• 제목/요약/키워드: Schedule Model

검색결과 714건 처리시간 0.024초

경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구 (Generator Maintenance Scheduling of System Operator in Competitive Electricity Markets)

  • 한석만;신영균;정구형;김강원;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권8호
    • /
    • pp.477-483
    • /
    • 2004
  • In competitive electricity markets, maintenance schedule is submitted by generation companies (GENCOs) and transmission companies (TRANSCOs), and coordinated by Independent System Operator (ISO) with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule. In this paper, it is focused on modeling a coordination algorithm by ISO for the maintenance schedule based on the Simulated Annealing algorithm. The proposed model employs the minimum information such as generator capacity, forced outage rate and generator maintenance schedules. The objective function of this model represents minimization of adjustment on schedules submitted by GENCOs.

Foundation Fieldbus에서 주기적 데이터 스케듈링 기법 및 실험적 평가 (A Scheduling Method of Periodic Data in the Foundation Filedbus and Experimental Evaluation)

  • 송승민;홍승호
    • 제어로봇시스템학회논문지
    • /
    • 제11권2호
    • /
    • pp.167-174
    • /
    • 2005
  • This paper experimentally validates the efficacy of scheduling method that satisfies the performance requirement of periodic data in the Foundation Fieldbus. The scheduling method allocates periodic data traffic to a bandwidth-limited fieldbus medium. The scheduling method generates schedule list that records schedule starting time and schedule period of each periodic data. This study developed an experimental model of a Foundation Fieldbus network system. Using the experimental model, this study showed that the scheduling method can be easily implemented in a practical Foundation Fieldbus network system. The results obtained from the experimental evaluation showed that the scheduling method restricts the delay of periodic data to a pre-specified bound.

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

적정간호수가 산정모형 개발을 위한 연구 (Development of a Nursing Fee Schedule Model)

  • 조소영;박정호
    • 대한간호학회지
    • /
    • 제23권1호
    • /
    • pp.68-89
    • /
    • 1993
  • This study was conducted to develop a model of a fee schedule for nursing services.'Regardless of the demand for skilled and professional nursing service today, the Korean health insurance system does not furnish a chapter for the nursing service fee schedule. A nation-wide survey of hospital nursing service fee schedules was to provide practical and realistic data about how the variety of nursing services are being charged. From September 1990 to April 1991, data from the fee schedule used by twenty hospitals located in eight large cities which are designated large medical regions in the Korea Health Care and Patient Referral System were collected. Nursing services and the fees charged for them were analyzed. The nursing services were subjected to a secondary analysis with referrence to reports on “nursing services to be charged in Korea”. The total number of nursing services recommended by the literatures was 177 : finally 141 types of nursing services were selected by investigator as chargable nursing services. In addition, data on managerial characteristics of the hospitals were collected to discover influential variables for a nursing fee schedule model. Under the assumption that all the managerial characteristics of the hospitals influenced the fee schedule, the following model was tested : Fee of nursing services (C) = f(A₁, A₂, A₃, A₄, A/sub 5/, A/sub 6/, A/sub 7/, A/sub 8/,) When, A₁ = number of nurses A₂ = the first salary of a nurse educated in a four year A₃ = scale of nursing management division A₄ = location of the hospital A/sub 5/ = the type of hospital management (profit / non-profit) A/sub 6/ = number of hospital beds A/sub 7/ = years of hospital operation A/sub 8/ = number and kinds of clinical divisions The results showed that the model should be built as follows : C = f (A₁, A/sub 4/, A/sub 5/) Each nursing service was applied to the fee schedule with consideration for the professional level and time-taken to provide the services. Detailed fee schedules were presented in the related tables. Of the 141 kinds of nursing services, 24.8% were chargeble to the Korea Health Insurance, 32.6% of the nursing services were being paid directly by the patienty. The rest of nursing services (42.6%) were not being charged to any source. It was recommened that the Korea Health Insurance Reimbursement system should add a classification system for nursing services that can be used in the national health care program. Further study is needed about how to include 32.6% of the nursing services now being paid for directly by the patients in the health insurance system.

  • PDF

주문생산 방식의 생산계획 수립을 위한 시뮬레이션 모델 설계 : 판유리 제조 공정을 중심으로 (Simulation Modeling for Production Scheduling under Make-To-Order Production Environment : Focusing on the Flat Glass Production Environment)

  • 최용희;황승준
    • 산업경영시스템학회지
    • /
    • 제42권1호
    • /
    • pp.64-73
    • /
    • 2019
  • The manufacturing companies under Make-To-Order (MTO) production environment face highly variable requirements of the customers. It makes them difficult to establish preemptive production strategy through inventory management and demand forecasting. Therefore, the ability to establish an optimal production schedule that incorporates the various requirements of the customers is emphasized as the key success factor. In this study, we suggest a process of designing the simulation model for establishing production schedule and apply this model to the case of a flat glass processing company. The flat glass manufacturing industry is under MTO production environment. Academic research of flat glass industry is focused on minimizing the waste in the cutting process. In addition, in the practical view, the flat glass manufacturing companies tend to establish the production schedule based on the intuition of production manager and it results in failure of meeting the due date. Based on these findings, the case study aims to present the process of drawing up a production schedule through simulation modeling. The actual data of Korean flat glass processing company were used to make a monthly production schedule. To do this, five scenarios based on dispatching rules are considered and each scenario is evaluated by three key performance indicators for delivery compliance. We used B2MML (Business To Manufacturing Markup Language) schema for integrating manufacturing systems and simulations are carried out by using SIMIO simulation software. The results provide the basis for determining a suitable production schedule from the production manager's perspective.

항공기 엔진 정비 일정 수립을 위한 동적 계획 모델 개발 (Developing a dynamic programming model for aircraft-engine maintenance scheduling)

  • 주성종;신상헌
    • 경영과학
    • /
    • 제13권3호
    • /
    • pp.163-172
    • /
    • 1996
  • According to flying hours, aircraft engines require regular overhaul for preventive maintenance. Because of hostile defense environment of Republic of Korea, the aircraft of republic of Korea Air Force(ROKAF) have been operated at the maximum level of availability and have similar overhaul schedule in several months. The concentration of overhaul schedule in a short period demands additional spare engines far exceeding the spare engines for corrective maintenance. If ROKAF decides to purchase extra engines for the preventive maintenance, the extra engines will be used only for the preventive maintenance and will be excess inventory for the most of aircraft life ccle. Also, the procurement of extra engines is significant investment for ROKAF. To help ROKAF schedule the preventive maintenance without significant spending, this study develops a dynamic programming model that is solvable using an integer programming algorithm. The model provides the number of engines that should be overhauled for a month for multiple periods under given constraints. ROKAF actually used this model to solve a T-59 engine overhaul problem and saved about three billion won at one time. ROKAF plans to use this model continuously for T-59 and other weapon systems. Thus, saving for long term will be significant to ROKAF. Finally, with minor modification, this model can be applied to deciding the minimum number of spare engines for preventive maintenance.

  • PDF

금형 생산관리를 위한 응용 소프트웨어의 개발 (Development of an Application Software for the Die-Production Information Management)

  • 공명달;김정자
    • 산업공학
    • /
    • 제9권2호
    • /
    • pp.143-158
    • /
    • 1996
  • This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.

  • PDF

한국 개(個)교회기록물의 기능분류 방안 (A Study constructing a Function-Based Records Classification System for Korean Individual Church)

  • 마원준
    • 기록학연구
    • /
    • 제10호
    • /
    • pp.145-194
    • /
    • 2004
  • Church archives are the evidential instruments to remember church activity and important information aggregate which has administrative, legal, financial, historical, faithful value as the collective memory of church community. So it must be managed necessarily and the management orders are based on the Bible. The western churches which have a correct understanding about the importance of church records and management order have taken multilateral endeavor to create, manage church archives systematically. On the other hand, korean churches don't have the records management systems. Therefore, Records created in individual church are mostly managed unsystematically and exist as 'backlogs', finally, they are destructed without reasonable formalities. In those problems, the purpose of this study is to offer the way of records classification and disposition instrument with recognition that records management should be done from the time of creation or previous to it. As a concrete device for them, I tried to embody the function-based classification method and disposal schedule. I prefer the function-based classification and disposal schedule to the organization and function-based classification to present stable classification and disposal schedule, as we can say the best feature of the modern organization is multilateral and also churches have same aspect. For this study, I applied DIRKS(Designing and Implementing Recordkeeping Systems) manual which National Archives of Australia provide and guidelines in ICA/IRMT series to construct the theory of the function-based classification in individual churches. Through them, it was possible to present a model for preliminary investigation, analysis of business activity, records survey, disposal schedule. And I took an example of 'Myong Sung Presbyterian Church' which belong to 'The Presbyterian church in Korea'. I explained in detail codifying process and results of preliminary investigation in 'Myong Sung Presbyterian Church', analysis of business activity based on it, process of presenting the function-based classification and disposal schedule got from all those steps. For establishing disposal schedule, I planned 'General Disposal Schedule' and 'Agency Disposal Schedule' which categorized 'general function' and 'agency function' of an agency, according to DIRKS in Australia and ICA/IRMT. And for estimation of disposal date I had a thorough grasp of important records category presented in 'Constitution of General Assembly', interview to know the importance of tasks, and added examples of disposal schedule in western church archives. This study has significance that it was intended to embody 'the function-based classification' and 'disposal schedule' suitable for individual church, applying DIRKS in Australia and ICA/IRMT on absence of the theory or example which tried to present the function-based classification and disposal schedule for individual church. Also it is meaningful to present a model that can classify and disposal real records according to the function in individual church which has no recognition or way about records management.

경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구 (A study on generator maintenance scheduling of system operator in competitive electricity markets)

  • 한석만;신영균;김발호;박종배;차준민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.447-449
    • /
    • 2003
  • In competitive electricity markets, maintenance schedule is submitted by Genco's and Transco's, and coordinated by ISO with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule.

  • PDF

BIM기반 건설공사 일정관리를 위한 정보에 관한 연구 (A study on the Information for the Schedule Management of the Construction based BIM)

  • 박소현;송정화;오건수
    • 디지털콘텐츠학회 논문지
    • /
    • 제16권4호
    • /
    • pp.555-564
    • /
    • 2015
  • 최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해 지고 있다. 발생되는 다양한 정보 중 일정정보는 건설프로젝트의 중심적인 정보이다. 건설현장 관련 참여자간 일정정보교환 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 현재, 건설 산업에서는 건축물의 전 생애 주기 동안 필요한 데이터를 생산하고 관리하는 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 본 연구는 BIM을 기반으로 건설공사의 일정정보를 체계적으로 관리 할 수 있는 일정관리 정보 체계를 구축하는 것이다. 이를 위해 BIM적용 일정관리 업무 프로세스를 구축하였으며, 일정정보를 구축하기 위한 작업분류체계를 도출 하였다. 또한 일정정보 구축에 필요한 속성 중 BIM모델에서 추출 할 수 있는 정보를 도출하고, 일정관리에 필요한 속성정보와 연계하여 일정을 생성 하고 공사 진행 시점별 일정관리를 위한 필요 정보를 제시한다.