by using acquired user context, and provides schedule related feedback depending on the user's behavior patterns, when users are executing their schedules or planning new schedules. For this, collected user context information is preprocessed and user's behavior is inferred by Bayesian network. Also, in order to provide feedbacks necessary for confirming the user's schedule execution and new schedule establishment, a context tree pattern matching method for the user's schedule, location and time contexts was applied, then verified with 6 weeks of user simulation in a mobile environment.

A Stay Detection Algorithm Using GPS Trajectory and Points of Interest Data

  • Eunchong Koh;Changhoon Lyu;Goya Choi;Kye-Dong Jung;Soonchul Kwon;Chigon Hwang
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.3
    • /
    • pp.176-184
    • /
    • 2023
  • Points of interest (POIs) are widely used in tourism recommendations and to provide information about areas of interest. Currently, situation judgement using POI and GPS data is mainly rule-based. However, this approach has the limitation that inferences can only be made using predefined POI information. In this study, we propose an algorithm that uses POI data, GPS data, and schedule information to calculate the current speed, location, schedule matching, movement trajectory, and POI coverage, and uses machine learning to determine whether to stay or go. Based on the input data, the clustered information is labelled by k-means algorithm as unsupervised learning. This result is trained as the input vector of the SVM model to calculate the probability of moving and staying. Therefore, in this study, we implemented an algorithm that can adjust the schedule using the travel schedule, POI data, and GPS information. The results show that the algorithm does not rely on predefined information, but can make judgements using GPS data and POI data in real time, which is more flexible and reliable than traditional rule-based approaches. Therefore, this study can optimize tourism scheduling. Therefore, the stay detection algorithm using GPS movement trajectories and POIs developed in this study provides important information for tourism schedule planning and is expected to provide much value for tourism services.

A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

Study on the Optimum Route Travel Time for Bus to Improve Bus Schedule Reliability (정시성 확보를 위한 버스노선 당 적정 운행시간 산정 연구)

  • Kim, Min ju;Lee, Young ihn
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.6
    • /
    • pp.112-123
    • /
    • 2017
  • The accurate forecasting of the public transportation's transit and arrival time has become increasingly important as more people use buses and subways instead of personal vehicles under the government's public transportation promotion policy. Using bus management system (BMS) data, which provide information on the real-time bus location, operation interval, and operation history, it is now possible to analyze the bus schedule reliability. However, the punctuality should always be considered together with the operation safety. Therefore, this study suggests a new methodology to secure both reliability and safety using the BMS data. Unlike other studies, we calculated the bus travel time between two bus stops by dividing the total travel length into 6 sections using 5 different measuring points. In addition, the optimal travel time for each bus route was proposed by analyzing the mean, standard deviation and coefficient of variation of the each section's measurement. This will ensure the reliability, safety and mobility of the bus operation.

Countable-grid Scheduling Method (CSM) and CSM-based Soft-logic Algorithm Development for Automated Construction Scheduling and Visualization (건설 공정계획 자동화와 시각화를 위한 가산 그리드 공정계획 기법(CSM)과 CSM기반 소프트로직 알고리즘 개발 연구)

  • Choi, Heungsoon;Moon, Seonghyeon;Chi, Seokho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.65-77
    • /
    • 2022
  • Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process.

Development of Route Planning System for Intermodal Transportation Based on an Agent Collecting Schedule Information (운송스케줄 정보수집 에이전트 기반 복합운송 경로계획 시스템)

  • Choi, Hyung-Rim;Kim, Hyun-Soo;Park, Byung-Joo;Kang, Moo-Hong
    • Information Systems Review
    • /
    • v.10 no.1
    • /
    • pp.115-133
    • /
    • 2008
  • The third-party logistics industry mainly delivers goods from a place to an arrival place on behalf of the freight owner. To handle the work, they need a transportation route including transportation equipment between the starting place and the arrival place, schedule information for departure/arrival and transportation cost. Actually, automatic searching for an optimal transportation route, which considers arrival and departure points for intermodal transportation, is not a simple problem. To search efficiently transportation route, the collection of schedule information for intermodal transportation and transportation route generation have become critical and vital issues for logistics companies. Usually, they manually make a plan for a transportation route by their experience. Because of this, they are limited in their ability if there is too much cargo volume and a great many transactions. Furthermore, their dependence on the conventional way in doing business causes an inefficient selection of transporters or transportation routes. Also, it fails to provide diverse alternatives for transportation routes to the customers, and as a result, increases logistics costs. In an effort to solve these problems, this study aims to develop a route planning system based on agent, which can collect scattered schedule information on the Web. The route planning system also has an algorithm for transportation route generation in intermodal transportation.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

Capacity-Filtering Algorithm based Release Planning Method for TFT-LCD Fab (생산능력 필터링 알고리즘 기반의 TFT-LCD Fab 투입계획 생성 방법론)

  • Son, Hak-Soo;Lee, Ho-Yeoul;Choi, Byoung-Kyu
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.1-9
    • /
    • 2009
  • As the LCD fabrication factories (Fab) are highly capital-intensive and the markets are very competitive, it is an essential requirement of operational management to achieve full-capacity production while meeting customer demands on time. In a typical LCD Fab, medium-term schedules such as release plans and production plans are critical to achieve the goal of full-capacity production and on-time delivery. Presented in this paper is a framework for weekly planning system generating medium-term schedules using a finite-capacity planning method. Also this paper presents a release planning method applying capacityfiltering algorithm, especially backward capacity-filtering procedure, which is one of the finite-capacity planning methods. In addition, performance analyses using actual data of a TFT-LCD Fab show that the proposed method is superior to existing methods or commercial S/W products generating release plans.