Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

A Model for Integration of Process Planning and Scheduling with Outsourcing in Manufacturing Supply Chain (생산공급사슬에서의 아웃소싱을 고려한 공정계획 및 일정계획의 통합을 위한 모델)

  • Jeong, Chan-Seok;Lee, Young-Hae;Moon, Chi-Ung
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.512-520
    • /
    • 2000
  • An integrated process planning and scheduling model considering outsourcing in manufacturing supply chain is proposed in this paper. The process planning and scheduling considering outsourcing are actually interrelated and should be solved simultaneously. The proposed model considers the alternative process plans for job types, precedence constraints of job operations, due date of production, transportation time and production information for outsourcing. The integrated states include:(1) Operations sequencing, (2) Machine selection, (3) Scheduling with outsourcing under the due date. To solve the model, a heuristic approach based on genetic algorithm(GA) is developed. The proposed approach minimizes the makespan considering outsourcing and shows the best operation-sequences and schedule of all jobs.

  • PDF

A study on the Unmanned Aerial Vehicle(UAV) Flight Test Planning Establishment through Atmospheric Considerations (대기요소 고려를 통한 무인항공기 비행시험계획 수립에 대한 연구)

  • Kim, Yeong-Rae;Lee, Jeong-Suk;Lee, Sang-Cheol;Ko, Sang-Ho;Kang, Ja-Yeong;Choi, Jong-Uk;Seong, Deoky-Yong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.18 no.4
    • /
    • pp.73-79
    • /
    • 2010
  • Flight test is the final and a mandatory process for the development of unmanned aerial vehicles(UAVs) as well as manned. Since most UAVs fly in a low speed and are prone to adverse weather conditions such as air turbulence, atmospheric weather environment around flight test regions will be a critical item to be considered for a flight test planning for UAVs. In this paper, we suggest a decision method for a UAV flight test schedule based on weather conditions of surface and upper atmospheres and also introduce a program for an effective flight test planning through weather forecasts.

High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material) (트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템)

  • Na Hong-Bum;Lee Hyung-Gon;Park Jin-Woo
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF

Rough-cut simulation algorithm for the decision of operations policy at the block paint shop in shipbuilding (조선 도장공정 운영전략 수립을 위한 사전모의실험기법)

  • Chung, Kuy-Hoon;Park, Chang-Kyu;Min, Sang-Gyu;Park, Ju-Chull;Cho, Kyu-Kab
    • IE interfaces
    • /
    • v.14 no.1
    • /
    • pp.59-66
    • /
    • 2001
  • This paper introduces the case study that has been performed at the block paint shop, Hyundai Heavy Industries. First of all, the overall production processes of shipbuilding and research activities conducted by Korean are reviewed with a view-point of production planning. Then HYPOS(Hyundai heavy industries Painting shop Operation System) project is briefly described, which has several modules such as planning module, scheduling module, work order module, and DB(database) management module. Although the HYPOS system has several modules, this paper mainly focuses on the planning module that utilizes the rough-cut simulation algorithm to make a decision about the policy for production schedule. The HYPOS has been operated since June, 2000 and the operation data has been collected for the purpose of future evaluation about the performance of HYPOS system. The evaluation of HYPOS will be shown in a public domain as soon as the enough operation data is available.

  • PDF

A Study on Design and Practical Use of Multi-purpose Auditorium with Priority given to Variable Application in Educational Facility (다목적강당의 계획과 활용에 관한 연구 - 가변성 적용을 중심으로 -)

  • Chi, Hyun-Jung;Lee, Jung-Ran;Lee, Sang-Hong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.12 no.6
    • /
    • pp.5-17
    • /
    • 2005
  • The purpose of the study is to propose architectural design standards of the Multi-purpose Auditorium planning in educational facilities. The success of the design is measured by how well variable elements are applied to parts of Multi-purpose Auditorium and designed and equipped so that all groups-amateurs, professionals, youth, and adult alike-may use it effectively. The use of this facility will extend over a wide range, including concerts, plays, motion pictures, forums, and other forms of presentation. The wall, stage, roof, windows, and furnitures are important parts of Multi-purpose Auditorium and variable elements can applied to these parts. To successfully application of variable elements, it is necessary that these elements are considered in planning phase including time schedule planning. Various elements are permit a more informal and flexible arrangement and extensive learning activity.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

Optimum Construction Duration for Road Tunnel Excavation Works (도로터널 굴착공사의 적정공기 판단기준)

  • Kim, Ha-Na;Kim, Dae Young;Kim, Dae-Young;Jeong, Seong-Chun;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.4
    • /
    • pp.59-64
    • /
    • 2018
  • Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.